On the Generation of Design Products for Defence Systems Acquisition Programs based on the Systems Engineering Methodology (국방획득사업에서 SE 기반 설계 산출물 생성에 관한 연구)

  • Kim, Jae-Chul;Lee, Jae-Chon;Cho, Joon-Yong;Lee, Jae-Cheul
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.11B
    • /
    • pp.1710-1714
    • /
    • 2010
  • The budget for the acquisition and R&D for the national defence systems has come out of tax payers' pockets. On the other hand, the weapon systems become more complex and thus the underlying costs tend to increase continuously. As such, the need for efficiently managing the budget has drastically increased. In accordance with this necessity, the Defence Acquisition Program Administration (DAPA) of Korea has issued the instruction No.65 dictating that systems engineering (SE) must be applied when weapon systems are acquired or developed in Korea. Specifically, a list of the products that should be generated from the acquisition programs is provided. The problem is that the unexperienced companies in the defence systems industry cannot easily know how to approach the new regulation. The purpose of this study is to devise a possible remedy to solve the problem. To do so, we first review the list of the products that are required by DAPA. Then, an appropriate systems engineering processes is studied for each product. Then, a necessary link between each product and SE process activity is identified and summarized. The result obtained may be useful as a stepping stone to develop more efficient method for the list of the products.

An Empirical Study on the Investment Evaluation of Korean Global Companies Using a Real Option Valuation Model (우리나라 글로벌 기업의 실물옵션을 이용한 투자안 평가 실증연구)

  • Jeong, Eui-Jong
    • Plant Journal
    • /
    • v.8 no.3
    • /
    • pp.42-48
    • /
    • 2012
  • Under traditional analysis of the capital budgeting, NPV, it is assumed that management cannot react to deviation from the expected scenario of cash flow at the time of evaluation. In practice, however, it is less likely that the expected scenario will come true when new information arrives and uncertainty is resolved. Uncertainty and risk can be influenced through 'managerial flexibility', which becomes a central instrument for value creation. Real option framework including option to defer, option for staged investment, option to alter, option to abandon, option to switch, etc. takes this managerial flexibility into account. Therefore, it is more appropriate to use real option method to evaluate the project than the traditional DCF(discounted cash flow) tool if the firm has high volatility of the expected returns.

  • PDF

Research about sharing of compensation data between owner and contractor for construction CALS improvement (건설CALS 완성도 제고를 위한 다양한 이해당사자간 보상자료 공유방안 연구)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2010.06b
    • /
    • pp.144-147
    • /
    • 2010
  • 국토해양부에서는 건설산업의 투명성을 제고하고 생산성을 향상시키기 위해 1990년대 후반부터 건설사업정보화(CALS : Continuous Acquisition and Life-cycle Support) 사업을 진행중에 있다. CALS는 제조업의 모든 상품, 즉 주요장비 또는 다양한 상품 등을 획득하기 위한 설계, 생산과정, 또는 보급, 조달 및 이를 운영하는 운용지원과정을 연결시키고, 이들 과정에서 사용되는 각종 정보를 표준이라는 공통 창구를 통해 디지털화하여 컴퓨터상으로 정보를 통합하여 자동화시키는 개념이다. 이는 컴퓨터 네트워크를 이용해 상호 교환이 이루어지는 자동화되고 통합된 환경으로 변환시키는 정부와 기업간의 경영전략이라고 볼 수 있다. 이러한 개념에서 확장된 건설CALS는 건설공사 전 과정, 즉 기획, 설계, 조달, 시공, 유지보수 등의 과정에서 발생하는 각종 정보를 다양한 이해당사자가 교환하고 공유하기 위한 개념으로 출발하였으며, 현재 이를 지원하기 위한 5개의 단위시스템을 개발하여 운영중에 있다. 이중 용지보상시스템은 건설공사의 업무중에 시공단계에서 이루어지는 보상업무를 지원하는 시스템이다. 보상업무는 건설사업 과정 중에서 민원인과 직접대면하는 일이 많고, 액수도 클 뿐만 아니라 개인의 소유권과 밀접한 관계가 있기 때문에 분쟁의 소지가 매우 많다. 이에 본 논문에서는 보상업무 수행시 다양한 이해당사간의 각종 보상자료 교환체계 확립을 통한 업무 선진화방안 제시를 통해 업무의 투명성을 최대화하고 민원을 최소화하여, 보상업무 담당자에게는 업무의 효율성을 제고하고 민원인들에게는 국가행정에 대한 신뢰도를 높일 수 있는 보상업무 선진화 방안을 제시하고자 한다.

