Development of Progress Management System based on Quality Inspection Information - Case Study on Nuclear Power Plant Construction - (품질관리 정보를 기반으로 한 진척도 관리 시스템 개발 - 원자력발전소 건설공사 사례를 중심으로 -)

  • Kwahk, Kil-Jong;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.73-84
    • /
    • 2011
  • This study represents construction progress management model based on quality inspection process in addition to cost-schedule integration. Quality inspection process cycle, resource estimate as progress measurement parameter, hierarchical structure of schedule, and inspection lots linking quality inspection to resource estimate are addressed as four main information areas. The authors established several process models to give a structure and correlations among information elements on each of these areas. Applying the process models proposed, an information system was implemented and utilized for nuclear power plant construction. It reveals that the system achieves accurate and objective progress information in near real time with significantly reduced time and effort as well as administrative efficiencies from making quality inspection process online.

Development of a Deterministic Optimization Model for Design of an Integrated Utility and Hydrogen Supply Network (유틸리티 네트워크와 수소 공급망 통합 네트워크 설계를 위한 결정론적 최적화 모델 개발)

  • Hwangbo, Soonho;Han, Jeehoon;Lee, In-Beum
    • Korean Chemical Engineering Research
    • /
    • v.52 no.5
    • /
    • pp.603-612
    • /
    • 2014
  • Lots of networks are constructed in a large scale industrial complex. Each network meet their demands through production or transportation of materials which are needed to companies in a network. Network directly produces materials for satisfying demands in a company or purchase form outside due to demand uncertainty, financial factor, and so on. Especially utility network and hydrogen network are typical and major networks in a large scale industrial complex. Many studies have been done mainly with focusing on minimizing the total cost or optimizing the network structure. But, few research tries to make an integrated network model by connecting utility network and hydrogen network In this study, deterministic mixed integer linear programming model is developed for integrating utility network and hydrogen network. Steam Methane Reforming process is necessary for combining two networks. After producing hydrogen from Steam-Methane Reforming process whose raw material is steam vents from utility network, produced hydrogen go into hydrogen network and fulfill own needs. Proposed model can suggest optimized case in integrated network model, optimized blueprint, and calculate optimal total cost. The capability of the proposed model is tested by applying it to Yeosu industrial complex in Korea. Yeosu industrial complex has the one of the biggest petrochemical complex and various papers are based in data of Yeosu industrial complex. From a case study, the integrated network model suggests more optimal conclusions compared with previous results obtained by individually researching utility network and hydrogen network.

A Product Model Centered Integration Methodology for Design and Construction Information (프로덕트 모델 중심의 설계, 시공 정보 통합 방법론)

  • Lee Keun-Hyoung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.99-106
    • /
    • 2002
  • Researches on integration of design and construction information from earlier era focused on the conceptual data models. Development and prevalent use of commercial database management system led many researchers to design database schemas for enlightening of relationship between non-graphic data items. Although these researches became the foundation fur the proceeding researches. they did not utilize the graphic data providable from CAD system which is already widely used. 4D CAD concept suggests a way of integrating graphic data with schedule data. Although this integration provided a new possibility for integration, there exists a limitation in data dependency on a specific application. This research suggests a new approach on integration for design and construction information, 'Product Model Centered Integration Methodology'. This methodology achieves integration by preliminary research on existing methodology using 4D CAD concept. and by development and application of new integration methodology, 'Product Model Centered Integration Methodology'. 'Design Component' can be converted into digital format by object based CAD system. 'Unified Object-based Graphic Modeling' shows how to model graphic product model using CAD system. Possibility of reusing design information in latter stage depends on the ways of creating CAD model, so modeling guidelines and specifications are suggested. Then prototype system for integration management, and exchange are presented, using 'Product Frameworker', and 'Product Database' which also supports multiple-viewpoints. 'Product Data Model' is designed, and main data workflows are represented using 'Activity Diagram', one of UML diagrams. These can be used for writing programming codes and developing prototype in order to automatically create activity items in actual schedule management system. Through validation processes, 'Product Model Centered Integration Methodology' is suggested as the new approach for integration of design and construction information.

