Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

Risk Factors in the Information System Development Project (정보시스템 개발 프로젝트 리스크요인에 관한 연구)

  • Son, Dong-Ki;Jung, Chul-Yong
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.05a
    • /
    • pp.355-362
    • /
    • 2003
  • 정보시스템 개발 프로젝트는 그 속성상 고객, 팀원, 환경등의 요인으로 유일성을 가지고 있어 개발 과정을 체계적으로 관리하기가 매우 힘들고 프로젝트의 대형화, 전문화, 복잡화, 장기화에 따라 더 많은 리스크(risk)요인과 불확실(uncertainty)요인이 존재한다. 따라서 본 연구는 정보시스템 개발 프로젝트의 실패에 영향을 미치는 리스크요인을 도출하고, 리스크요인들의 중요도(위험도)를 측정하기 위한 AHP(Analytical Hierarchy Process) 모델을 제시함으로써 프로젝트 수행 시에 발생할 수 있는 리스크를 관리하고, 실질적인 의사결정도구를 제공하고자 한다.

  • PDF

Risk Factor Classification and Weight Estimation for Urban Regeneration Project (도시재생사업의 리스크요인 분류 및 중요도 산정)

  • Cho, Jae-Kyung;Hyun, Chang-Taek;Yoon, You-Sang;Jin, Run-Zhi;Cha, Yong-Woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.89-99
    • /
    • 2012
  • Urban regeneration projects tingeing the shape of mixed-use development, due to the nature of the business, involve risk factors such as protracted business conflict among participations, subjects, complex approval and permission procedure, frequent policy changes, etc. Therefore, systematic risk management is needed to effectively manage the numerous risk factors that may occur during the process course of project. However, risk management of large and complex development projects such as urban regeneration projects is in the introduction stage yet and somewhat one time risk management plan has been established. Therefore, in this study, in order to systematic risk management of urban regeneration projects inhered numerous risk factors, risk factors for urban regeneration projects through preceding studies and case studies were presented. Also risk factors are classified in accordance with business propulsion phase, by estimating the importance for these, step by step emphasis on managed subjects of risk management was proposed.

Risk management applicable to shield TBM tunnel: I. Risk factor analysis (쉴드 TBM 터널에 적용 가능한 리스크 관리: I. 리스크 요인 분석)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.667-681
    • /
    • 2012
  • In general, risk management consists of a series of processes or steps including risk identification, risk analysis, risk evaluation, risk mitigation measures, and risk re-evaluation. In this paper, potential risk factors that occur in shield TBM tunnels were investigated based on many previous case studies and questionaries to tunnel experts. The risk factors were classified as geological, design or construction management features. Fault Tree was set up by dividing all feasible risks into four groups that associated with: cutter; machine confinement; mucking (driving) and segments. From the Fault Tree Analysis (FTA), 12 risk items were identified and the probability of failure of each chosen risk item was obtained.

Deriving of Major Risk Factors for Planning Phase of u-City Project (U-City사업 계획단계에서의 핵심 리스크 요인 도출)

  • Kim, Ho-Ki;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.139-148
    • /
    • 2011
  • u-City projects are different with the existing urban development projects progress via convergence with IT technology. Therefore, it inheres many risk factors more than the existing development projects as including more complexity and variety. The risk management system to systematically manage those risks which get identified and quantified is required. Especially, the planning phase that is appeared the various forms has a large effect on the success of the business. However, the management of risk factors remains in the passive form. So the problems on u-City project in the planning phase and risk factors of existing development business were analyzed for the continuous growth and the successful performance of u-City project, and those risk factors was identified and quantified by using statistical technique. In the results of it, the core risk factors were obtained through which way and the basis for the effective risk management in u-City business is provided.

