A Study on the Actual Condition for Reinforcing the Reponse Capacity at a Site of Forest Fire (산불현장 대응역량 강화를 위한 실태조사 연구)

  • Eom, Tae-Su;Koo, Won-Hoi;Baek, Min-Ho
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2017.11a
    • /
    • pp.117-118
    • /
    • 2017
  • 본 연구에서는 산불현장 대응인력 역량강화와 관련하여 국내 산불현장 대응인력에 대한 분석을 실시하였으며 인터뷰와 현장조사 등을 통해 국내산불 대응사례를 조사하고 문제점과 개선점을 파악하였다. 이와 같은 조사를 토대로 산불 대응에 대한 개선점을 제시하고자 한다.

  • PDF

A Study on Activation of Cooperative Employment through Long-term Field Placement: Based on Kumoh Institute of Technology including 3 Universities Case Study (장기현장실습을 통한 연계취업 활성화 방안 연구: 금오공과대학교 외 3개대학 사례를 중심으로)

  • Lee, Seok-moon;Jeong, Yeon-koo
    • Journal of Practical Engineering Education
    • /
    • v.9 no.1
    • /
    • pp.31-39
    • /
    • 2017
  • Due to quantitative growth focused on short-term field placement and excessive competition between universities, the need for long-term field placement model is increasing and participation of government and universities is increasing for effective on-the-job training. In order to solve the problems of shortage of R&D manpower in small and medium sized companies, Kumoh Institute of Technology and three participating universities have been conducting industrial internship as R&D long-term field placement program from 2015. Students undertake long-term on-the-job training in the R & D department for six months to improve their R & D skills and strengthen their work capacity. In this paper, we propose effective ways of stimulating cooperative employment through long-term field placement in R&D departments from pre-preparation stage to ending stage through comparative analysis of cases of industrial internship in 2015 and 2016.

Tunnelling in Bangkok - Two Case Studies (방콕의 터널공사 - 두 개의 사례연구)

  • Teparaksa, Wanchai;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.153-163
    • /
    • 2005
  • This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.

  • PDF

A Case Study of GTX A Tunnel Station Blasting with Electronic Detonator (GTX A 터널정거장에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.24-34
    • /
    • 2021
  • Electronic detonators are widely used in various construction sites due to accurate delay time. Including the cases with exceeded noise and vibration from site using electric/non-electric detonator, electronic detonators are used to improve blast fragmentation or to reduce the cost of secondary partial blasting. Furthermore, the number of cases using electronic detonators are increased for reduction of the cost and construction period by maximizing operations efficiency. This case study is about applying electronic detonators on large section station, tunnel construction site which is the part of urban area GTX A project. Although it was initially planned to utilize non-electric detonators, damage was inflicted on safety-thing. We have considered blasting method using electronic detonators as solution of this problem. By applying electronic detonators, we not only satisfied environmental regulations but also prevented nearby safety-thing from getting damaged. In addition, we were able to shorten the construction period than the initial plan by conducting single simultaneous blasting on large section station, in order to ensure safe and efficient construction.

A Improvement Plan for Fire Fighting Activity of Rack- Type Warehouse Based on Case Study and Field Interview (사례분석과 현장인터뷰를 통한 적층형 대형창고 소방활동 개선방안 연구)

  • Kim, Woon Hyung;Seo, Dong Hun;Ham, Eun Gu
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.1
    • /
    • pp.67-75
    • /
    • 2019
  • Purpose: The purpose of this study is to suggest a systematic improvement plan for strengthening fire fighting ability of domestic rack- type warehouse buildings. Method: A fire case of small warehouse with sandwich panel structure and four design review of large warehouse with fire endurance structure were analyzed. Also, interviewed a group of 11 fire fighters who had 20 years field experience. Results: A provision of mobile equipment for initial fire fighting, accessibility of more than three sides, installation of internal entrance windows, proper placement of outdoor fire fighting equipment, image processing of fire site informations, and provide more incentives on the field commander are main factors of improvement plan. Conclusion: Effective standard operation procedures (SOP) and safety standards should be established and applied for each stage of the dispatch and on-site response considering the fire characteristics and risk factors of each warehouse by scale.

A Case Study of Deep Shaft Blasting for Reducing Ground Vibration in Urban Area (도심지의 대심도 수직구 발파에서 지반진동저감 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Jung, Min-Sung;Lee, Hyeung-Jin;Na, Gyeong-Min
    • Explosives and Blasting
    • /
    • v.39 no.2
    • /
    • pp.15-26
    • /
    • 2021
  • Domestic electronic detonators are used widely in many quarry and construction sites since its launch at 2013. In the case of SOC projects conducted in the city, most of them are designed in high-depth to reduce complaints. The high-depth excavation needs a long construction period and huge cost for building shaft and ventilation hole. Mechanical excavation method is applied when safety things are located nearby the site. Solidity of rock and machine's performance affect on the method's efficiency. So as the efficiency is getting lower, the construction period is extended, and the cost is increases as well. This case study is about changing the machine excavation method to the blasting method which is electronic detonator applied at the shaft construction site in the city. This is an example of using electronic detonators on the construction site in reducing blast-noise and vibration while meeting environmental regulatory standards.