  • PDF

레이저 추적시스템의 원시자료 후처리 및 정규점 산출 연구

  • Seo, Yun-Gyeong;Ryu, Dong-Yeong;Jo, Jung-Hyeon;Kirchner, Georg;Im, Hong-Seo;Park, In-Gwan;Im, Hyeong-Cheol;Park, Jong-Uk
    • Bulletin of the Korean Space Science Society
    • /
    • 2009.10a
    • /
    • pp.42.1-42.1
    • /
    • 2009
  • 한국천문연구원은 우주측지용 레이저 추적 시스템 개발 사업 중 현재 이동형 시스템(ARGO-M) 1기를 개발 중에 있으며, 2009년 5월에 시스템 개념 설계 검토(SDR) 회의를 수행하였고 현재는 예비 설계 단계를 진행 중이다. ARGO-M을 구성하는 5개의 서브시스템 중 하나인 운영시스템은 레이저 관측에 필요한 각종 서브시스템을 제어하고 환경을 종합 판단 후 이를 관측에 반영하며, 실제 관측을 통해 획득한 데이터를 통합 처리 및 전송하는 역할을 담당하고 있다. 현재 본격적인 예비 설계 수행 단계에 있는 운영시스템은 우선적으로 핵심이 되는 소프트웨어의 설계를 위해 오스트리아의 Graz에 위치한 IWF(Institut fur Weltraumforschung) 소속 SLR(Satellite Laser Ranging) 관측소를 2009년도에 방문하여 운영 전반에 관련한 소프트웨어의 로직분석 작업을 수행하였다. Graz 운영시스템 중 소프트웨어관련 시스템은 크게 KHz급 반복율을 가진 레이저를 사용하여 위성까지의 거리 측정에 해당되는 실시간 시스템과 실시간 측정을 통해 저장된 관측 원시 자료를 이후 분석을 수행하는 비 실시간(Non-real time) 시스템으로 나눌 수 있다. 이 중에서 비 실시간 시스템은 원시 자료 분석을 통해 시간 및 거리 바이어스 적용, 노이즈 제거 등의 후처리 과정과 다양한 통계 분석 그리고 SLR시스템의 최종 산출물인 정규점(Normal Point) 생성 등을 수행한다. 이번 소프트웨어 분석 연구를 통해 얻어진 주요 알고리즘과 다양한 다이어그램을 포함한 결과물은 ARGO-M 운영시스템에 최적화하도록 소프트웨어 재구성 및 개발에 반영할 예정이다.

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

Risk-based Safety Impact Assessment for Construction Projects (위험도 접근방법에 의한 건설사업 안전영향평가방안에 관한 연구)

  • Choi Hyun-Ho;Jung Pyung-Ki;Seo Jong-Won;Choi Ook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.504-509
    • /
    • 2004
  • Safety assessment of construction projects may be affected by various factors such as types and scale of projects, construction methods, procedure, climactic, and site conditions etc. Presently, in planning and design phases, designers are still often uncertain of their responsibilities, l3i]I information and training of safety. Therefore, designers are still failing to exploit the potential that have to eliminate and reduce risks on site. In this study, the concepts of safety impact assessment is introduced in order to derive the performing design for safety in design phase. For this purpose, a framework for safety impact assessment model using risk-based approach for construction projects is suggested. The suggested model includes of information survey and scenarios, classification of safety impact factors occurred by design and construction, and quantitative estimation of magnitude and frequency. Moreover, the checklist which is enable to identify relationship between safety impact factors and design factors is developed and the methodology of safety impact assessment model using risk-based approach is also proposed.

