• Title/Summary/Keyword: 도시계획단계

Search Result 330, Processing Time 0.186 seconds

Analyzing the Current Situation and Issues of Urban Renewal Projects in Korea: Focused on Housing Redevelopment Projects and Housing Reconstruction Projects (전국 도시재정비사업 추진실태 분석을 통한 개선방안 고찰: 주택재개발사업 및 주택재건축사업을 중심으로)

  • Lim, Jung-Min;Lee, Young-Hwan;Kim, Jae-Sung;Kim, Sung-Youn
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.333-348
    • /
    • 2013
  • The detailed current situation of urban renewal projects which have implemented in all over the country is sorted by regional and divisional groups, researching press reports. Problems in the progress of promoting urban renewal projects made the paper are analyzed in this research. This research examined the actual condition about urban renewal projects synthetically and then, deduced the following improvement plan. First, formulating long-term renewal plan is needed. Secondly, It should be changed into the gradual urban renewal project on a small scale according to various conditions of each local area. Finally, support of the central government in consideration of local conditions should be carried out.

Evaluation of Structural Stability of Tunnel due to Adjacent Excavation on Urban Transit (도시철도 인접굴착공사에 따른 터널구조물의 구조 안정성 평가)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.503-508
    • /
    • 2020
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, As a result of analyzing the track deformation level of the existing tunnel due to the excavation work adjacent to the urban transit, it was found that the evaluation criteria (allowed values) of conventional railways lines were satisfied. Based on the numerical analysis, it was analyzed that the results of the prediction of the tunnel structural stability of due to the excavation work and the level of the tunnel deformation occurring at the actual site could be approximated as closely as possible.

The Deployment of Dutch Collective Housing Types and Case Study of Contemporary Perimeter Block Housing (네덜란드 집합주택유형의 전개와 현대 블록형 집합주택 사례 연구)

  • Lim, Jae Heon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.525-534
    • /
    • 2022
  • The supply of housing can be understood through a close relationship with the urbanization phenomenon. Through industrialization and urbanization, many cities have implemented systems and policies for housing supply due to population concentration in cities, poor housing quality, and lack of housing. In the case of the Netherlands, the Housing Act was enacted in 1901 to improve the residential environment during the period when the population was concentrated in the city, and various efforts were made to expand the housing supply. Through this process, we understand the background of collective housing types in the Netherlands and analyze the application stages of contemporary residential housing planning in Rotterdam and Amsterdam. On the other hand, through the experience of Western society, we examine how to view the problem of multi-family housing types in our society, where the proportion of apartments is continuously increasing.

A Study on the Construction Methods and the Distribution of Proper Spatial Function for Restoring Urban Streams into Close-to-Nature Streams - A Case Study of Hongjecheon(Stream) in Seodaemun-Gu, Seoul - (도시 내 자연형 하천 조성을 위한 적정 공간기능 배분과 조성방안 연구 - 서울시 서대문구 홍제천을 사례로 -)

  • Jung, Tae-Jun;Lee, Kyong-Jae;Han, Bong-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.3
    • /
    • pp.43-55
    • /
    • 2013
  • The purpose of this study is to propose a plan that properly organizes urban close-to-nature streams by evaluating the city park functions, ecological functions and landscape functions required for urban stream and setting up space function suitable for the space. The site of this study is Hongjecheon located in Seodaemun gu of Seoul City, whose length of channel spans 6.12km in total. The plan for the construction of close-to-nature streams had been established from late 2003, and the construction was completed. Evaluation Categories and indications were deduced from 4 stages. First, based on theoretical examination, we made a list of stream and park evaluation categories and added Category about Characteristic of urban streams. Next, we set Final Evaluation Categories and indications through the process of goal-relevance, indication verification, merging similar category. Final Evaluation Categories were deduced such as usage demand, usability(city park functions), biodiversity, inhabitation potential, rarity(ecological functions), historical cultural elements, and landscape Quality(landscape functions). As a result of allotting space functions, zones 1 through 4, got high grades at usage demand, was classified as a civic resort district; zones 5 through 6, close to major green area and remained original landscape, as ecological conservation and restoration district; zones 7 through 8, get high grades at usage demand and usability, as environmentally-friendly use district; and zones 9 through 10, many historical cultural elements and view points, and high green possession rate, as stream scenic district. In addition, detail space function and construction plan for each zones were proposed. As a result of this study, proposed space function assignment considering natural characteristics, humanities and social characteristics and landscape characteristics and is expected to be utilized at reasonable spatial planning considering various functions required for urban stream.

Preliminary study of Guideline for the Construction of U-Eco City (U-Eco City 구축 가이드라인 작성을 위한 기초연구)

  • Kang, Young-Ok
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.2
    • /
    • pp.170-176
    • /
    • 2009
  • The goal of U-Eco City testbed is im proving the technical com pletion of ubiquitous technology /services which have been developed in other core projects in U-Eco City, by implementing newly developed ubiquitous technology/services to testbed. When the newly developed ubiquitous technology/services are implemented in the testbed, we will monitor whether the developed ubiquitous technology/services can be applied in the real situation and if they have problems we will find out the solution to solve the problems. In addition to this we have goal to sale experience of construction of U-Eco city testbed to the local governments and foreign cities. To accomplish this goal, it is necessary to make the guideline for the construction of U-Eco City. Final goal of this research is develop guideline for the construction of U-Eco City. I developed the framework of U-Eco City construction guideline by i) analyzing problems when the local governments try to construct U-City, ii) finding out general idea of Eco City and investigate connection between Eco City and U-City, iii) analyzing main steps of constructing U-City, and iv) matching the all the issues and considerations into process of u-Eco city construction steps.

  • PDF

Characteristics and Meaning of Yongsan Family Park - Based on the Public Records of Seoul - (용산가족공원 조성 과정의 특성과 의미 - 서울시 기록을 중심으로 -)

  • Choi, Hyeyoung;Lee, Sang Min;Gil, Jihye;Kim, Jung-Hwa;Park, Hee-Soung;Seo, Young-Ai
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.1-12
    • /
    • 2023
  • The ongoing Yongsan Park development project began in 1988 with the development of a utilization plan for the US Army base in Yongsan after the Army relocation. This study aimed to draw implications for the Yongsan Park project by focusing on Yongsan Family Park. Among the public records of Yongsan Park and Yongsan Family Park transferred to the Seoul Metropolitan Archives, 53 major records were analyzed. The results are as follows. First, Yongsan Family Park, built on the site of the US Army golf course in 1992, was considered a part of the Yongsan Park plan and holds status as the first phase of the Yongsan Park project. Second, despite its status, Yongsan Family Park opened as a temporary park occupied by urban facilities. A design and detailed roadmap of the development process is necessary to make Yongsan Park more resilient. Third, organizing and systematizing public records is necessary because lessons learned through past park development processes can be applied to the current project. This study is meaningful since it uncovered important issues of urban planning discussed in the process of Yongsan Family Park development through a complete analysis of public records, examined the linkage between Yongsan Family Park, which was not known until now, and the ongoing Yongsan Park project, and reaffirmed the importance of park archiving for long-term development projects.

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

Improving on Planting in Small Scale Development - The Case of Seoul - (소규모 대지의 조경 개선방안에 관한 연구 - 서울시를 사례로 -)

  • Cho, Yong-Hyeon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.5
    • /
    • pp.31-41
    • /
    • 2009
  • Under the Korea Building Act, anyone planning to build a building or buildings on a site over $200m^2$ must plant plants over a specific area. In large scale development this rule is adhered to well, but such is not the case in small scale development. Therefore, special attention must be given to small scale development. Thus, the purpose of this research is to analyze the current situation and practice of planting at small scale development sites in Seoul, and then suggest policies for improving them. In this study using the data covering Seongbuk-Gu and Gangnam-Gu, which was surveyed in 2002, the current situation and practice of planting at small scale development sites was analyzed. After a questionnaire survey was conducted with government officers and building owners, the same analysis was made. Then the policies for improvement were extracted. The results are as follows: 1. In superordinate planning stage, because the minimum standards are too low, those must be strengthened. Any district plan does not control planting in private building lots. This requests active application of planting in private building lots as a design control measure in district planning. 2. In the building design stage, there are no guidelines. The obligation of building set-back between adjacent buildings by the Korean Building Act produces mass shaded and inferior planting beds. The act also is blocking landscape architects' participation in small scale development. And wall installations deteriorate the streetscape and growth of plants with shading. Therefore guidelines must be made. 3. In each stage of the building permit, the permit for building completion, and maintenance the Korean Building Act is blocking landscape architects' participation in small scale development, so the planting plan is completely handled by nonprofessional persons. Therefore, the act should be amended in order to make way for landscape architects' participation in each stage of the small scale development process.

The Study on the Improvement of Principle in Determining Road Boundary Used by Geographical Features (지형지물을 이용한 도로경계 설정 원칙의 개선 방안)

  • Jeon, Yeong-Gil
    • Journal of Cadastre & Land InformatiX
    • /
    • v.46 no.2
    • /
    • pp.93-105
    • /
    • 2016
  • Among 28 land Categories, 'road' is that most frequently established or transformed. Like that of other 27 land categories, the boundary of road should be defined by boundary making principles and then fixed by cadastral laws. But, some criteria to determine the land boundary, especially in boundary making rule which can be used by geographical features, is confused partly in Land Use Planning stages. Because the purpose of making any rules in fixing road boundary may be misinterpreted, the gap between law and real land boundary can be occurred. Those related rules in determining the land boundary must be improved urgently. Cut surface' or 'slope' should be conformed as a legal term and I suggest that 'Structures' must be changed to 'geographical features'.

Environmentally Sound Land Use Planing in Cheju Island, Korea (제주도 중산간 지역의 환경보전적 토지 이용 계획)

  • 양하백
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 1997.11a
    • /
    • pp.145-159
    • /
    • 1997
  • Cheju Island is the most attractive resort area in Korea for its exotic landscape, natural beauty, and traditional culture which is quite different from that of the mainland. Until now, most of the recreational facilities and accomodations have been constructed along the coastal areas. Recently, mid-mountain area has been under very heavy development pressure because it is suitable for new sites for tourism facilities and the land price in the coastal area is very high. The mid-mountain area is the land located 200-600m above the sea level. It is a major source of water supply for the island and has exotic scenic beauty, which cannot be found in mainland but it is the area very vulnerable to water pollution Therefore, it is very important to manage this area based on the concept of environmentally sound and sustainable development in order to meet ever increasing demand for the land development The purposes of this project are: 1) to establish Geographic Information System for the whole island, 2)to formulate environmentally sound landuse plat However, There has been accuracy of the original map, defining criteria of analysis, updating of the data were identified for future tasks to be studied.

  • PDF