• Title/Summary/Keyword: 메가프로젝트

Search Result 28, Processing Time 0.027 seconds

해외건설 - 중소기업 해외진출시 애로사항 및 실패사례

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.227
    • /
    • pp.59-66
    • /
    • 2009
  • 해외건설협회는 지난 4월 8일 대한상공회의소 중회의실에서 우리 기업의 해외공사(수주) 성공 및 실패사례 경험 교류를 통한 해외산업 업무능력 제고를 위해 해외공사(수주) 사례 설명회를 개최했다. 이날 설명회에서는 O이란, 사우스파스 가스처리 시설공사(4,5단계) O싱카포르, 진출 프로젝트 사례 O카자흐스탄, 메가 레지던스 프로젝트 O중고시업 해외진출시 애로 및 실패사례 등이 발표 되었다. 본지는 협회 회원사들이 해외진출시 겪을 수 있는 애로사항과 실패사례에 대한 도움을 주고자 '중소기업 해외 진출시 애로사항 및 실패사례'를 게재한다.

  • PDF

Development of Program Management Information Systems for Urban Renewal (도심 재생 종합 사업관리 시스템의 개념 및 개발)

  • Choi, Hye-Mi;Kim, Ju-Hyung;Lee, Sung-Bok
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2010
  • Due to the variety of processes that are mainly influenced by the modification of law and regulations, it is difficult to propose a formal procedure of urban renewal projects. In addition, conflicts among various participants and stake-holders have made urban renewal difficult to manage. Needs for new systems to support management of this type of projects have been raised. This system should enable users to manage program aspects as well as projects given that the urban renewal consists of several projects. According to analysis of current context, the requirements of the system are classified as follows: a method to create flexible systems to cope with various process; functions to provide data on cost and schedule; user-friendly visualized tools enhancing understand of non-experts or less-experienced participants. This paper summarizes the background, requirements, concept and model of the system. Currently, prototype systems have been developed. Regarding outputs presented so far, potential benefits of the system are presented as well.

A Study of iPMIS(Intelligent Program Management Information System) Information Inference an Searching System Based on Ontologies (온톨로지 기반 정보 검색 시스템을 이용한 iPMIS (지능형 종합사업관리시스템) 정보 추론에 관한 연구)

  • Ahn, Hyoung-Jun;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.175-179
    • /
    • 2009
  • Researches of current PMIS(Project Management Information System) information searching focus on providing personalized results as well as matching needed queries in an enormous amount of information. This paper aim at discovering hidden knowledge to provide personalized and inferred search results based on the ontology with categorized concepts and relations among construction data. The current PMIS searching occasionally presents too much redundant information or offers no matching results from large volumes of data. In this paper, we propose a service searching system, which becomes aware of users device using iPMIS(Intelligent Program Management Information System). And we design and plant the ontology-based iPMIS, which is aware of the context in its environment.

  • PDF

A Sheme of the Database and System Framework for Construction IETM(Interactive Electronic Technical Manual) (건설분야 전자매뉴얼의 프레임워크 및 데이터베이스 구축 방안)

  • Kang, Sung-Hun;Park, Moon-Seo;Lee, Hyun-Su;Ji, Se-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.340-343
    • /
    • 2008
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. Hence to reach the goal, program management is needed rather than project management. program management can be seen as a 'total project management' and for an efficient program management prompt support for decision making is required. However, the current supporting method can't fulfill the requirements, therefore, need a tool to support the decision making and a IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information in specifications and laws. In this research, as part of developing a IETM, we aim to propose a system frame which is based on the analysis of processes of a project. Moreover, based on this frame, a database will be built to contribute towards the application of construction IETM in the domestic construction industry.

  • PDF

Development of Gateway Review System for Supporting Collaborative Decision-Making through Project Life Cycle (사업 단계별 의사결정 지원 게이트웨이 리뷰 체계 구축)

  • Shin, Seung-Woo;Yi, June-Seong;Lee, Jee-Hee;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.43-54
    • /
    • 2010
  • As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.

