• Title/Summary/Keyword: 부분순위

Search Result 316, Processing Time 0.028 seconds

Core Concepts of Home Economics: Management and Planning of Life-cycle (가정과교육과정에서의 핵심개념: 관리 및 생애설계)

  • Nam, Su-Jung
    • Journal of Korean Home Economics Education Association
    • /
    • v.28 no.2
    • /
    • pp.51-59
    • /
    • 2016
  • In this study, we identified the theoretical basis of management and planning of life-cycle, the core concept of resource "Administration and Independence," of Home Economics curriculum according to "Notification of Education Ministry #2015-74." First in relation to "management", we identified the systematic theory, the theoretical basis of traditional home management, and diagnosed how this systematic theory is reflected on 2015' curriculum. As a result, the contents of actual curriculum's middle school contents does not include integrally the life related problems that middle students are facing in real life, and it is hard to be convinced what priority the element of selected contents have of several problems. Next, in case of planning of life-cycle that accentuates the importance of life plan corresponding to career orientation it mentions the contents including very comprehensive area such as value, profession, health as well as developmental task, but the fact leaves to be desired that 2015 curriculum is overlooking the importance of financial planning, the international trend.

Optimization of Municipal Pavement Management System(PMS) Components (Development of a Prototype PMS for Ansan City) (시도로 포장관리체계(PMS) 구성요소 최적화 연구 (안산시 Prototype PMS 개발사례))

  • Park, Sang-Kyu;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.4 s.6
    • /
    • pp.111-122
    • /
    • 2000
  • PMS(Pavement Management System) has been developed and/or operated for the freeway and national highway systems in Korea. There is, however, no municipal PMS that is necessary in many cities for efficient management of their roadways. In this study, a municipal Prototype PMS is developed. The Prototype PMS is designed to be operated on PC base. It uses GIS interface for user friendliness that applies color graphics, text and distress pictures to display pavement conditions and rehabilitation information for both current and historical situations. The computer program of the prototype PMS consists of four major functions(inquiry, analysis, data management, and print). Especially, prioritization and M&R(Maintenance and Rehabilitation) alternative selection procedure is designed to be flexible so that the users can modify the decision criteria whenever it is necessary. Database items of the Prototype PMS is carefully selected for the objectives and size of municipal PMS. Reference point method is basically used for the location referencing in the Database. The unit section consists of each loom segment of the road for effective management.

  • PDF

Fast Motion Estimation Algorithm via Optimal Candidate for Each Step (단계별 최적후보를 통한 고속 움직임 예측 알고리즘)

  • Kim, Jong-Nam;Moon, Kwang-Seok
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.18 no.2
    • /
    • pp.62-67
    • /
    • 2017
  • In this paper, we propose a fast motion estimation algorithm which is important in performance of video encoding. Even though so many fast algorithms for motion estimation have been published due to tremendous computational amount of full search algorithm, efforts for reducing computations of motion estimation still remain. In the paper, we propose an algorithm that reduces unnecessary computations only, while keeping prediction quality the same as that of the full search. The proposed algorithm does not calculate block matching error for each candidate directly to find motion vectors but divides the calculation procedure into several steps and calculates partial sum of block errors for candidates with high priority. By doing that, we can find the minimum error point early and get the enhancement of calculation speed by reducing unnecessary computations. The proposed algorithm uses smaller computations than conventional fast search algorithms with the same prediction quality as the full search algorithm.

  • PDF

Two-level Scheduling for Soft Real-Time Systems (소프트 실시간 시스템을 위한 두 단계 스케쥴링 알고리즘)

  • Kim, Jae-Hun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.2
    • /
    • pp.467-475
    • /
    • 1999
  • This paper presents an algorithm for scheduling jobs in soft real-time systems. To simplify the scheduling for soft real-time systems, we introduce two-level deadline scheme. Each job in the system has two deadlines, which we call first-level and second-level deadlines, respectively. The first-level deadline is the same as the deadline in traditional real-time systems. The second-level deadline is later than the first-level deadline, and defines the latest point in time when the result is still acceptable. Partial-credit is given for jobs meeting the second-level deadline but missing the first-level deadline, whereas jobs meeting the latter are given full credit. We heuristically compute priorities of jobs in a dynamic way by combining the first-level adn second-level deadlines with the partial-credit. Simulation results indicate that our two-level scheduling algorithm is a viable approach for dealing with both soft real-time systems and temporary overloaded hard real-time systems.

  • PDF

A TOPSIS-based Approach to Evaluating the University's Department Homepages for Operational Management Purposes (TOPSIS 기반 대학 학과 홈페이지 운영관리 평가방안)

  • Jeong, Gi-Ho
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.9
    • /
    • pp.126-132
    • /
    • 2019
  • This study presents a TOPSIS-based application for the evaluation of administrative purposes on the website of university's departments. As the school age population decreases, the homepage of the university's departments also has important promotional means. However, most of them are not well managed until a full renewal. This is because the investment is difficult compared to strategic importance. Therefore, this paper tries to show its usefulness by applying a partially modified TOPSIS for management purposes, in consideration of the practicality. TOPSIS is appropriate for target management as a conceptual reason to prioritize based on the distance from the ideal target for each criterion. Also, in the case of monotonic functions of the evaluation criteria used, the same results can be obtained by reducing the amount of calculations through a partially modified procedure as presented in this study.

An Analysis on Indicators of Water Taxi User Service in Seoul Using Importance Performance Analysis (IPA) (중요도-만족도 분석을 활용한 서울시 수상택시 이용자 서비스지표 분석)

  • Kim, Tae Ho;Ha, Jong Moon;Lim, Jong Moon;Park, Je Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.587-595
    • /
    • 2009
  • Since October 11th, 2007, water taxi service in Han River has been operated for commuting and sightseeing. However, it is less popularized than expected because of economical problem and accessibility. Therefore, this paper develops service estimation items for water taxi based upon literature review on public transportation. It also conducts survey questionnaire and IPA (Importance Performance Analysis) Analysis to analyze service characteristics of water taxi users and provide several implications. The results are follows: First, economical problem should be solved out as showed in the 'main improvement' item. Second, accessibility, informativeness and convenience in the 'required improvement' item, and security and punctuality in the 'keep up the good work' item are presented. Third, kindness and soundness are showed in the 'the maintenance of current situation' item. All in all, if municipal considers economical problem, accessibility, informativeness, and convenience as it improves water tax service, it will make it possible to attract more water taxi users.

The Influence of Trust in Physical Education Teachers and Immersion Experience in Physical Education Classes on Attitude and Satisfaction During Physical Education Classes (중학생의 체육교사에 대한 신뢰와 체육수업 몰입 경험이 체육교과 태도 및 수업만족에 미치는 영향)

  • Park, Yu-Chan
    • Journal of Korea Entertainment Industry Association
    • /
    • v.13 no.6
    • /
    • pp.187-202
    • /
    • 2019
  • The main goal of this study is to investigate influence of trust in physical education (PE) teachers and immersion experience in PE classes on attitude and satisfaction during PE classes. Total 863 middle school students in Gwang-ju metropolitan area were recruited by utilizing a convenience sampling method. All data were analyzed by using SPSS statistic program ver. 25.0 (frequency analysis, exploratory factor analysis, reliability analysis, correlation analysis, multiple regression analysis). Alpha was set at 0.05. The results of this study is summarized as in the following. First, all sub-factors of trust in the PE teachers partially positively or negatively influence sub-factors of attitude during PE classes. Second, sub-factors of satisfaction during PE classes were partially positively affected to trust in the PE teachers. Third, Attitude during PE Classes were found to have partial positive influence on immersion experience in PE classes. Fourth, sub-factors of immersion experience in PE classes have partial positive effect on the sub-factors of satisfaction during PE classes. Thus, in order to the positive attitude and greater satisfaction during PE classes, it is important to establish the trust of PE teachers through maintaining interaction with students, constructing better systemic class, and creating the class conditions based on considering students' ability. In addition, in order to enhance immersion experiences of students during PE classes, it is necessary to set up learning goals and tasks based on ability of students, to study various teaching method, and to make only focusing on the performance based PE classes without grading.

Design of CAN Communication Interface possible for Error Detection that use for Embedded System (오류검출이 가능한 임베디드 시스템용 CAN통신 인터페이스 설계)

  • Ahn, Jong-Young;Kim, Sung-Su;Kim, Young-Ja;Park, Sang-Jung;Hur, Kang-In
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.10 no.1
    • /
    • pp.69-74
    • /
    • 2010
  • Now the CAN(controller Area Network) is using electronic modules as a serial communication which is very robust to noise. Especially the CAN is using for automotive part that very popular in which automotive electronic control module, engine controller unit, sensor modules, etc. but the CAN has the order of priority to linking node and also has fault confinement so using in these features that is applied to in factory automation product line. The CAN communication is basically very robust to electric noise so varied applying to others part. In this paper, we suggest to CAN interface for embedded system that is possible for error detection using two CAN nodes on Hi-speed, full-CAN.

A Study of Anti-collision algorithm based on RFID for Medical Service (의료 서비스를 위한 RFID 기반 충돌방지 알고리즘에 관한 연구)

  • Park, Joo-Hee;Park, Yong-Min
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.11a
    • /
    • pp.434-437
    • /
    • 2006
  • Today, Hospital Information System that integrates ubiquitous technologies are introduced in limited basis due to problems like standardization and limits on medical use, where responsibilities lie, legal safeguard on transmission, invasion of privacy etc. Particularly, problems like absence of tag design suitable for medical environment, compatibility issue with previous medical information system. In order to solve such problems, we have designed medical tags for the first time that are consistent with future ubiquitous environment by deciding on medically suitable field with 96bit tag offered by EFC as its base. Second, improving on previous multi-tag recognizing crash prevention algorithm, we have designed a priority anti-collision algorithm that reflects priorities on the needs in medical environment.

  • PDF

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.