다중 공정 계획 환경하의 실시간 계획 반영 시스템에 관한 연구 (A Study on Real-Time Planning System in Multi Progress Planning Environment)

  • 이대형;김용섭;김정훈
    • 대한조선학회논문집
    • /
    • 제45권5호
    • /
    • pp.547-553
    • /
    • 2008
  • Multi Progress Planning System problem in a multi-stage manufacturing system have a complexity and peculiarity different from other kinds of production system. World leading company has invested much cost and effort into a Real-Time Planning System and intelligent manufacturing field to obtain their own competitiveness. Especially Real-Time Planning System for ship production process as a part of intelligence for a shipyard. Real-Time Planning System, simulation based system, or virtual manufacturing system is an approach to achieve a such goal. It is expected that the Real-Time Planning System will contribute to the improvement of the productivity in working process at a shipyard. Also, This Real-Time Planning System will optimize the entire shipbuilding process in a multi progress planning environment for the delivery.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

강화학습을 이용한 이종 장비 토목 공정 계획 (Earthwork Planning via Reinforcement Learning with Heterogeneous Construction Equipment)

  • 지민기;박준건;김도형;정요한;박진규;문일철
    • 한국시뮬레이션학회논문지
    • /
    • 제27권1호
    • /
    • pp.1-13
    • /
    • 2018
  • 토목 공정 계획은 건설 공정 관리에서 중요한 과제 중 하나이다. 수학적 방법론에 기반을 둔 최적화 기법, 휴리스틱에 기반을 둔 최적화 기법 그리고 행위자 기반의 시뮬레이션 등의 방법론이 건설 공정 관리를 위해 적용되어왔다. 본 연구에서는 가상의 토목 공정 환경을 개발하고, 가상의 토목 공정 환경에서 강화학습을 이용한 시뮬레이션을 통해 토목 공정의 최적 경로를 찾는 방법을 제안하였다. 강화학습에 있어 본 연구에서는 상호작용 하며 서로 다른 행동을 하는 굴삭기와 트럭 에이전트들 에 대해 순차적 학습과 독립적 학습에 기반을 둔 두 가지의 Markov decision process (MDP)를 사용하였다. 가상의 토목 공정 환경에서 두 가지 방법 모두 최적에 가까운 토목 공정 계획을 만들어 낼 수 있음을 시뮬레이션 결과에 따라 알 수 있었으며, 이 계획은 건설 자동화의 기초가 될 수 있을 것이다.

다중 공정계획을 가지는 정적/동적 유연 개별공정에 대한 의사결정 나무 기반 스케줄링 (Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans)

  • 유재민;도형호;권용주;신정훈;김형원;남성호;이동호
    • 한국정밀공학회지
    • /
    • 제32권1호
    • /
    • pp.25-37
    • /
    • 2015
  • This paper suggests a decision tree based approach for flexible job shop scheduling with multiple process plans. The problem is to determine the operation/machine pairs and the sequence of the jobs assigned to each machine. Two decision tree based scheduling mechanisms are developed for static and dynamic flexible job shops. In the static case, all jobs are given in advance and the decision tree is used to select a priority dispatching rule to process all the jobs. Also, in the dynamic case, the jobs arrive over time and the decision tree, updated regularly, is used to select a priority rule in real-time according to a rescheduling strategy. The two decision tree based mechanisms were applied to a flexible job shop case with reconfigurable manufacturing cells and a conventional job shop, and the results are reported for various system performance measures.

조립부품 다중 제작라인의 일정계획 및 운영 시스템 개발 (Development of Scheduling and Operation system for multi-manufacturing line of the assembly parts)

