Journal of the Korea institute for structural maintenance and inspection
/
v.10
no.3
/
pp.165-175
/
2006
To analyze the deformation and failure of slopes, generally, two types of model, Polynomial model and Growth model, are applied. These two models are focused on the behavior of the slope by time. Therefore, this research is more focused on predicting of slope failure than analyzing the slope behavior by time. Generally, Growth model is used to analyze the soil slope, to the contrary, Polynomial model is used for rock slope. However, 3-degree polynomial($y=ax^3+bx^2+cx+d$) is suggested to combine two models in this research. The main trait of this model is having an asymptote. The fields to adopt this model are Gosujae Danyang(soil slope) and Youngduk slope(rock slope), which are the cut-slope near national road. Data from Gosujae are shown the failure traits of soil slope, to the contrary, those of Youngduk slope are shown the traits of rock slope. From the real-time monitoring data of the slope, 3-degree polynomial is proved as excellent system to analyze the failure and behavior of slope. In case of Polynomial model, even if the order of polynomials is increased, the $R^2$ value and shape of the curve-fitted graph is almost the same.
Cha, Du Song;Choi, Byoung Koo;Koo, Sung Dae;Oh, Jae Heun
Journal of Forest and Environmental Science
/
v.20
no.1
/
pp.93-109
/
2004
To provide the basic informations related to forest road construction of mountainous terrain, we analyzed changes of the road structure factors such as banking and cutting slope gradients, slope length, road width by the environmental factors such as locations, slope gradients, soil types, road position on physically stabilized forest roads constructed in Gangwon-do. All factors related to the road structures by locations were significant except for banking slope length. Road width, longitudinal gradients, banking and cutting slope length by slope gradients were not significantly different and banking slope gradients in the range less than $30^{\circ}$, from $30^{\circ}$ to $35^{\circ}$ and more than $40^{\circ}$ and cutting slope gradients were significantly different for all areas. Road width, longitudinal gradients, banking slope length by soil types were not significantly different and others were significantly different. All factors related to the road structures by road position were significant except for cutting slope gradients.
The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.
A reliability analysis is performed to investigate the influence of the uncertainty from few in-situ samples and inherent heterogeneity of the ground on the probability of failure for a rock cut slope. The results are compared with those of deterministic slope stability analysis. The random variables used are unit weight of the rock, the angle of potential slope of failure, and cohesion and internal friction angle of joints. It was found that the rock slope in which the factor of safety satisfied the minimum safety factor in the deterministic analysis has high probability of failure in the reliability analysis when the weak geological strata are involved in the cut slope. The probability of failure of rock slope is most sensitive to the mean and standard deviation of cohesion in rock joint among the random soil parameters included in the reliability analysis. Sensitivities of the mean values are larger than those of standard deviations, which means that accurate estimation of the mean for the in-situ geotechnical properties is important.
Kim, Dong Seong;Kim, Kee Dong;Ko, Man Gi;Kim, Kyoung Ju
한국방재학회:학술대회논문집
/
2011.02a
/
pp.183-183
/
2011
전 국토의 65%가 산악지형으로 이루어져 있는 우리나라는 도로개설 및 산업기지 건설, 대규모 주택단지 개발 등으로 자연사면을 변형시키는 규모나 빈도가 증가하고 있고, 최근에는 기상이변에 의한 집중호우가 빈번히 발생하여 절토사면에서 낙석이 발생할 위험이 점점 높아지고 있는 실정이다. 낙석방지를 위한 대책공법으로는 낙석방지 망, 낙석방지 울타리 등이 있으며 이중에서 낙석방지 울타리는 국내의 국도 낙석방지 대책공법 중 70% 이상을 차지하고 있다. 그러나 국내 설계지침에는 낙석방지 울타리에 대한 다양한 성능등급과 성능평가를 위한 표준화된 시험방법이 제시되어 있지 않아 현장여건을 고려하여 적절한 낙석방지 울타리를 선정하고 낙석방지 울타리들의 성능을 비교검토하기에 어려움이 있다. 유럽의 경우 유럽연합 출범이후 낙석방지 시설에 대한 통합기준의 필요성이 대두되어 유럽 여러 나라의 성능평가 방법과 스위스의 설계지침을 고려하여 2008년에 유럽 통합 지침인 ETAG 27을 제정하였다. ETAG 27에는 낙석방지 울타리의 성능등급이 100kJ~4,500kJ이상 9등급으로 분류되어 있고 성능등급 별로 Service Energy Level과 Maximum Energy Level에 대하여 실물시험을 통한 성능평가 시험과 구성요소에 대한 검증시험을 수행하도록 되어있다. 실물시험은 낙석에너지의 산정과 낙석질량의 타격위치를 정확하게 결정할 수 있는 방법을 이용하여 수행토록 규정되어 있다. 미국의 경우에는 주별로 상이한 설계기준으로 인하여 발생하는 문제를 해소하기 위하여 2003년에 스위스의 설계지침을 준용하여 통합기준인 NCHRP Report 20-07을 결정하였다. NCHRP Report 20-07에는 낙석방지 울타리의 성능등급이 100kJ~5,000kJ까지 9등급으로 분류되어 있고 성능등급 별 낙석질량이 규정되어 있으며 등급별 낙석에너지의 50%와 100%에 대하여 실물시험을 통한 성능평가 시험을 수행하도록 되어 있다. 실물시험은 낙석에너지의 산정과 낙석질량의 타격위치를 정확하게 결정할 수 있는 방법을 이용하여 수행토록 규정되어 있다. 낙석방지 울타리에 대한 국내 설계지침과 유럽과 미국의 설계지침을 비교분석하고 국내에서 수행된 실물실험을 통한 성능평가 연구결과를 검토하였다. 또한 구성요소의 역학적 특성변화가 전체 시스템의 성능에 미치는 영향을 조사하기 위해서 국내 설계 지침에 제시된 낙석방지 울타리에 대하여 컴퓨터 시뮬레이션을 이용한 성능평가를 수행하였다. 이러한 연구결과에 근거하여 국내 설계지침은 현장여건에 따라 적절한 낙석방지 울타리를 선정할 수 있도록 다양한 성능등급을 규정하고, 낙석방지 울타리의 성능을 합리적으로 비교검토 할 수 있게 하는 표준화 성능평가 시험방법과 평가기준을 정립하며, 구성요소의 품질에 대한 신뢰성을 확인하는 구성요소의 검증시험을 포함하는 방향으로 개선될 필요가 있는 것으로 조사되었다.
