A Study on Improving Performance Bond System for Efficient Execution of Public Construction Works (효율적인 공사수행을 위한 공사이행보증제도 개선방안 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2020
  • This study analyzed problems of operating performance bond for public works and derived some suggestions for improvement. The Contract Law for Government Owner requires to submit performance bond which guarantees performing the construction contractor pays back compensation money when the obligation is not executed. Currently, first bid eligibility for participation is exactly required for executing company of performance bond obligation, not considering volume, technical level, and special type of remaining works. In collaboration contract, if guarantee accident occurs, it is obliged for remaining collaboration contractors to be qualified to fulfill the whole contract. This study proposes following improvement plan to solve problems of current performance bone in public works. Firstly, qualification criteria must be deregulated exceptionally for selecting proper contractor, which executing performance bond obligation, considering progress and characteristics of remaining works. Secondly, In collaboration contract, the prerequisite of remaining contractors' should be deregulated as 'implementation requirement of the remaining works'from'implementation requirement of the whole work'. Finally, defect responsibility should be included in liabilities of performance bond by specifying that owner or guarantee agency bear them.

법령과고시 2 - 건설산업기본법 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.278
    • /
    • pp.44-49
    • /
    • 2013
  • 민간건설공사 대금 지급보증제 도입과 불공정 특약 규정 무효 등을 주요 내용으로 하는 개정된 건설산업기본법이 지난 8월 6일 개정되어 내년 2월 7일부터 시행된다. 개정된 법률에서 계약금액 및 기간 변경 불인정, 계약체결 전 예측이 어렵거나 구체적으로 정하지 않는 내용의 책임 전가 등 건설공사 도급계약 내용 중 계약당사자 간 현저하게 불공정하고 불평등한 특약은 효력을 잃는다. 또한 민간건설공사에서 수급인은 계약이행보증에 대응하여 발주자에게 공사대금지급보증 또는 담보제공 요구를 할 수 있게 되며, 계약당사자가 대등한 입장에서 공정하게 계약을 체결하도록 표준계약서 사용이 권장된다.

  • PDF

Profit analysis of life insurance products with interest rate options (이자율 보증옵션이 내재된 생명보험의 이차익 분석)

  • Lee, Hangsuck
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.4
    • /
    • pp.737-753
    • /
    • 2013
  • Interest rate options embedded in life insurance products provide policyholders with minimum guaranteed rates credited to the corresponding surrender values. This paper discusses current low-interest environment and several types of interest rate options embedded in life insurance products. In addition, this paper shows profit structures of the life insurance products and calculates values of the interest rate options under stochastic interest model and the corresponding VaR (value at risk). Finally, some implications are discussed.

A Study on the Interpretation Trend of Current Cases for Warranty in U.S.A (미국의 Warranty 제도와 관련된 판례동향 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.101-109
    • /
    • 2010
  • Under the Civil Code and related law in Korea, the liability for defects after delivery belongs to the Contractor. However, various disputes have occurred in relation to the remedy of such defects and the compensation for damages, which are the main liability of a contractor in the event of defects. Despite court decisions regarding defect liability, many problems prevail in the real world. For this reason, this working-level research considers the introduction of a performance warranty contract system. To establish the system successfully, it is necessary to analyze the trend of various warranty cases in the US. Therefore, the warranty system of the US was first examined, and the effect of acceptance, notification and burden of proof, remedies under warranty clauses, and default termination were investigated and analyzed in this study.

제조물의 신뢰성 및 안전성 관련 보험체계에 관한 연구

  • 홍연웅;김종걸;이낙영;권영일;전영록;나명환
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.271-272
    • /
    • 2001
  • 제조물의 안정성과 신뢰성에 대한 사후대책인 제조물배상책임보험, 제조물회수비용보험, 제품하자보증책임보험, 신뢰성보험에 대하여 그 의의와 부보범위 등을 알아본다. 또한 신뢰성보험의 도입과 더불어 제조물배상책임보험을 활성화함으로서 부품 및 소재의 안전성과 신뢰성을 제고할 수 있음을 검토한다.

  • PDF

대한설비건설협회,기계설비공사 하자담보 책임기간,일반건설업체에 안내

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.183
    • /
    • pp.31-33
    • /
    • 2005
  • 기계설비공사의 하자담보책임기간은 <건설산업기본법시행령 제30조 관련 별표 4>, <국가를 당사자로 하는 계약에 관한 법 시행규칙 제70조 관련 별표 1> 및 <주택법시행령 제59조 제1항 관련 별표 6>에 의하여 2년 이내로 규정되어 있다. 그러나, 일부 발주기관 및 건설업체에서 기계설비공사의 하자담보책임기간을 법으로 정한 기간을 초과 설정하여 하자보수 비용 및 하자보증수수료 증가 등의 민원이 발생되고 있어, 건설교통부 및 재정경제부는 하자담보책임기간을 법으로 정한 기간을 준수하여 줄 것을 발주기관에 협조 요청한 바 있다. 이와 관련 대한설비건설협회에서는 기계설비공사 하자담보책임기간을 법으로 정한 기간을 정하여 줄 것을, 시공능력 300위 이내의 일반건설업체 대표이사와 하도급계약담당 부서장에게 요청하였다. 또한 계약 체결한 기계설비공사의 하자담보책임기간이 법으로 정한 기간을 상회하는 경우에는 회계통첩에 의하여 계약서상의 기간을 조정하여 하도급계약시에는 법으로 정한 하자담보책임기간을 설정하여 줄 것을 요청하였다.

  • PDF

이슈 & 이슈 - 원도급업체의 부도 및 파산 시 공사대금을 받을 수 있는 방법 - 유치권과 하도급대금지급보증

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.266
    • /
    • pp.32-36
    • /
    • 2012
  • 대한설비건설협회는 그동안 설비건설업계가 공사대금을 제대로 받을 수 있도록 하도급대금지급보증제도 개선에 많은 노력을 기울여 왔다. 특히 국토해양부 장관과의 간담회를 비롯하여 건설산업 공생발전위원회를 통해 제도개선을 건의한 결과 하도급대금 지급보증 책임범위 확대 및 보증금 청구 시 청구일로부터 15일 이내에 지급토록 하는 등 건설공제조합의 약관을 개정하는 성과를 거두었다. 이로써 설비건설업계는 하도급대금 보증금을 원활히 받을 수 있게 됐다. 그러나 대한설비건설협회의 이러한 노력에도 불구하고 글로벌 금융위기 이후 100대 종합건설사 중에서 30여개 사가 부도 및 워크아웃, 법정관리 등으로 건설환경은 더욱 열악해지고 있다. 이에 따라 원도급업체가 부도날 경우 공사대금을 받을 수 있는 방법인 유치권과 하도급대금지급보증에 대해 설비건설업계의 관심이 커지고 있다. 본지는 유치권과 하도급대금지급보증에 대해 살펴본다.

  • PDF

프로젝트 품질 관리

  • 박순규
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.330
    • /
    • pp.63-72
    • /
    • 2004
  • 프로젝트 품질관리에는 진행 중인 프로젝트가 제반 요구사항을 충족시킬 수 있도록 하기 위하여 품질방침, 목표 및 책임사항을 결정하는 제반 관리 기능의 모든 활동을 포함하며, 품질기획, 품질보증, 품질통제 및 품질개선 등의 방법을 통하여 각 활동을 품질시스템에 적용시키는 것으로 아래 그림은 프로젝트 품질관리의 주요 프로세스에 대한 개요를 보여준다.

  • PDF

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF