• Title/Summary/Keyword: 발주방식의 선정 요소

Search Result 12, Processing Time 0.025 seconds

Determining Decision-making Factors for the Selection of Contract Methods in Public Construction (공공공사의 발주방식선정을 위한 의사결정요인 연구)

  • Kim, Dae-Gil;Lee, Ung-Kyun;Lee, Hak-Ju
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.405-412
    • /
    • 2015
  • The procurement of public construction, which has been selected mainly on the basis of the work experience of a department of public agencies that award construction contracts or those in charge of ordering, has not been executed through an objective selection process considering the construction types or characteristics. Thus, as a preliminary study on developing a model for the selection of contract methods, this study intends to analyze and present the key factors affecting the selection of procurement methods in public construction. Through a literature review on the existing methods, foundational factors were first presented, based on the analysis of these factors, the final influence factors were proposed. As a result, 6 factors contractor's characteristics, the environment of the construction market, relevant organization, the characteristics of a project, costs, and responsibility factors were determined, and 14 sub-factors were selected. The factors presented in this study will be used as base data for developing a decision making support model for the selection of contract methods in public construction.

Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction (초고층건물 마감공사의 발주방식 선정요소에 대한 연구)

  • Lee Jae-Il;Ahn Byung-Ju;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.345-348
    • /
    • 2003
  • The overall ability to manage the construction projects from an integrated perspective is important due to the emerging of high-rise building constructions. Potential hazardous of low productivity exist in the finishing work of high rise building a distinct example of the projects. Especially, the number of activities that should be controlled during finishing work is more than during skeleton work. Thus field managers should attract more attention to manage finish work activities. The low productivity of these activities can diminish that of skeleton work. Decision factors of the delivery system for finishing works in the high-rise building project is established by means of literature review and questionnaire survey and a basis to analyze the effects of the criteria to the deli very system is presented.

  • PDF

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

An Importance Analysis on the Problem of Design Competition of Landscape Architecture (조경설계공모의 문제점 및 요소별 중요도 분석)

  • Lee, Joo-Hee;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.6
    • /
    • pp.62-71
    • /
    • 2013
  • This study is conducted for the purpose of analyzing and contemplating the problems with the competition in current landscape design, with the goal of improving the landscape design competition system by using the AHP technique. The result of this study, first describe the Landscape design competition system that formed the problems and show the most important problem followed by other problems shown in order of importance, which are 'design changes after winning', 'Guidelines for design competition' and 'Landscape design competition manner'. Secondly, in the low rank article make up the level one -From a total 12 elements from the low rank article corresponding in 'process of winner selection' the 'Unprofessional landscape participate the screening' collected comments for the biggest problem, 'lack of expertise in judgement', 'problems with the examination scoring system' and other articles, the corresponding in 'process of winner selection' appears at the highest ranks. It also happens that after making the choice in the landscape design competition, the importance of 'client's design change symptoms' appears high. As a result the overlooked details of the landscape design competition's problems were analyzed. This study has prioritized the problems by problems which landscape design competition institutions most frequently have. Based on this ranking, there is significance purpose to create proactive system improvements in the future. By analyzing these problems, we will be better able to develop improvements to the future system.

A Coordinative Committee Model between Architects and Contractors in Design-Build Projects (설계시공일괄공사에서 설계자와 시공자 간의 단계별 중간협의체 운영모델)

  • Kong Seung-Hwan;Kong Seung-Hwan;Eom Ik-Joon;Koo Kyo-jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.323-328
    • /
    • 2004
  • Domestic Design-Build, which has applied for client's convenience, has many problems Because It is being applied in the building law, which devides between architects and contractors. Among problem the relation between architects and contractors is a typical problem. It makes a quality decline and a design skill decline. In result, it causes insufficience of competitive power in overseas projects from now on. So we present the plans to improve mutual relations between architects and contractors. And we induce development of design skill and good quality of building by presenting a coordinative committee model between them in Design-Build projects.

  • PDF