Analysis of Application Cases and Evaluation of Effectiveness on Portable Dynamic Cone Penetration Test (DCPT) to Identify the Deterioration Cause of Damaged Reinforced Earth Walls (보강토옹벽의 피해원인 규명을 위한 휴대형 동적콘관입시험(DCPT) 적용사례 분석 및 효용성 평가)

  • Lee, Kwang-Wu;Cho, Sam-Deok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.4
    • /
    • pp.95-109
    • /
    • 2020
  • In this study, a total of six site cases were reviewed to assess the site applicability of portable dynamic cone penetration test (DCPT) by identifying the cause of damage to the damaged reinforced earth wall using portable dynamic cone penetration test. An improved dynamic concrete penetration tester was used at the site to enable ground surveys of more than 6 meters. The test results were compared with the results of the standard penetration test (SPT) and the correlation was analyzed. Through the analysis of various field application cases, it was found that portable dynamic cone penetration test was very convenient to apply at the site of the damaged reinforced earth wall, and DCPT could play a major role in identifying the cause of damage and verifying stability of the retaining wall by continuously identifying the ground strength. In addition, it was found that the results of the dynamic cone penetration test and the standard penetration test showed a correlation of N≒(1/3~2/3)·Nd in sandy soil.

Case Studies for the Stress Measurements on the Shotcrete Tunnel Lining (터널에서의 숏크리트 응력 측정 사례 연구)

  • Kim, Hak Joon;Kim, Mi-Ran
    • The Journal of Engineering Geology
    • /
    • v.24 no.1
    • /
    • pp.81-89
    • /
    • 2014
  • Stress measurements of shotcrete lining were performed to evaluate the stability of the primary lining and to determine the thickness and the construction timing of the secondary lining. The current situation of stress measurements of shotcrete and problems related to judging the safety of shotcrete linings are presented, based on the results of several case studies. An improved method of performing stress measurements on shotcrete lining is also presented. In evaluating the safety of shotcrete lining, the use of absolute values of measured stresses would improve the reliability of the measurements.

Development of robot for anode auto-injection (아노드 자동투입 로봇 개발)

  • 김대하;신경철;이성호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1284-1287
    • /
    • 1996
  • 전기도금공장 ANODE 투입 및 추출 자동화 사업은 ANODE 자동투입 Robot이 개발되어 적용되기전까지는 국내에서 적용된 사례가 전혀 없었고 선진제철소에서 일부 적용된 사례가 있는 것으로만 알고 추진되었던 사업이다. 이번에 개발하여 현장에 적용한 ANODE 자동투입 robot은 가반중량이 300kg이나 되는 이동형 특수 robot으로 국산화개발품이지만 성능의 신뢰성이 입증되지 않는 상태에서 추진되었기 때문에 위험 부담성이 컸으며 완전자동화가 되기까지 많은 시행착오를 겪었다. 시행착오의 주요원인으로는 현장여건 즉 설비의 간섭, FUME에 의한 robot의 고장 또한 robot 자체의 설계 miss등 무수히 많았다. 이번 ANODE 자동투입 robot 개발 및 현장 적용으로 향후 확대 적용시 시행착오에 의한 문제점을 최소화 할수 있는 대책을 수립할수 있는 좋은 기회가 주여져 96.12.E 준공을 목표로 2차분 ANODE투입 자동화 사업이 진행중에 있으며 1차분과 시스템을 통합하여 보다 완벽한 자동화시스템을 구축할 예정이며 97년도에는 포항제철소로 확대 적용할 예정이다.

  • PDF

A Study on the Waterproof Method to the Leakage Type of Underground Structure by Cement Grouting (지하구조물의 누수유형에 따른 시멘트그라우팅 방수기법에 관한 연구)

  • 천병식;최춘식
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.5
    • /
    • pp.181-196
    • /
    • 2001
  • 지하구조물에 있어서 누수사고의 빈번한 발생 및 상습화 경향에도 불구하고 현재 국내에서 사용되고 있는 누수보수방법은 누수유형에 관계없이 일괄적으로 동일한 처리방식으로 보수하는 상황으로서 지하구조물 누수에 대하여 누수 유형별로 보수방법을 달리하는 적극적인 해결방안의 모색이 필요하다. 따라서, 본 연구에서는 지하구조물의 누수보수에 있어서 방수 그라우트재의 공학적 특성을 파악하고 현장상황에 적합한 방수그라우팅 기법을 수립하여 누수유형별로 적용한 사례를 중심으로 적용성을 고찰하였다. 방수그라우팅 적용사례를 분석한 결과 지하구조물의 누수방지를 위하여 누수상황 및 누수유형에 따라 주입재의 배합비를 적절히 변화시켜 주입재와 현장상황에 적합한 방수그라우팅 기법을 병행 적용하는 것이 확실한 방수효과를 얻을 수 있으며, 주입목표구간에 대해 단계적으로 수회로 나누어 순차적인 그라우팅과 가능한 한 저압, 소량, 장시간에 걸쳐 주입하는 것이 방수그라우팅 효과를 증대시킬 수 있는 것으로 판단된다. 또한, 현장 적용결과로부터 기존 방수이론의 영향요소에 추가하여 물시멘트비, 주입재의 입경, 주입시간 및 주입량, 혼화재 사용여부, 주입차수 등에 대한 다양한 영향요소의 검토가 필요한 것으로 판단된다.

  • PDF