An airline should consider the number of seats or size of aircraft, when it composes fleet or selects a type of aircraft for some routes. There are two major factors considered for this choice problem under the assumption that the objectives of an airline is a profit maximization: the operating cost and revenue from the aircraft operated. This research tries to solve the problem of aircraft size selection by airline. The study applies four steps to get optimal choice of aircraft size: (1) cost analysis for the relationship between airline operation cost and aircraft size: (2) market share and revenue analysis: (3) flight segment-level analysis, based on the derived cost, demand and revenue functions: and (4) network-level analysis to see how airlines make choice of aircraft size systematically at a network level. An airline can accommodate the increasing air travel demand by either increasing operation frequency, or increasing aircraft size that is represented by seat capacity, or both. Airport runway capacity and productivity depend on the size of aircraft used at airport. This paper presents the understanding of how airlines make decisions on the size of aircraft to operate, how they will adjust their choices when airport capacity is constrained, and how public regulation such as policy for landing fees could influence airlines' aircraft choice.
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.46-54
/
2018
In the 21st century, the Earth has continued its efforts to reduce carbon emissions to overcome the crisis caused by climate change. The construction industry, which is a representative industry that produces large amounts of the environmental load during construction, should actively reduce the amount of the environmental load. From the planning stage of the construction facility, it is necessary to consider the environmental load such as route selection and structure type selection to reduce the environmental load. However, the environmental load can be estimated based on the input resource amount. However, in the planning stage, it is difficult to accurately calculate the environmental load due to lack of information on the construction amount. The purpose of this study is to select the environmental load factors for IPC girder bridges to be used in the environmental load estimation model in the planning stage. Specific information related to the environmental load was selected from a list of information available in the planning stage, reflecting the Life Cycle Assessment(LCA), correlation, principal components analysis and expert opinion. The list of selected planning stage information is 10 such as span length and bridge extension, and it is expected to be used as a basic data for the future development of environmental load estimation model.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.6D
/
pp.771-778
/
2011
Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.24
no.4
/
pp.351-358
/
2006
The farming and fishing village roads is located in a mountainous geographical feature, a resident's movement zone is followed by many restrictions in economic activities or social activities. Establishment of general planning gets into guide of long-term development direction for road in farming and fishing villages area. This study examined and analyzed a regional characteristics such as a regional environment and traffic condition, etc. and an actual condition of farming and fishing village roads, selected a factor affecting a priority to open a road, calculated a weight per each factor by AHP & Statistical analysis techniques, converted it into GIS database, and determined a priority for paying forming and fishing village roads. It is that development precedence and estimation calculation are decided applying result of research, GIS and AHP and statistical processing techniques.
Journal of the Korean Association of Geographic Information Studies
/
v.5
no.3
/
pp.1-8
/
2002
The technology for the three-dimensional terrain perspective view can be used as an important factor in planning and designing for the various construction projects. In this study, the stereo image perspective view has been generated for the multi-dimension analysis by combining useful digital map and remotely sensed satellite images. In the course of experimenting with the three-dimensional topography generated by the combination of the orthopimage by the precise GCP and DEM from the contour line, the technology has been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This stereo image bird's eye view has made it possible to make multi-dimensional analysis on the terrain, which provides real-time virtual access to the designated construction sites and will be a versatile application for development planning and construction projects.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.7
no.5
/
pp.159-169
/
2008
The aim of this paper is to research the changes of social welfare by internalizing external cost, especially the maintenance cost. Main target of this paper is the Cheonan$\sim$Nonsan Line, where private capital highway, national highway and local road are competing against each other. Considering the realistic difficulties in applying the First Best pricing, this paper applied the Second Best pricing, applying the maintenance cost, in lieu of the already mentioned. The demand functions of the toll roads were built through regression analysis. By reflecting the maintenance cost to the toll fee, It was able to confirm the variation of social welfare deriving from the traffic assign change but also the aspects of toll revenue at the same time. Result of applying the Second Best pricing shows merely a small change in social welfare. However, in the aspect of finance, it is analyzed that there will be about 13 billion won worth of financial effectiveness which will contribute to the reduction of the national financial support.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.2
/
pp.51-58
/
2019
The LTE system decided to build an integrated disaster safety communication network in order to cope with disasters quickly after the April 16, 2014 disaster, and 333 agencies in 8 areas will build a unified disaster safety communication network. It plans to integrate LTE-R, a railway integrated wireless network, and LTE-M, a land-based communication network, in the 700MHz band. LTE-R, a wireless integrated network, and the Ministry of Land, Transport and Maritime Affairs, are currently using VHF and TRS, which are voice communication-oriented communication systems, in order to cope with demand for high-speed railway service, With this possible LTE-R, it is possible to provide advanced services such as radio-based train control and improve railway safety. The company plans to invest KRW 1.1 trillion in new routes to be launched in 2018 and the existing route to be improved in the future, and to build up all routes of general and high-speed railways to LTE-R by 2027.