스마트 코리아를 위한 IT R&D 추진전략

  • Kim, Heung-Nam
    • Information and Communications Magazine
    • /
    • v.29 no.1
    • /
    • pp.30-37
    • /
    • 2011
  • 아이폰으로 촉발된 스마트 혁명이 우리의 생활상과 글로벌 시장의 경쟁구도, IT의 역할을 진화시키고 있다. 스마트 혁명으로 언제 어디서나 인터넷을 통해 정보와 콘텐츠 소비가 가능해지며, 소비자들은 일상생활 속에서 문명의 이기를 마음껏 누리고 있다. 시장의 경쟁 구도는 플랫폼과 SW 콘텐츠에 대한 혁신적 성향을 가진 사업자들이 자사의 핵심역량을 기반으로 스마트 생태계를 구축하고 있다. 이에 전통적인 IT 사업자들은 시장에서 쇠퇴하는 위기도 맡고있다. 우리나라는 스마트 혁명에 뒤늦게 합류하였지만, 스마트 혁명을 주도하기 위해 다양한 기술적 정책적 노력을 진행 중이다. 그 동안의 기기 경쟁력을 기반으로 스마트폰, 3D TV 등의 첨단부문에서 글로벌 경쟁력 확보에 성공하였다. 그럼에도 지식 기반의 혁신기업들이 IT시장을 선도하며, 국내 IT는 다시금 힘겨운 노력을 해야 하는 상황이다. 우리는 SW와 콘텐츠, 플랫폼 등에서는 상대적으로 역량 확보에 미진한 점을 인정하고 산학연이 연계하여 다양한 대응 체계를 구축하고있다. 본고에서는 스마트 코리아 실현을 위한 IT R&D 추진 전략에 대해 논의하였다. 지식기반 기업들의 시장내 확산에 대응하여, 우리나라 IT현황을 재검토하고 미래 스마트 시장에 대한 대응 전략을 제시하는 것이다. 미래 IT의 역할은 단순히 기기 서비스 기반의 스마트 라이프 실현을 넘어, 유관산업의 신시장 개척, 글로벌 이슈 해결까지 확장될 것으로 기대되고 있다. IT를 기반으로 스마트코리아 실현을 위해서는 전방위적 전략이 필요한 시점이다. 스마트 IT기술의 특성과 산업내의 IT 진화 및 역할 변화를 고려할 때 창의형 원천연구, IT융합기술, 메가프로젝트 추진, 모바일 이후 시대의 학제적 연구를 장기적인 관점의 IT R&D 전략으로 제안하고자한다.

A Study on the Mapping of Risk Factor with Performance Index in Urban Regeneration Project (도시재생사업 성과지표와 위험요인 연계 방안 연구)

  • Yu, Young-Jeong;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.497-500
    • /
    • 2008
  • Recently, the urban regeneration project has been performed actively at home and abroad. The stake-holders in urban regeneration project are various and complicated, and has large scale during a long life period. Also they show the characteristics of a mega-project and most mixed-use form. Therefore, the urban regeneration has a lot of potential risk factors from project beginning to completion. It means they need efficient and continuous risk management in terms of performance measurement. But the current domestic construction project does not reflect risk management in view of performance measurement. This study proposes the risk management methodology by mapping risk factors with major performance indexes of the urban regeneration project.

  • PDF

Development of Program Management Information System Prototype to Support Urban Regeneration Based on System Requirement Analysis (시스템 요구사항 분석을 통한 도시재생사업 수행을 지원하는 종합사업관리 시스템 프로토타입 개발)

  • Yeom, Ji-Woong;Kim, Doo-Whan;Ahn, Byung-Ju;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.85-92
    • /
    • 2009
  • Urban regeneration projects have been actively proceeding all over Korea. Urban regeneration has become a critical issue in the domestic construction industry, with environmental-friendly construction and high-rise buildings being emphasized. Because these projectstend to become complex, urban regeneration projects require interest and approach on a level of program management that includes traditional project management. This paper develops aprototype for a new program management information system of a supports the promotion of urban regeneration projects through the deduction of the requirements about system. The prototype of the program management information system includes functions that supply diverse information, support the process and legislation of an urban regeneration project, manage stakeholders, support decision-making, estimate and manage program risks, and manage the program level.