• Title/Summary/Keyword: 라이닝

Search Result 589, Processing Time 0.031 seconds

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

Study of The Combined High Flowing Self-Compacting Concrete's Cast in Place (병용계 고유동 자기충전 라이닝콘크리트의 현장 타설에 관한 연구)

  • Choi, Wook;Park, Hyun-Myo;Choi, Yun-Wang;Lee, Kwang-Myong;Kim, Gi-Beom;Yoon, Tae-Jung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.977-980
    • /
    • 2008
  • Recently, the study on the application of SCC(Self-Compacting Concrete) is actively underway, in order to solve the lack of flowability and the poor compacting which is one of the chronic problems of tunnel lining concrete. The aim of this study is that to verify the validity of the application of SCLC(Self-Compacting Lining Concrete) for tunnel lining concrete and to examine the characteristic of flowing and mechanics of SCLC in term of comparing before and after casting SCLC was developed by Packing Factor mix method and casted in field mix-design according to the condition of site and the characteristic of aggregate. Before casting, the tests of the capability of flowability and durability was performed by slump flow, air void and so on. Additionally, the slump flow loss is measured to evaluated the possibility of cast-in-place. Furthermore, considering on the first time SCLC casting applied to the tunnel lining in Korea, it is provided that the careful items and the correct way for construction when applied the SCLC on site.

  • PDF

A Study on the Behavior of Cut and Cover Tunnel according to the Excavation Plane by Numerical Analysis (굴착사면 변화에 따른 복개 터널구조물의 역학적 거동에 관한 수치해석적 연구)

  • Bae, Gyu-Jin;Lee, Seok-Won;Lee, Gyu-Phil;Park, Si-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.79-90
    • /
    • 2002
  • The structural analysis such as rigid frame analysis has been used for the design of cut and cover tunnel due to its simplicity and convenience. This analysis, however, could not account for the geometrical factors such as interface elements, slope of excavation plane, distance between lining and excavation plane, etc. To develop the analysis technique and design technology for the cut and cover tunnel, in this study, the numerical analyses considering not only geometrical but geotechnical factors are conducted. Especially, the effects on the mechanical behaviors of cut and cover tunnel due to the slope of excavation plane and the distance between lining and excavation plane are mainly focused in this study.

  • PDF

Study on the optimal construction of a concrete lining in a weathered rock (풍화암지반에 시공되는 콘크리트라이닝의 적정시공에 관한 연구)

  • Kim, Hyeongkeon;Lee, Chul;Lee, Sun-Woo;Park, Jun-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.33-47
    • /
    • 2015
  • Concrete lining in tunnel construction is used as secondary support for downward loads when primary support decays. The use of concrete lining varies greatly depending on the intentions of engineer and/or client. An engineer uses much smaller deformation modulus which determines the concrete lining thickness than of a pattern 3, when supporting patterns 4 and 5 are used in a weathered rock and soil. Considering these conditions, this study intends to suggest optimal construction procedures through a back analysis using a computer program(MIDAS-civil). Cases of Seoul Subway System line${\bigcirc}{\bigcirc}$ zone${\bigcirc}{\bigcirc}$ were selected to be examined for this study. The results show that it is possible to reduce the thickness of concrete lining. When results from this study were applied to Seoul Metropolitan subway construction projects, it is expected to bring economic benefits.

A study on the establishment of stress limit values of management monitoring in tunnel (터널 유지관리계측의 응력 관리기준치 설정에 관한 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.25-32
    • /
    • 2015
  • This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of concrete lining stress and reinforcement stress. The data is obtained from 7 sections of the Seoul metropolitan subway line No 6, 7, and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison shows that the safety phase is 60% of allowable stress, the attention phase is 80% of allowable stress and the precision analysis phase is 100% of allowable stress. Also, we presented a method of management monitoring by the absolute value which can be easily applied in practical affairs.

Review of fire resistance evaluation and fire resistance method of concrete segment lining for fire in tunnel (터널 내 화재발생에 대한 콘크리트 세그먼트 라이닝의 내화성 평가 및 내화방법에 대한 고찰)

  • Moorak Son;Juhyun Cheon;Youngkeun Cho;Bumjoo Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.121-139
    • /
    • 2023
  • Various tunnels such as road, subway, and railway are under construction and operation. Various types of linings are used for structural stability of tunnel structures, and concrete segment linings are mainly installed in TBM tunnel construction. In this paper, when a fire occurs in a tunnel, the impact on the concrete segment lining, which is the structure in the tunnel, and related standards, fire resistance evaluation and fire resistance method are investigated through literature review and related contents are presented. Through this, it is intended to provide an information for practitioners to secure the safety of concrete segment linings against tunnel fires.