최근 도심지 굴착공법 선정시 주변환경에 대한 관심이 높아지면서 민원발생을 감안하여, 발파공법이 아닌 기계굴착공법(TBM, SHIELD 등) 등이 부분적으로 적용되고 있다. 그러나 이들 굴착공법들은 굴착조건의 변화에 따라 적용 한계성이 있고, 한계구간이 직면할시 시공성이 극히 떨어지거나 적용 자체가 불가능하게 된다. 이에 따라, 공사기간의 연장, 공사비의 증가 및 적용자체가 불가 할 경우는 공사중단에 이르게 되어 시공과정에서 다른 굴착공법으로 전환되는 사례가 빈번히 발생되고 있다. 따라서 본 사례는 도심지 터널구간으로 당초 할암공법으로 설계되었으나 암반의 강도가 높고 굴착단면적이 협소하여 할암공법이 적용될 수 없었다. 이에 대한 대안공법으로 TBM이나 기타 장비에 의한 기계굴착공법을 검토하였으나, 터널연장이 짧고 터널노선의 곡선부 반경이 작아 대형장비의 투입이 어려운 굴착조건 때문에 최종적으로 폭약을 이용한 발파굴착 공법을 선정하였다. 그러나 발파공법은 진동 및 소음이 필연적으로 수반되기 때문에, 주변 환경공해가 허용하는 범위 내에서 최대한의 시공성과 안전성 여부를 판단하기 위하여 발파진동 및 소음의 허용수준을 설정한 후 시험발파를 실시하였으며, 그 결과에 따라 진동제어발파공법을 적용하였다.
Railload line design of the railroad construction project should be planed considering the variety of quantitative and qualitative factors, and needs to be selected the optimum altinative weighing from VE/LCC analysis of the planned design. The purpose of this research is for showing selecting plan of the optimum railload line and railway bridge applying VE/LCC analysis in selecting the optimum altinative of railroad construction based on quantitative and qualitative factors, such as initial construction cost, maintenance cost, owner and user's requirements. In this research showed the application plan by each stage using data analysis, function analysis, and alternative evaluation of VE/LCC analysis with AHP and LCC analysis program for the selection. This research is proved the rationality and application of the course of selecting the optimum alternative through case application
This study analyzed the transit services with respect to transit service measures such as the load factor representing number of passengers between stops, dwelling time, and operational speed based on transit smart card data recorded in 2009. A case study on the local bus line 7024 connecting Seoul railway station to evaluate bus services at passenger perspectives was accomplished. From the results, we found that the dwelling time was not affected by the number of passengers which is because the tagging patterns are different among passengers. The operational speed was analyzed by calculating the average speed of the bus route and the speed of each bus stops based on dwelling time. Interestingly, calculating operation speed based on the transit smart card data is the first time effort ever made and this means that it is not necessary to observe travel speed of bus and railway at a field level any more. we hope that this study will be a basis of evaluation of transit services purely based on the transit smart card data and help to make better transit services for passengers and operators as well.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.