  • PDF

The Yellow Sea Ecoregion Conservation Project : the Present Situation and its Implications (황해생태지역 보전사업 추진현황 및 시사점)

  • Kim, Gwang Tae;Choi, Young Rae;Jang, Ji Young;Kim, Woong-Seo
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.4
    • /
    • pp.337-348
    • /
    • 2012
  • The Yellow Sea Ecoregion Conservation Project is a joint international project which is carried out under the purposes of conserving the habitats in the Yellow Sea Ecoregion and biodiversity from various threats that damage ecosystems, informing the importance and value of the Yellow Sea Ecoregion, and promoting the understanding and interests of Korea, China and Japan. Subsequent to the Yellow Sea Ecoregion Planning Programme which had been performed during the period from 2002 to 2006, the Yellow Sea Ecoregion Support Project has been performed over 7 years in total from 2007 to 2014. Panasonic is sponsoring the financing of the project, and the organizations in charge of the project by country are Korea Institute of Ocean Science & Technology for Korea and World Wide Fund for Nature branches for China and Japan. While the Yellow Sea Ecoregion Planning Programme was focused on the biological assessment and the selection of potential priority area by scientific review, the Yellow Sea Ecoregion Support Project is oriented toward practical activities targeting more diversified stakeholder. Especially, this project plans to support direct conservation activities in the region and participation and cooperation from local residents. The project plan is comprised of 3 phases. During the first period from 2008 to 2009, small grant projects were operated targeting 16 institutions of Korea and China, and for the second period from 2010 to 2012, one place each was selected as demonstration site for habitat conservation in Korea and China respectively and supported for three years to introduce the conservation method based on international standards such as the management of marine protected areas, ecosystem-based management and community-based management and simultaneously to develop habitat conservation activities suitable for national and regional characteristics. During the period from 2013 to 2014 which is the last phase, the project plans to distribute the performance of small grant projects and demonstration site activities through a series of forums among stakeholder. Through the activities described above, the recognition of general public on the conservation of the Yellow Sea Ecoregion was changed positively, and community-based management began to be reflected in the policies for the marine protected areas of central and local government.

Performance and Alternative Policies of Techno-Park Built-up Project in Korea (테크노파크 조성사업의 성과와 정책과제)

  • Lee, Chul-Woo;Kim, Myeong-Yeob
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.12 no.1
    • /
    • pp.19-37
    • /
    • 2009
  • The techno-park built-up project of Korea had begun in order to support regional enterprises since 1997. The number of techno-parks increased from 6 in 1997 to 17 in 2009 with various enterprise supporting services such as a new enterprise breeding, pilot production, and education and training. By way of renewing regional innovation promoting system, revising technopark law, and starting second step techno-park project, techno-parks have become centers for regional technology innovation, and cultivation of regional technology-based companies. Alternative policies for the development of techno-park projects are as follows: revitalizing the network among enterprises, universities, research institutes, and government; strengthening the ability to draw up projects in nurturing regional industry; and the establishment of fixed channels to support SME in the region.

  • PDF

Interface Management Practices for Minimizing Design Change - Focusing on the Case Study - (설계간섭 최소화를 위한 인터페이스 관리방안 - 사례현장 적용 내용을 중심으로 -)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.22-29
    • /
    • 2013
  • As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.

The Impacts of R&D Capabilities of Small Companies on Organizational Competences and R&D Commercializing Performances (소기업의 R&D역량이 조직역량 및 R&D사업화에 미치는 영향)

  • Kim, Sun-Ha;Hong, Jin-Hwan;Lee, Hun-Hee
    • Korean small business review
    • /
    • v.43 no.3
    • /
    • pp.21-42
    • /
    • 2021
  • Since R&D (Research and Development) of small companies is becoming more and more important, and government R&D grants are still increasing. This study aims to investigate the factors influencing R&D performance of small companies and necessary capabilities of them. Based on empirical study of 3,636 small companies which participated and completed government R&D grant project, technology innovation capability and technology commercializing capability of small companies are positively related with organizational competences, with moderating effects of entrepreneurship. In addition, their R&D capabilities are not significantly related with R&D commercializing performance directly, but mediated with organizational competences. The results of study suggest implications of measuring the R&D performance of small companies and government support policy with the importance of organizational competences as an intermediate variable of R&D performances.