Performance Evaluation of Organic and Inorganic Fiber Reinforced Concrete in Tunnel Lining Structure (유·무기 섬유 혼입 터널 라이닝 콘크리트 부재의 성능 평가)

  • Lee, Jong-Eun;Kim, Tae-Won;Kim, Su-Man;Jeon, Joong-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.110-118
    • /
    • 2009
  • The tunnel structure is widely used for transportation in the mountain area. To reduce the duration of construction and thus the expense, a tunnel excavation is often performed simultaneously with a tunnel lining in in-situ. However, cracking of the tunnel lining may occur arising from the vibrating impact in the excavation process. The present study concerns the role of steel fiber and nylon fibers in tunnel lining concrete to reduce the vibrating impact. As a result it was found that both the nylon fiber and steel fiber improved the durability and physical properties of concrete.

석탄층을 협재한 연암을 대상으로 한 도로터널 시공사례

  • 김주화;김선기;신경진
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2002.10a
    • /
    • pp.1-15
    • /
    • 2002
  • 동복터널의 현장지질은 편마암과 석탄층(Coal Beds)이 협재된 암질이 매우 불량한 편암으로 구성되어 있으며, 설계 시에는 석탄층의 발달이 확인되지 않아 그 영향을 충분히 고려되지 않았다. 석탄층(두께 2~8m)은 편암의 Rock Cleavage와 같은 방향과 45~55도의 경사를 가지며 pinch out and swelling 형태로 발달이 불규칙하다. 하행선굴착 중 약 290m구간에 걸쳐 석탄층이 나타났으며, 90m 구간은 천단 및 측벽부에서 집중 발달되어 쳐대일변위가 20mm이상인 지점이 발생하는 등 상반굴착 시 111.2mm의 수평방향 내공변위가, 하반굴착 시에는 최대 127.8mm의 내공변위가 발생하였고 하반관통이후 수렴되었다. 내공변위 과다발생에 대한 대책으로 지보타입을 하향 조정하였고 측벽부는 하향 록볼트를 포함한 추가록볼트 보강을 실시하였다. 한편 터널 바닥부의 석탄층은 도로포장 후 침하문제가 예상되어 인버트를 기존 강지보공과 H-beam으로 연결.폐합한 후 콘크리트로 치환(140m구간)하여 추가변위를 최소화하였으며 무근콘크리트로 설계된 라이닝은 철근콘크리트 라이닝으로 변경 시공하였다.

  • PDF

터널 콘크리트 라이닝 균열저감 방안 연구

  • Mun, Gyeong-Su;Kim, Min-Su;Park, Jun-Il
    • 한국도로학회지:도로
    • /
    • v.16 no.3
    • /
    • pp.54-63
    • /
    • 2014
  • 최근 터널에서 균열, 누수 등과 같은 현상이 많이 발생하고 있어 터널의 안정성 및 균열보수, 미관, 고객의 공용 중 심리적 불안감을 조성한다는 것을 쉽게 찾을 수 있다. 고속국도 제30호선 상주~안동간은 16개소/12km의 터널이 설계되어 있어 터널의 비중이 크다. 그러므로 본 연구에서는 터널 라이닝 균열발생 원인분석 및 기존사례 조사를 통하여 균열발생 최소화 방안을 검토 및 터널 라이닝의 유해한 균열방지를 위하여 공사관계자(발주처, 감리사, 시공사, 하도급사 등) 의견수렴을 통한 여러 가지 대책공법을 제안하였으며 제안공법의 효율성을 판단하기 위해 고속국도 제30호선 상주~안동간 제 8공구의 단촌 2터널, 단촌 3터널에 시험시공을 실시하여 각 공법별 균열율 및 시공성, 경제성을 고려하여 결과를 분석하고 최적의 공법을 파악, 전파하는데 그 목적이 있다.

  • PDF

Effect of Leakage on Deterioration of Concrete Lining Structure (콘크리트 라이닝 구조물의 누수에 의한 열화특성)

  • Jung, Ho-Seop;Kim, Dong-Cyou;Kim, Seong-Soo;Park, Kwang-Pil
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.287-288
    • /
    • 2009
  • In this study, the degree of deterioration on the tunnel lining concrete due to crack and leakage was evaluated by field-investigating the conventional tunnels constructed a long time ago. By examining the exterior, conducting the non-destructive test and collecting cores for the tunnel concrete linings, this study evaluated the compressive strength and the permeability, and also performed instrumental analyses.

  • PDF