• Title/Summary/Keyword: 노선선정

Search Result 222, Processing Time 0.025 seconds

A Study on Airlines' Choice Behavior of Aircraft Size (항공사의 항공기 용량 선정 행위에 관한 연구)

  • Kim, Bong-Gyun;Yoo, Kwang-Eui
    • Journal of Advanced Navigation Technology
    • /
    • v.4 no.2
    • /
    • pp.114-131
    • /
    • 2000
  • An airline should consider the number of seats or size of aircraft, when it composes fleet or selects a type of aircraft for some routes. There are two major factors considered for this choice problem under the assumption that the objectives of an airline is a profit maximization: the operating cost and revenue from the aircraft operated. This research tries to solve the problem of aircraft size selection by airline. The study applies four steps to get optimal choice of aircraft size: (1) cost analysis for the relationship between airline operation cost and aircraft size: (2) market share and revenue analysis: (3) flight segment-level analysis, based on the derived cost, demand and revenue functions: and (4) network-level analysis to see how airlines make choice of aircraft size systematically at a network level. An airline can accommodate the increasing air travel demand by either increasing operation frequency, or increasing aircraft size that is represented by seat capacity, or both. Airport runway capacity and productivity depend on the size of aircraft used at airport. This paper presents the understanding of how airlines make decisions on the size of aircraft to operate, how they will adjust their choices when airport capacity is constrained, and how public regulation such as policy for landing fees could influence airlines' aircraft choice.

  • PDF

Anlysis of the Environmental Load Impact Factors for IPC Girder Bridge Using Principal Component Anlysis (주성분 분석을 활용한 IPC 거더교의 환경부하량 영향요인 분석)

  • Kim, Joon-Soo;Jeon, Jin-Gu;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.46-54
    • /
    • 2018
  • In the 21st century, the Earth has continued its efforts to reduce carbon emissions to overcome the crisis caused by climate change. The construction industry, which is a representative industry that produces large amounts of the environmental load during construction, should actively reduce the amount of the environmental load. From the planning stage of the construction facility, it is necessary to consider the environmental load such as route selection and structure type selection to reduce the environmental load. However, the environmental load can be estimated based on the input resource amount. However, in the planning stage, it is difficult to accurately calculate the environmental load due to lack of information on the construction amount. The purpose of this study is to select the environmental load factors for IPC girder bridges to be used in the environmental load estimation model in the planning stage. Specific information related to the environmental load was selected from a list of information available in the planning stage, reflecting the Life Cycle Assessment(LCA), correlation, principal components analysis and expert opinion. The list of selected planning stage information is 10 such as span length and bridge extension, and it is expected to be used as a basic data for the future development of environmental load estimation model.

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

Determination of Priority in Installing Road in Farming and Fishing Communities by Using GIS & Statistical Analysis Techniques (농어촌도로 개발 우선순위 결정을 위한 GIS와 통계분석기법의 활용)

  • Kim, Dong-Moon;Lee, Sang-Yeun;Park, Byung-Soo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.24 no.4
    • /
    • pp.351-358
    • /
    • 2006
  • The farming and fishing village roads is located in a mountainous geographical feature, a resident's movement zone is followed by many restrictions in economic activities or social activities. Establishment of general planning gets into guide of long-term development direction for road in farming and fishing villages area. This study examined and analyzed a regional characteristics such as a regional environment and traffic condition, etc. and an actual condition of farming and fishing village roads, selected a factor affecting a priority to open a road, calculated a weight per each factor by AHP & Statistical analysis techniques, converted it into GIS database, and determined a priority for paying forming and fishing village roads. It is that development precedence and estimation calculation are decided applying result of research, GIS and AHP and statistical processing techniques.

A Study on the Generation of Perspective Image View for Stereo Terrain Analysis for the Route Decision of Highway (고속도로 노선선정에서의 입체지형분석을 위한 영상조감도 생성에 관한 연구)

  • Yeon, Sang-Ho;Hong, Ill-Hwa
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.1-8
    • /
    • 2002
  • The technology for the three-dimensional terrain perspective view can be used as an important factor in planning and designing for the various construction projects. In this study, the stereo image perspective view has been generated for the multi-dimension analysis by combining useful digital map and remotely sensed satellite images. In the course of experimenting with the three-dimensional topography generated by the combination of the orthopimage by the precise GCP and DEM from the contour line, the technology has been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This stereo image bird's eye view has made it possible to make multi-dimensional analysis on the terrain, which provides real-time virtual access to the designated construction sites and will be a versatile application for development planning and construction projects.

  • PDF

A Study on Social Welfare Reflecting Road Maintenance Cost: the Case of Cheonan$\sim$Nonsan Lines (도로유지비용을 고려한 사회적 후생에 관한 연구 : 천안$\sim$논산 구간을 중심으로)

  • Kim, Woong-Yi;Park, Sang-Zoon;Kang, Kyung-Woo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.5
    • /
    • pp.159-169
    • /
    • 2008
  • The aim of this paper is to research the changes of social welfare by internalizing external cost, especially the maintenance cost. Main target of this paper is the Cheonan$\sim$Nonsan Line, where private capital highway, national highway and local road are competing against each other. Considering the realistic difficulties in applying the First Best pricing, this paper applied the Second Best pricing, applying the maintenance cost, in lieu of the already mentioned. The demand functions of the toll roads were built through regression analysis. By reflecting the maintenance cost to the toll fee, It was able to confirm the variation of social welfare deriving from the traffic assign change but also the aspects of toll revenue at the same time. Result of applying the Second Best pricing shows merely a small change in social welfare. However, in the aspect of finance, it is analyzed that there will be about 13 billion won worth of financial effectiveness which will contribute to the reduction of the national financial support.

