Browse > Article
http://dx.doi.org/10.3744/SNAK.2008.45.5.547

A Study on Real-Time Planning System in Multi Progress Planning Environment  

Lee, Dae-Hyung (Hong-Ik University)
Kim, Young-Sup (Hong-Ik University)
Kim, Jung-Hoon (People 3ec Co.)
Publication Information
Journal of the Society of Naval Architects of Korea / v.45, no.5, 2008 , pp. 547-553 More about this Journal
Abstract
Multi Progress Planning System problem in a multi-stage manufacturing system have a complexity and peculiarity different from other kinds of production system. World leading company has invested much cost and effort into a Real-Time Planning System and intelligent manufacturing field to obtain their own competitiveness. Especially Real-Time Planning System for ship production process as a part of intelligence for a shipyard. Real-Time Planning System, simulation based system, or virtual manufacturing system is an approach to achieve a such goal. It is expected that the Real-Time Planning System will contribute to the improvement of the productivity in working process at a shipyard. Also, This Real-Time Planning System will optimize the entire shipbuilding process in a multi progress planning environment for the delivery.
Keywords
Multi progress planning; Real-time planning system; Simulation based planning system;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Kim, H.T., 2002, A Simulation Based Shipbuilding System for Evaluation of Validity in Design and Manufacturing, Thesis for the Degree of Doctor of Philosophy, Department of Industrial System and Information Engineering Graduate School, Korea University. Journal of the Society of Naval Architects of Korea, Vol. 32 No. 1, pp. 9-16
2 Lee, J.W. and Kim, H.J., 1995, "Erection Process & Scheduling Using Genetic Algorithm," Journal of the Society of Naval Architects of Korea, Vol. 32, No. 1, pp. 9-16   과학기술학회마을
3 Min, S.G., Lee, S.H., Kim, J.O., Ha, S.J. and Choi, T.H., 2005, "A Case Study for Development of the Block Arrangement on Fixed Area and Scheduling System," Special Issue of the Society of Naval Architects of Korea, pp. 159-164
4 Shin, J.G. and Sohn, S.J., 2001, "An Evolutionary Simulation Based Design Methodology for a Multiple Jop-Shops Control System of Automated Manufacturing," International Journal of Computer Integrated Manufacturing, Vol. 14, No. 4, pp. 385-398   DOI   ScienceOn
5 Woo, J.H., Oh, D.K., Kwon, Y.D. Shin, J.G. and Sur, J.N., 2005, “Simulation Modeling Methodology and Simulation Framework for a Construction of a Digital Shipyard," Journal of the Society of Naval Architects of Korea, Vol. 42, No. 4, pp. 411-420   과학기술학회마을   DOI   ScienceOn