  • PDF

A Study for Verification of the Performance Index Model of EVMS in Credible Interval (신뢰구간상에서 EVMS 성과지수모델의 검정에 관한 연구)

  • Kang Byung-Wook;Lee Young-Dai;Park Hyuk;Chun Yong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.478-481
    • /
    • 2002
  • In these days, Cost and Scheduling was managed effectively because of introduction of EVMS to construction project. However the EVMS is appropriate methods to advanced country, so it is difficult to apply into domestic construction project. in this paper weighted value n, m was used of compositive index(CI) to forecast Estimate At Completion (EAC) using statistical analysis in credible interval the objective of this paper is to verify compositive index(CI) and to forecast Estimate At Completion (EAC).

  • PDF

A Case Study on The Establishment of Efficient Management of Academic Information and Services. (학술정보의 효율적 전주기 관리 및 서비스 체제 구축에 관한 사례 연구)

  • Cho, Sung-Nam;Seo, Tae-Sul;Kim, Wan-Jong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.10a
    • /
    • pp.412-415
    • /
    • 2016
  • 본 연구에서는 학술정보의 효율적 관리 및 서비스 체제를 수립하고 활용성을 강화하기 위해 논문 자동 수집 및 구축, 논문 투고 및 심사, 전자출판, XML 자동 구축에 이르기까지 전주기 기능 구현에 방안을 제시하고 이를 구현한 사례를 소개하고자 한다. 기존 Peer-Review 시스템은 데이터 수집 및 변환파트와 투고 및 심사, 전자출판 파트, XML 구축 파트 등으로 분리되거나 별도로 운영되어 왔다. 본 연구에서는 이러한 기능을 통합적으로 구현하기 위해 KISTI의 Peer-Review 시스템인 ACOMS와 XML 기반 학술정보서비스 시스템(KpubS) 기능 및 프로세스를 통합한 구현 방안을 제시하고 이를 시스템으로 구현하였다. 그러나 아직까지 원문 PDF를 XML로 완전 자동 변환할 수 있는 기술은 없는 상태로써 반자동 변환 기능을 탑재하였다. 본 연구 내용은 다양한 수집 채널을 통해 입수된 학술정보 및 XML 자료에 대한 입력체계를 제공하고, XML 본문으로부터 메타데이터를 자동 식별 및 추출하여 학술정보 DB를 구축 저장하며, 구축된 DB 및 XML 기반의 전자출판 기능 제공과 함께 웹서비스 단계까지의 전주기 공정에 대한 프로세스 모델 및 시스템에 관한 것이다. 이에 데이터베이스 구축을 위한 시간 및 비용을 절감할 수 있을뿐만 아니라, 시맨틱 태깅 및 수식, 표, 그림 정보 제공 등 이용자에게 다양한 형태의 서비스를 제공할 수 있게 되었다.

A Study on the Development of integrated Process Safety Management System based on Artificial Intelligence (AI) (인공지능(AI) 기반 통합 공정안전관리 시스템 개발에 관한 연구)

  • KyungHyun Lee;RackJune Baek;WooSu Kim;HeeJeong Choi
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.403-409
    • /
    • 2024
  • In this paper, the guidelines for the design of an Artificial Intelligence(AI) based Integrated Process Safety Management(PSM) system to enhance workplace safety using data from process safety reports submitted by hazardous and risky facility operators in accordance with the Occupational Safety and Health Act is proposed. The system composed of the proposed guidelines is to be implemented separately by individual facility operators and specialized process safety management agencies for single or multiple workplaces. It is structured with key components and stages, including data collection and preprocessing, expansion and segmentation, labeling, and the construction of training datasets. It enables the collection of process operation data and change approval data from various processes, allowing potential fault prediction and maintenance planning through the analysis of all data generated in workplace operations, thereby supporting decision-making during process operation. Moreover, it offers utility and effectiveness in time and cost savings, detection and prediction of various risk factors, including human errors, and continuous model improvement through the use of accurate and reliable training data and specialized datasets. Through this approach, it becomes possible to enhance workplace safety and prevent accidents.

Development of System Model for Integrated Information Management of Construction Material (건설자재 통합정보 관리를 위한 시스템 모델 구현)

  • Han, Choong-Han;Ju, Ki-Bum
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.433-440
    • /
    • 2009
  • As information technology of constructional area develops recently, web-based on-line system is rapidly increasing to provide information on diverse constructional materials so as to enhance productivity of constructional business and to reduce cost. Since the constructional materials information provided by these systems, i.e., quality, specification, etc are not standardized, however, the staffs on the constructional site suffer considerable difficulties in using materials information when acquiring information on specific materials, e.g., using diverse information systems or repeating similar jobs. Thus, this research typified information items of constructional materials on the basis of GDAS and designed multi system model to control integrated information on constructional materials. This system can efficiently control and utilize materials information by supporting automatic classification of constructional materials to which OmniClass Part-22 and UNSPSC are applied, conditional complex retrieval of materials information, real-time automatic embodiment of electronic catalog and retrieving/controlling RFID.

