Preliminary Scheduling Based on Historical and Experience Data for Airport Project (초기 기획단계의 실적 및 경험자료 기반 공항사업 기준공기 산정체계)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Sungrae;Lee, Ikhaeng;Lee, Changweon;Jeong, Jinhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.26-37
    • /
    • 2017
  • Preliminary scheduling at the initial stage of planning phase is usually performed with limited information and details. Therefore, the reliability and accuracy of preliminary scheduling is affected by personal experiences and skills of the schedule planners, and it requires enormous managerial effort (or workload). Reusing of historical data of the similar projects is important for efficient preliminary scheduling. However, understanding the structure of historical data and applying them to a new project requires a great deal of experience and knowledge. In this context, this paper propose a framework and methodology for automated preliminary schedule generation based on historical database. The proposed methodology and framework enables to automatically generate CPM schedules for airport projects in the early planning stage in order to enhance the reliability and to reduce the workload by using structured knowledge and experience.

인천국제공항철도 건설사업관리 수행체계

  • Yoon Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2003
  • 국내 건설프로젝트의 대부분은 설계, 시공, 운영이 별도의 체계로 운영이 되이온 경향이 많은 바, 이를 개선하기 위해선, 기획단계에서 운영단계에 이르는 건설생애주기 단계별로 수행업무절차를 체계적으로 정립하여야 한다. 본 고에서는 이를 위하여 인천국제공항철도사업을 모델로 바람직한 대형공사에서의 사업관리 수행체계에 대하여 알아보았다.

  • PDF

Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

디지털 콘텐츠의 가치평가 시스템에 관한 연구

  • Kim, Sang-Su;Yun, Sang-Ung;Gwon, Dong-Hwan
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.475-480
    • /
    • 2007
  • 본 연구에서는 디지털 콘텐츠의 가치를 체계적으로 평가할 수 있는 시스템의 프로토타입을 개발하였다. 개발된 가치 평가 시스템에서는 디지털 콘텐츠의 가치를 기획 단계, 개발 단계, 사업화 단계로 나누어서 평가할 수 있을 뿐만 아니라 디지털 콘텐츠를 사업화하는 과정에서 부딪히는 불확실성을 세 가지 시나리오로 나누어서 평가할 수 있다. 이를 통해서 디지털 콘텐츠의 가치를 객관적으로, 체계적으로, 동태적으로 평가할 수 있을 뿐만 아니라 디지털 콘텐츠의 기획, 개발, 사업화에 관련되어 있는 구성원들의 이견을 조정할 수 있다. 또한 이 같은 평가 시스템을 활용함으로써 디지털 콘텐츠를 사업화하는 과정에서 발생할 수 있는 위험을 관리할 수 있기 때문에 합리적인 투자 의사결정을 수행할 수 있다.

  • PDF

DB제작을 위한 계획수립과 추진방법 - 문헌 DB를 중심으로

  • Lee, Chang-Han
    • Digital Contents
    • /
    • no.8 s.3
    • /
    • pp.40-45
    • /
    • 1993
  • "본 글에서는 실제 데이터베이스의 구축단계 중 첫번째인 기획단계에 있어서 데이터베이스시스템을 구성하는 서브시스템들의 기본적인 설계 방향과 이들 시스템을 구축하는데 필요한 조직, 인력, 예산 등을 설정하는 개념설계 방법을 설명하고, 이에 기획안을 효과적으로 표현하기 위한 사업계획서 작성방법에 관하여 주로 인하우스DB에 촛점을 맞추어 앞으로 3회에 걸쳐 소개하고자 한다."

  • PDF

A Study on Public Health Doctors' Participation in District Public Health Program of Health Sub-centers in Korea (보건지소 공중보건의사의 지역보건사업 참여 실태)

  • Lee, Jae-Chun;Park, Yong-Moon;Ahn, Song-Vogue;Lee, Hae-Young;Hwang, Jin-Won
    • Journal of agricultural medicine and community health
    • /
    • v.28 no.1
    • /
    • pp.53-66
    • /
    • 2003
  • Objectives: To investigate the state of medical care around health sub-centers, public health doctors' participation and opinion in the process of district public health programs. Methods: The study included 1,036 public health doctors who worked at health sub-center all over the country. The data were collected for Feb, 2002 using self-administered questionnaire by mail. Results: One or two doctors were working at health sub-center and 33.5% of health sub-centers was located in the region of the separation of prescription and dispensing. There were another medical facilities in 45.9% of the administrative district(eup or myon) where health sub-centers were located. The count of medical utilization went down to 14.8${\pm}$14.8 per a day in Nov, 2001 from 18.0${\pm}$15.6 in May, 2000, and the decline was much more in the region of the separation of prescription and dispensing. Among public health programs in health sub-centers, public health doctors participated mostly in preliminary medical examination for vaccination and least in health education. They participated in implementation rather than planning or evaluation of health program. Over a half of public health doctors were found to be positive that health programs implemented in their health sub-centers would promote the level of health in community people and they were willing to participate in district public health program if community people were in need. Conclusions: Recently health sub-centers are required to turn into health promotion facilities rather than medical practice facilities. Health program in health sub-centers will be advanced in both quality and quantity by turning the role of public health doctors who have provided medical services mainly into managing health program. Persistent education about managing health program and the policy to motivate participation in health program should be provided for public health doctors.

  • PDF

Structuralization Expected Outcome of Social Welfare Program Based on Community Network : Using Concept Mapping Method (지역사회네트워크를 기반으로 한 사회복지프로그램 기대성과 구조화 : 컨셉트 맵핑(concept mapping)을 활용하여)

  • Kwon, Sunae
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.5
    • /
    • pp.107-116
    • /
    • 2014
  • The purpose of this study is to verify the applicability of concept mapping in the process of planning social welfare program based on community network. Concept mapping is a kind of decision-making method that structuralized complex ideas and presented visually. Already, concept mapping is widely utilized in counseling, nursing and public health area to plan and evaluation their program and service. For recent, effectiveness of concept mapping has been reported. Concept mapping is a effective decision-making method that they recognize outcome gap between service provider and client, reach the outcome's consensus in counseling and nursing, medical area. In this study, we conceptualized 3rd year outcomes of Community Impact Project that was supported from Busan Chest using concept mapping. This CI project intervenes children and youth who lives in Buk-gu, Busan. Concept mapping has six stages-preparation, collecting ideas, structuring statements, representing statement, interpreting the results of the analysis, applying the results. We followed these steps. The participants were working at social welfare organizations, total 11 persons. We obtained 60 statements and analyzed using multidimensional scaling. we collected 5 clusters, cluster 1 'awareness and attitude change of children and youth', cluster 2 'social system change of children and youth', cluster 3 'friendly community formation', cluster 4 'community people change', cluster 5 'service provider change'. As a result, among total 5 clusters formed, 'awareness and attitude change of children and youth' came to the strongest outcomes. When concept mapping was applied to the program planning, the consensus of the opinion came easily in the decision-making process, and the participants were empowered. In addition, clear conceptualization on each element of the program planning was made.

A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.