• Title/Summary/Keyword: 발주방식

Search Result 234, Processing Time 0.026 seconds

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.

Innovating Software Acquisition and Pricing: Improved Process and Technique (정보화 사업 가격책정 방식 혁신에 대한 고찰)

  • Yu, David Jae-Hoon;Hwang, In-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.485-492
    • /
    • 2007
  • 정보화 사업에서 발생할 수 있는 위험(Risk)은 다양하다. 정보화 사업 관련 위험 요인 중 가장 대표적이고 보편적인 것은 발주 및 제안단계에서 발주자가 가진 요구사항의 불명확을 꼽을 수 있는데, 이로 인해 정보화 사업 수행 도중 요구범위 증가와 변경, 그리고 사업원가 구조의 악성화가 발생하게 됨은 자명하다. 그러나 안타까운 현실은 그 동안 우리나라 정보화 사업의 관행이 요구사항 불명확이라는 잠재적 위험 아래에서도 발주자와 사업자 간의 계약이 보호장치가 미흡한 확정가(firm fixed price) 방식으로 수립되어 왔다는 것이다. 확정가로 계약이 수립될 경우 사업자는 발주자의 요구사항 불명확으로 인해 파생된 원가 위험까지 불합리하게 책임져야 하는 고리에 묶이게 된다. 이러한 문제를 본질적으로 해결하는 한가지 방법은 발주자와 사업자간의 정보화 사업 획득 절차를 혁신하는 것인데, 본 논문은 이를 위해 가칭, 한국형 정보화 산업 활성화 획득 절차(KIPAP: Korea If Proliferation Acquisition Process)의 기본 개념을 고안하여 소개한다. 이 획득 절차는 정보화 사업이 내재하고 있는 요구사항의 불확실성을 계량화, 가시화하여, 그 정도에 따라 차등화된 계약방식의 선정방법 을 제시한다.

  • PDF

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

Definition of an Integrated Contract Package for Application of Multi-Trade Subcontract System (다공종 통합발주방식 적용을 위한 통합공종 규명에 관한 연구)

  • Song Hyung-Suk;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.385-388
    • /
    • 2002
  • The construction industry has complicated production processes with diverse disciplines and subcontractors, which is the major cause of lowered productivity. To solve this problem, multi-trade subcontract system is recently suggested. Some general construction companies have applied this method to some sections of work process. However, this is in the early stage of application. The purpose of this study is to define an integrated contract package for improving both contractor and subcontractor efficiency. First, this study recognizes construction company to need of multi-trade subcontract system. Finally, it suggests feasible activities which can be useful for a construction company to apply to this subcontract system.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

JIT생산방식의 점진적 도입을 위한 롯트 크기 결정

  • 정남기;유철수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.324-330
    • /
    • 1992
  • 이 논문은, 끌어당기기 생산 체제에서 적정 롯트 크기를 결정하는 문제를 다룬다. 이것은, 요소 품목별 발주량을 각각 별도로 정하는 것이 아니라, 모든 요소 품목의 발주량을 최종 완성품의 생산계획에 따라 자동적으로 정해지게 하는 것이다. 이 문제는 소 롯트 생산을 즉시 실행하기가 어려운 제조환경에서, JIT생산방식을 점진적으로 적용하고자 할 때 발생한다. 그 기법의 하나로, 다수준 총비용 최소법을 제시한다. 이 방법은 기존의 총비용 최소법을 응용하는 것이지만, JIT생산방식의 기본 취지를 살리기 위해, 최종 완성품의 발주기간에 요소품목의 재고량이 반영되도록 수정된 것이다. 이 방법의 효과를 시뮬레이션에 의하여 분석한다.

  • PDF

Feasibility Analysis of Introducing CM at Risk Delivery Method to the Korean Public Construction Industry by Analyzing Attributes of the Projects (대상공사의 특성요인 적합도 분석에 의한 공공부문 'CM at Risk 방식' 도입의 타당성 분석)

  • Koh, Min-Hyeok;Kim, Yea-Sang;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.3-14
    • /
    • 2010
  • A high degree of management skills and functions is essential to the success of construction projects. While the various construction management delivery methods have been realized as the solutions, Korean government is planning to introduce 'CM at Risk Method' to the public construction projects. However, even if its effect has been verified successful in the international market, it must be considered before legally adapting the method that it would be suitable to our public sector, In this respect, the purpose of this study is to evaluate and analyze feasibility of 'CM at Risk Method'. In order to do that, 15 attributes of construction projects were found, which were suitable to 'CM at Risk Method' in general, 'CM at Risk-GMP Method', and 'CM at Risk-Cost Reimbursable Method' and suitability of each attribute to each of 9 categories of public construction facilities was evaluated by questionnaire survey to CM specialists. Results showed that 'CM at Risk Method' might not bring improper effect to the industry but due to the characteristic of public sector, the effect would be very limited.

A Decision Support Model for Optimal Delivery of Public Construction Projects (공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델)

  • Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.22-34
    • /
    • 2016
  • The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.