A Study on the Risk Management of Projects to which the Real Estate Project Finance (부동산 PF사업의 리스크 관리에 관한 연구)

  • Kim, Sung-Chul;Lee, Jeong-Cheol;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.491-496
    • /
    • 2008
  • In spite of economic slump, the Real Estate PF(project financing) market competes for receiving large project orders. While the project is successful, the Real Estate PF still guarantees a high benefit ratio. But the initial stage of the project involves many risks. There are many financial, constructional, legal, and other risks. After searching for possible risks, we must consider a management plan. This study executed a question investigating risk factors and management plans. Those who have studied for 3 or more years have concluded that the question objects are developer, construction company, and financial institution staff. The main management plans take actions for proper benefit rate security and loan repayment. This study has also been verified through the actual case. The study results will help solve the Real Estate PF project's risks.

  • PDF

Effect of Supply Chain Risk Management Factors on Risk Management Strategy and Corporate Performance (공급사슬관리 리스크 요인이 위험관리전략과 기업성과에 미치는 영향)

  • Lee, Choong-Bae;Kim, Hyun-Chung
    • Journal of Korea Port Economic Association
    • /
    • v.36 no.3
    • /
    • pp.55-74
    • /
    • 2020
  • With globalization and the development of information and communication technology, the supply chain is becoming more widespread and complex, which increases the occurrence and damage caused by supply chain risks. Supply chain risk management has a great impact on corporate performance through the analysis of risk factors and proactive and strategic approaches. This study aims to analyze the effects of supply chain risk factors on risk management strategies and corporate performance empirically. In the research model for empirical analysis, supply chain risk factors were classified into supply, demand, operation, network, and external environment, while the risk management strategies were divided into active and passive strategies, as well as financial and operational performance for corporate performance. The data obtained via the questionnaire were analyzed for the path of the structural equation model. As a result of the analysis, companies are actively pursuing risk management for internal risk factors, rather than external factors, in terms of internal and external risk factors, and it was found that these strategies have a significant effect on corporate performance. Therefore, in the future, companies should conduct risk management strategies more proactively and preemptively through a thorough analysis of various risk factors affecting business operations.

A risk management system applicable to NATM tunnels: methodology development and application (NATM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Lee, Kang-Hyun;Kim, Byung-Kyu;Lee, In-Mo;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.155-170
    • /
    • 2020
  • In this paper, a risk management system applicable to NATM tunneling projects is proposed. After investigating case histories in NATM tunnel collapse, this paper analyzes the potential risk factors and their corresponding risk events during NATM tunnel construction. The risk factors are categorized into three groups: geological, design and construction risk factors. The risk events are also categorized into four types: excessive deformation, excessive deformation with subsidence, collapse inside tunnels, and collapse inside tunnels with subsidence. The paper identifies risk scenarios in consideration of the risk factors and proposes a risk analysis/evaluation method for the NATM tunnel risk scenarios. Based on the evaluation results, the optimal mitigation measure to handle the risk events is suggested. In order to effectively facilitate a series of risk management processes, it is necessary to develop a risk register and a management ledger for risk mitigation measures that are customized to NATM tunnels. Lastly, the risk management for an actual NATM tunnel construction site is performed to verify the validity of the proposed system.

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

A Study on Risk Classification System in Supply Chain (공급사슬망에서의 리스크 분류체계 연구)

  • Kim, Eun-Soo;Song, Byung-Jun;Lee, Jong-Yun
    • The KIPS Transactions:PartD
    • /
    • v.19D no.3
    • /
    • pp.257-262
    • /
    • 2012
  • The aim of this study is to present the importance of Risk Management and Risk Classification System in Supply Chain to cope with the rapidly changing distribution environment flexibly through the cooperation between a shipper and a distribution company. First of all, we considered existing studies related to the risks of Supply Chain Risk and analyzed 47 different risk factors by 18 kinds of risk causing factors. Second, we collected opinions of corporation specialist group based on the analyzed risk factors and then classified the risk factors into three categories and ten sub-categories. Third, we conducted a survey targeting shipping companies and distribution companies about classified risk and then verified the validity of Supply Chain Risk Classification using verification techniques such as Confirmatory Factor Analysis, Concentration Validity and Distinction Validity. Finally, we suggest some implications based on the verification results.