Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.

Considerations in the early stage of Designing the Unit Modular Building (유닛모듈러 건축물의 설계 초기 단계에서의 고려 사항)

  • Lee, Young-Ho;Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.133-142
    • /
    • 2012
  • With the recent changes in building environments such as low-carbon green growth, there have been increasing demands for the new building system that is eco-friendly and can maximize efficiency such as the unit modular system. For the unit modular system, more than 80% of the whole process is carried out in the factory while in the field, mostly unit module assembling and finish work are done. Thus, the quality at the pre-construction stage when design and manufacturing are done determines the quality of the building as a whole. In the country, the unit modular method was first applied in 2003 to school buildings and has gradually expanded afterwards, but due to the lack of examples and related information as well as the small scale of modular manufacturers, its characteristics have not been sufficiently reflected in design, manufacturing and field constructions. This study, as an attempt to improve the design quality of unit modular buildings, points to the problem in manufacturing and field construction, compares and analyzes its causes, and suggests major points to be considered in the early stage of designing the unit modular buildings.

A Study on the Establishment of Housing Performance Criteria for Modular Building (모듈러 건축물의 거주환경 성능기준 설정에 관한 연구;음환경 성능을 중심으로)

  • Ko, Kwang-Il;Kim, Yong-In;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.628-631
    • /
    • 2006
  • Modular Construction is a method, which factory-produced units are transferred to on-site and assembled to form complete buildings. It is expected that its demand will increase gradually. Because it has some advantages such as duration reduction, movement, reuse and environmental friendliness etc. For the Modular Construction to be introduced and applied, we needs the objective and reasonable performance criteria. This study presents the acoustic performance criteria of the modular building. For this one, this paper reviews legal standard related to performance, analyzes the performance evaluation and survey on pilot projects. The presented performance criteria can be specifically asked the demand by owner in a design guideline. In addition, it makes designer and general contractor accomplish target performance. Eventually, it can improve the performance of Modular Building.

  • PDF

Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.

Fire Resistant Regulation Status and Activation Plan of Domestic Modular Construction (국내 모듈러 건축의 내화구조 제도 현황 및 활성화 방안)

  • Choi, Yun-Jeong;An, Jae-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.673-680
    • /
    • 2022
  • Modular construction is recognized as a construction method with various advantages, such as shortening the construction duration, achieving quality control through factory production, ease of maintenance, and reduced construction costs due to reduced weight of materials. However, despite efforts by the modular industry and government to activate modular construction, it has rarely been established in the domestic market. Currently, there are technical limitations to the modular construction fire resisting technology applied to general buildings. The lack of access to modular construction fire resistance regulation is considered a major factor. In this study, the current status and problems with modular construction fire resistance regulation, a significant hindrance factor, were considered to activate modular construction. This study is intended to present a direction for institutional improvement in modular construction fire resistance and a direction for research and development.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

Development of Modular Apartment Unit for Single Person Household Based on BIM (BIM 기반 1인 가구 모듈러 공동주택 유닛 개발)

  • Lee, Si-Hyeon;Yoo, Moo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.809-820
    • /
    • 2023
  • In contemporary society, there is a notable rise in single-person households, coupled with an increased demand for residential spaces, necessitating the exploration of suitable housing solutions. Modular architecture is gaining prominence as a method to deliver cost-effective and sustainable living spaces efficiently. This study introduces a method for optimizing the design and construction processes of modular building units through Building Information Modeling(BIM) technology. It involves an analysis of factors that enhance living quality and meet the housing needs of single-person households. Utilizing BIM, a resource-efficient and cost-efficient modular apartment unit has been developed. BIM facilitates the visualization and integration of architectural components, thereby reducing design errors and enhancing productivity. This research evaluates both the benefits and constraints of modular architecture. Modular constructions, when combined with BIM, emerge as a potent solution for housing challenges, enriching the quality and variety of residential options. Nevertheless, considerations such as technical prerequisites and financial implications are also discussed. The study showcases the potential and merits of utilizing BIM for designing apartment units tailored to single-person households, offering a viable approach to ameliorate their living conditions.

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

A Study on Outsourcing Application of M.E.P. System for Manufacturing Process Improvement of the Modular Construction Method (모듈러건축 공법의 공장제작과정 개선을 위한 M.E.P.시스템 외주제작 적용에 관한 연구)

  • Choi, Jun-Sok;Lee, Jae-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.277-283
    • /
    • 2018
  • This study is conducted to improve the manufacturing process of the modular construction method, which is a pre-fabricated construction method recognized for its advantage on the shortening of construction time. This study first identified the factors that result in shortening of pre-fabrication processes in the current module-processing factory. In addition, those identified factors were further considered for installing the M.E.P. system that is being outsourced on the main module in the production line. A manufacturing process of the construction modules, which considers installation of a M.E.P. system most suitable for shortening the time on the outsourcing of modular construction, is introduced throughout the research. Furthermore, this study suggests the factors in need of improvement during design phase of modular construction and improvement measures to consider the quality of unit modules by focusing on the module parts that are most exposed to defects.