1 |
Korea ON-line e-Procurement System, Available From: http://www.g2b.go.kr (accessed July., 11, 2018)
|
2 |
Korea Institute of Civil Engineering and Building Technology, Fluctuation of construction cost index (Housing), Available From: http://cost.kict.re.kr/gnu/ (accessed July., 11, 2018)
|
3 |
S. H. Ji, M. S. Park, H. S. Lee, K. H. Seong, Y. S. Yoon, "Method of Quantity Data Analysis for Building Construction Cost Estimation", Korean Journal of Construction Engineering and Management, vol.9, no.6, pp. 235-243, 2008.
|
4 |
M. S. Park, K. H. Seong, H. S. Lee, S. H. Ji, S. Y. Kim, "Schematic Cost Estimation Method using Case-Based Reasoning", Korean Journal of Construction Engineering and Management, vol.11, no.4, pp. 22-31, 2010.
DOI
|
5 |
J. H. Kim, "Stochastic Hybrid Cost Prediction Model of Construction Project in Early Stage", Graduate School University of Seoul, Master's Thesis, 2014.
|
6 |
N. Jun, J. U. Choi, H. M. Choi, J. H. Kim, "A Study on Estimating Construction Cost of Apartment Housing Projects Using Genetic Algorithm-Support Vector Regression", Korean Journal of Construction Engineering and Management, vol.15, no.4, pp. 68-76, 2014. DOI: http://doi.org/10.6106/KJCEM.2014.15.4.068
DOI
|
7 |
J. H. Yim, J. M. Park, O. K. Kim, "Cost Estimating Method of Public Building Construction through Construction Scale", Journal of the Korea Institute of Building Construction, vol.15, no.3, pp. 307-316, 2015. DOI: http://doi.org/10.5345/JKIBC.2015.15.3.307
DOI
|
8 |
C. T. Hyun, G. H. Go, J. Zhengxun, "Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk", Journal of the Korea Institute of Building Construction, vol.18, no.3, pp. 295-303, 2018. DOI: http://doi.org/10.5345/JKIBC.2018.18.3.295
DOI
|
9 |
K. S. Ha, J. K. Lee, "A Study on the Prediction of Civil Construction Cost on Apartment Housing Projects at the Early Stage", Journal of the Korea Academia-Industrial cooperation Society, vol.13, no.9, pp. 4286, 2012. DOI: http://doi.org/10.5762/KAIS.2012.13.9.4284
|
10 |
S. M. Ji, C. T. Hyun, H. S. Moon, "Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects", Korean Journal of Construction Engineering and Management, Vol.13, No.2, pp. 97, 2012.
|