Interface Management Practices for Minimizing Design Change - Focusing on the Case Study -  

Ahn, Sanghyun (Kunwon Engineering Corporation Limited)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.6, 2013 , pp. 22-29 More about this Journal
Abstract
As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.
Keywords
Interface; Consultative group; Checklist; Interface list management; PMIS;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Ministry of Land, Infrastructure and Transport, Overseas Construction Division(2010), 716 hundred million dollar winning overseas construction contracts in 2010
2 National Statistical Office, Economic Statistics Bureau, Short-Term Industry Statistics Division(2012), Survey of Construction Tendency
3 Moon. H, Choi. M, Ryu. S, Park. J(2009), "Building performance analysis interface based on BIM", Journal of Architectural institute of Korea, Vol. 25 No. 10, pp.271-278   과학기술학회마을
4 Park. D, Jun. Y, Yoo. S, Kim. J, Kim. J(2009), "A study on the minimization of design variation using BIM", Korea institute of construction engineering and management conference journal, pp. 641-645
5 Seo. J(2012), "A collaborative process of BIM-based clash detection for constructability reiew", Hanyang University, Department of sustainable architectural engineering, Master's thesis
6 Oh. J, Kim. W, Yi. K, Suh. S, Lee. H(2000), "The establishment of design interface management model for SOC projects", Journal of Korea institute of construction engineering and management, Vol. 1 No. 3, pp. 116-123   과학기술학회마을
7 Lee. N, Son. M, Kim. J, Ji. S, Hyun. C(2011), "Development of construction documents checklist for preventing error process in public construction projects", Journal of Architectural institute of Korea, Vol. 27 No. 2, pp.149-158   과학기술학회마을
8 Im. C, Lee. G(2003), "The Research about increase and decrease of construction cost by alteration of design", Journal of Architectural institute of Korea, Vol. 4 No. 4, pp. 106-113   과학기술학회마을