  • PDF

A Study on the Establishment of Redundancy for Stable Operation of Integrated Railway Network (LTE-R) (철도통합무선망(LTE-R)의 안정적인 운영을 위한 이중화 구축 방안 연구)

  • Pyo, Seung-ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.51-58
    • /
    • 2019
  • The LTE system decided to build an integrated disaster safety communication network in order to cope with disasters quickly after the April 16, 2014 disaster, and 333 agencies in 8 areas will build a unified disaster safety communication network. It plans to integrate LTE-R, a railway integrated wireless network, and LTE-M, a land-based communication network, in the 700MHz band. LTE-R, a wireless integrated network, and the Ministry of Land, Transport and Maritime Affairs, are currently using VHF and TRS, which are voice communication-oriented communication systems, in order to cope with demand for high-speed railway service, With this possible LTE-R, it is possible to provide advanced services such as radio-based train control and improve railway safety. The company plans to invest KRW 1.1 trillion in new routes to be launched in 2018 and the existing route to be improved in the future, and to build up all routes of general and high-speed railways to LTE-R by 2027.

A Case study on the Application of Vibration Controlled Blasting Method (진동제어발파공법 적용 사례에 관한 연구)

  • 손영복;김재훈;원연호
    • Explosives and Blasting
    • /
    • v.21 no.3
    • /
    • pp.61-71
    • /
    • 2003
  • 최근 도심지 굴착공법 선정시 주변환경에 대한 관심이 높아지면서 민원발생을 감안하여, 발파공법이 아닌 기계굴착공법(TBM, SHIELD 등) 등이 부분적으로 적용되고 있다. 그러나 이들 굴착공법들은 굴착조건의 변화에 따라 적용 한계성이 있고, 한계구간이 직면할시 시공성이 극히 떨어지거나 적용 자체가 불가능하게 된다. 이에 따라, 공사기간의 연장, 공사비의 증가 및 적용자체가 불가 할 경우는 공사중단에 이르게 되어 시공과정에서 다른 굴착공법으로 전환되는 사례가 빈번히 발생되고 있다. 따라서 본 사례는 도심지 터널구간으로 당초 할암공법으로 설계되었으나 암반의 강도가 높고 굴착단면적이 협소하여 할암공법이 적용될 수 없었다. 이에 대한 대안공법으로 TBM이나 기타 장비에 의한 기계굴착공법을 검토하였으나, 터널연장이 짧고 터널노선의 곡선부 반경이 작아 대형장비의 투입이 어려운 굴착조건 때문에 최종적으로 폭약을 이용한 발파굴착 공법을 선정하였다. 그러나 발파공법은 진동 및 소음이 필연적으로 수반되기 때문에, 주변 환경공해가 허용하는 범위 내에서 최대한의 시공성과 안전성 여부를 판단하기 위하여 발파진동 및 소음의 허용수준을 설정한 후 시험발파를 실시하였으며, 그 결과에 따라 진동제어발파공법을 적용하였다.

A Study on the Optimum Selection of Railload Line using VE-LCC Analysis - Based on the Optimum Selection of Railway Bridge - (VE-LCC 분석을 통한 철도 노선의 최적안 선정방안 연구 - 교량 선정방안을 중심으로 -)

  • Shin Tae-Kyun;Lee Seung-Hoon;Kwon Jae-Seong;Koo Jeong-San;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.488-493
    • /
    • 2005
  • Railload line design of the railroad construction project should be planed considering the variety of quantitative and qualitative factors, and needs to be selected the optimum altinative weighing from VE/LCC analysis of the planned design. The purpose of this research is for showing selecting plan of the optimum railload line and railway bridge applying VE/LCC analysis in selecting the optimum altinative of railroad construction based on quantitative and qualitative factors, such as initial construction cost, maintenance cost, owner and user's requirements. In this research showed the application plan by each stage using data analysis, function analysis, and alternative evaluation of VE/LCC analysis with AHP and LCC analysis program for the selection. This research is proved the rationality and application of the course of selecting the optimum alternative through case application

  • PDF

Evaluation of Transit Services based on Transit Smart Card Data (스마트카드 데이터를 활용한 대중교통 서비스 평가)

  • Choi, Myoung-Hun;Eom, Jin-Ki;Lee, Jun;Park, Jong-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1811-1825
    • /
    • 2011
  • This study analyzed the transit services with respect to transit service measures such as the load factor representing number of passengers between stops, dwelling time, and operational speed based on transit smart card data recorded in 2009. A case study on the local bus line 7024 connecting Seoul railway station to evaluate bus services at passenger perspectives was accomplished. From the results, we found that the dwelling time was not affected by the number of passengers which is because the tagging patterns are different among passengers. The operational speed was analyzed by calculating the average speed of the bus route and the speed of each bus stops based on dwelling time. Interestingly, calculating operation speed based on the transit smart card data is the first time effort ever made and this means that it is not necessary to observe travel speed of bus and railway at a field level any more. we hope that this study will be a basis of evaluation of transit services purely based on the transit smart card data and help to make better transit services for passengers and operators as well.

  • PDF