Proceedings of the Korean Geotechical Society Conference
/
2002.11b
/
pp.103-114
/
2002
Stability of cut-slope is considered to have a deep relationship with rock types since rock has its own engineering and geological characteristic such as shear strength, durability, weathering profile, geological structures. Therefore, analysis of geological and engineering characterisics of rock mass is essential for the evaluation of rock slope stability This paper introduces the statistical data of slope failure cases which was collected from highway slopes constructed in sedimentary rock mainly of shale in Ky ng-sang Basin. Primary failure feature in this area is planar failure along the bedding regardless of slope geometry. Even a disasterous slope failure case due to the thick clay layer between the beddings was reported. Failures and rock fall were reported to ocurred frequently after the completion of cutting due to the weathering, so long-term slope stability should be considered as a important factors in design.
Proceedings of the Korean Geotechical Society Conference
/
2003.06a
/
pp.33-42
/
2003
Since the cut slope has been big concern due to frequent failures, the government decided to include cut slopes in the“Act for Safety Control of Public Structures”. Based on the Act, the cut slope whose height is over 50m and length is over 200m should be inspected on the regular basis. According to the Act, KISTEC developed the objective evaluation method for the condition of cut slope. The evaluation method is divided into two categories: evaluation for damaged condition and evaluation for failure affecting factor. Based on the evaluation results, the cut slope is graded from A to E. In this study, the process to evaluate the cut slope condition and the evaluation criteria to divide the grade of cut slope are introduced.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2006.04a
/
pp.541-546
/
2006
Recently, slope failures are happen to natural disastrous when they occur in mountainous areas adjoining highways in Korea. The accidents associated with slope failures have increased due to rapid urbanization of mountainous areas. Therefore, Regular maintenance is essential for all slope and needs maintenance of road safety as well as road function. The purpose of this paper is to recommend a standard of a $N_{10}^{\sim}$ value of Distribution of a potential failure layer using PPT(Portable penetration test).
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.87-96
/
2010
PAP method is a combined measures which consist a anchored retaining wall method with permanent ground anchors and vertical precast concrete panels, step by step on the slope surface. And soil is back filled between slope and vertical precast panels. Therefore, this method is more effective than any other ground anchor reinforcing methods of slope stability, for example cross type concrete block ground anchor or buttress concrete block ground anchor method. Because of increasing effective anchor force and green tree planting.
Proceedings of the Korean Geotechical Society Conference
/
2006.10a
/
pp.229-240
/
2006
Most of rock slopes contain a lot of discontinuities which have a specific direction and various characteristics. In general, the collapses of the rock slopes occur when the sliding dip of the discontinuity is higher than the internal friction angle and also smaller than the free-air plane of the slope. If a general slope theory is only considered in the case of field exploration of the slopes, there is a possibility that dangerous slopes might be estimated as stable slopes. We mention problems that can easily fail to notice something in field exploration and propose the alternatives to solve the problems through the case studies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.