Browse > Article
http://dx.doi.org/10.12652/Ksce.2011.31.6D.771

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 -  

Choi, Yang Won (영산대학교 교통공학과)
Publication Information
KSCE Journal of Civil and Environmental Engineering Research / v.31, no.6D, 2011 , pp. 771-778 More about this Journal
Abstract
Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.
Keywords
metro railroad network; economical efficiency analysis; benefit/cost (B/C); net present value (NPV); internal rate of return (IRR);
Citations & Related Records
연도 인용수 순위
  • Reference
1 건설교통부(2006) 대중교통기본계획.
2 건설교통부(2007) 교통시설 투자평가지침.
3 경상남도(2003) 마창진 광역도시철도 사전예비타당성 조사.
4 경상남도(2009) 경상남도 도시철도 기본계획.
5 대한건설협회(2008) 건설통계연보.
6 부산광역시(2010) 부산광역시 도시철도 기본계획 재정비.
7 양산시(2006) 양산시 도시교통정비기본계획.
8 양산시(2008) 2020년 양산도시기본계획.
9 양산시(2008) 양산시 지방대중교통기본계획.
10 양산시(2009) 부산지하철 1호선 양산선(노포-북정)연장 예비타당성 기초조사.
11 한국교통연구원(2008) 2007년 국가교통DB구축사업.
12 한국건설기술평가원(2005) BRT 편람.
13 C, Chi-Gook, S. Young Eun, and J. Hun-Young (2001) Formulation of strategies for boosting the usage of Busan metro system, Journal of the Eastern Asia Society for Transportation Studies, Vol. 4, No. 6.
14 Liu R., Pendyala Rm., Polzin S. (1997) Assessment of Intermodel Transfer Penalties Using Stated Preference Data, Transportation Research Record 1607.