Software Package for Pipe Hydraulics Calculation for Single and Two Phase Flow (배관 유동의 주요 변수계산을 위한 소프트웨어 시스템의 개발)

  • Chang, Jaehun;Lee, Gunhee;Jung, Minyoung;Baek, Heumkyung;Lee, Changha;Oh, Min
    • Korean Chemical Engineering Research
    • /
    • v.57 no.5
    • /
    • pp.628-636
    • /
    • 2019
  • In various industrial processes, piping serves as a link between unit processes and is an essential installation for internal flow. Therefore, the optimum design of the piping system is very important in terms of safety and cost, which requires the estimation of the pressure drop, flow rate, pipe size, etc. in the piping system. In this study, we developed a software that determines pressure drop, flow rate, and pipe size when any two of these design variables are known. We categorized the flows into single phase, homogeneous two phase, and separated two phase flows, and applied suitable calculation models accordingly. We also constructed a system library for the calculation of the pipe material, relative roughness, fluid property, and friction coefficients to minimize user input. We further created a costing library according to the piping material for the calculation of the investment cost of the pipe per unit length. We implemented all these functions in an integrated environment using a graphical user interface for user convenience, and C # programming language. Finally, we verified the accuracy of the software using literature data and examples from an industrial process with obtained deviations of 1% and 8.8% for the single phase and two-phase models.

Quantitative Comparison and Analysis of Decommissioning Scenarios Using the Analytic Hierarchy Process Method and Digital Mock-up System (계층화 분석과정법과 디지털 목업을 이용한 정량적 해체 시나리오 평가)

  • Kim, Sung-Kyun;Park, Hee-Sung;Jung, Chong-Hun;Lee, Kune-Woo
    • Journal of Energy Engineering
    • /
    • v.16 no.3
    • /
    • pp.93-102
    • /
    • 2007
  • This paper presents a scenario evaluation model of the AHP (Analytic Hierarchy Process) to evaluate dismantling scenarios considering quantitative and qualitative considerations. And decommissioning information producing modules which can obtain a dismantling schedule, quantify radioactive waste, visualize a radioactive inventory, estimate a decommissioning cost, and estimate a worker's exposure was developed to assess qualitatively decommissioning information. The digital mock-up (DMU) system was developed to verify dismantling processes and find error of scenarios in virtual space. It combines and manages the decommissioning information producing modules, the decommissioning DB, and the dismantling evaluation module synthetically. By using AHP model and DMU system, the thermal column in KRR-1 was evaluated on plasma arc cutting scenario and nibbler cutting scenario using the developed decommissioning DMU system.

Agent Model Construction Methods for Simulatable CPS Configuration (시뮬레이션 가능한 CPS 구성을 위한 에이전트 모델 구성 방법)

  • Jinmyeong Lee;Hong-Sun Park;Chan-Woo Kim;Bong Gu Kang
    • Journal of the Korea Society for Simulation
    • /
    • v.33 no.2
    • /
    • pp.1-11
    • /
    • 2024
  • A cyber-physical system is a technology that connects the physical systems of a manufacturing environment with a cyber space to enable simulation. One of the major challenges in this technology is the seamless communication between these two environments. In complex manufacturing processes, it is crucial to adapt to various protocols of manufacturing equipment and ensure the transmission and reception of a large volume of data without delays or errors. In this study, we propose a method for constructing agent models for real-time simulation-capable cyberphysical systems. To achieve this, we design data collection units as independent agent models and effectively integrate them with existing simulation tools to develop the overall system architecture. To validate the proposed structure and ensure reliability, we conducted empirical testing by integrating various equipment from a real-world smart microfactory system to assess the data collection capabilities. The experiments involved testing data delay and data gaps related to data collection cycles. As a result, the proposed approach demonstrates flexibility by enabling the application of various internal data collection methods and accommodating different data formats and communication protocols for various equipment with relatively low communication delays. Consequently, it is expected that this approach will promote innovation in the manufacturing industry, enhance production line efficiency, and contribute to cost savings in maintenance.