  • 이상협;민상규;이병열;하재태;이원태;조정호
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2005년도 춘계공동학술대회 발표논문
    • /
    • pp.425-428
    • /
    • 2005
  • 본 연구는 건설장비 차량 조립부품을 제작하는 가공공장의 계획 및 운영 시스템 개발에 대한 내용이다. 연구의 대상은 건설장비 차량인 굴삭기, 휠로더, 지게차의 조립부품을 제작하는 공장으로 제작품별 제작라인이 구성되어 있다. 그리고 각 제작라인에는 여러 개의 공정이 있으며, 일부 공정은 작업자에 의해 작업이 이루어지고, 용접 및 가공 등은 자동화된 장비 및 설비에 의해 작업이 된다. 가공공장에서 관리 및 운영의 주요 관점은 이후 공정인 조립공장의 조립 착수일에 늦지 않게 제작된 부품을 공급하는 것이다. 그리고 공장 자체적으로 제작라인 내의 재공재고 감소, 작업일간 작업부하평준화, 자동화 장비 및 설비의 효율 극대화 등이 공장의 주요 관리 사항이다. 따라서 본 연구에서는 가공공장에서 제작되는 조립부품의 납기일 준수, 재고 감소, 부하 평준화, 장비효율의 극대화를 위해 공장을 체계적으로 관리하기 위한 계획 및 운영 시스템을 개발하였다. 개발시스템에는 제작라인별 제작 착수 및 자재발주${\cdot}$입고 관리, 공정별 실적관리, 실시간 작업 진행 관리, 용접 불량 관리 기능 등이 있다. 시스템은 MSSQL 서버, 오라클과 Visual Basic, Visual C# ASP로 개발되었다.

  • PDF

중견건설업체의 다중현장관리를 위한 자재소요계획모델 (Material Planning Model for Multi-Project Management in Medium-sized Construction Companies)

  • 정성림;한주연;김경래;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.598-601
    • /
    • 2003
  • 건축공사의 규모가 대형화, 복잡화, 다양화 되면서 여러 현장에서 공사수행에 따른 많은 정보가 발생하여 본사로 보고 되고 있다. 이러한 정보들 중에서 매개 현장 및 다중 현장을 동시에 관리하기 위해서는 필요정보만을 추출하여 경영진이 의사결정을 할 수 있는 지원체계의 필요성이 증가하고 있다. 하지만 중견건설업체의 경우 대기업과 비교할 때 본사 조직의 미비 및 관리업무 시스템이 취약하여 다중현장 관리가 어려운 실정이다. 특히 이러한 현장관리에 있어서 자원관리는 프로젝트 관리자의 중요한 관리대상이다. 그러나 자원계획을 일정정보와의 연계가 없이 주로 담당자의 경험과 판단에 근거하여 수립하기 때문에 일정이 변경될 때마다 계획을 수작업으로 수정해야하는 실정이며, 이로 인한 불필요한 공기지연이나 재고비용이 발생하고 있다. 본 연구에서는 중견건설업체가 다수 현장을 동시에 관리할 수 있도록 현장의 작업일보와 공정관리 소프트웨어의 연계를 통한 자재소요계획모델을 제시한다.

  • PDF

중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델 (Material Planning Model for Multi-Project Management in Medium-sized Construction Companies)

  • 정성림;한주연;김경래;신동우
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.106-114
    • /
    • 2004
  • 건축공사의 규모가 대형화, 복잡화, 다양화 되면서 개별 현장에서 공사수행에 따른 많은 정보가 발생하여 본사로 보고 되고있다. 이러한 정보들 중에서 개별 현장 및 다중 현장을 동시에 관리하기 위해서는 필요정보만을 추출하여 경영진이 의사결정을 할 수 있는 지원체계의 필요성이 증가하고 있다. 하지만 중견건설업체의 경우 대형건설업체와 비교할 때 본사 조직의 미비 및 관리업무 시스템이 취약하여 다중현장관리가 어려운 실정이다. 특히 이러한 현장관리에 있어서 자원관리의 대부분을 차지하는 자재관리는 프로젝트 관리자의 중요한 관리대상이다. 그러나 자재조달계획을 일정정보와의 연계가 없이 주로 담당자의 경험과 판단에 근거하여 수립하기 때문에 일정이 변경될 때마다 계획을 수작업으로 수정해야하는 실정이며, 이로 인한 불필요한 공기지연이나 재고비용이 발생하고 있다. 본 연구에서는 중견건설업체가 다수 현장을 동시에 관리할 수 있도록 현장의 작업 일보와 공정관리 소프트웨어의 연계를 가정한 자재조달계획 지원모델을 제시한다.