Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site (건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템)

  • Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.133-140
    • /
    • 2016
  • The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

A Manpower Forecasting Regression Model for Apartment House Construction Project based on the Historical Data (실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모델)

  • Son, Yong-Seok;Shim, In-Bo;Kwon, Jae-Sung;Jeon, Sang-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.85-93
    • /
    • 2006
  • This study is started from a situation of korean construction which has been undergoing diversity. And risk of construction project has been increased recently. The purpose of this study is to propose the model which is able to estimate the proper manpower by eliciting the variable which is offered in the pre-design and construction phase. The existing method of estimate has a problem with calculating exact costs. For this model, it was analyzed the existing manpower estimating model and used historical data of 38 apartment houses, constructed from 2000 to now. Based on these, the regression model of the construction manpower was built. And then the regression model was verified. The result of verification was relatively adequate in the statistics exept for some cases. This regression model will help make it possible for constructor to estimate the deduction of retirement more accurate than existing method.

Mutual information analysis of EEG during odor stimulation classified with occupations (향 자극에 따른 직업별 뇌파의 상호 정보량 분석)

  • 민병찬;강인형;진승현;전광진
    • Proceedings of the Korean Society for Emotion and Sensibility Conference
    • /
    • 2002.11a
    • /
    • pp.205-208
    • /
    • 2002
  • 본 연구에서는 단순노무직, 판매직, 전문직에 종사하는 피험자를 대상으로 100%의 basil oil, lavender oil, lemon oil, jasmine oil, ylang-ylang oil (KIMEX co. Ltd, Korea), skatole (TAKASAGO co. Ltd, Japan)등 총 6가지 종류의 천연향에 대한 두뇌의 정보량 흐름을 파악하기 위해 상호 정보량을 검토하였다. 그 결과, 전문직에서는 상호 정보량의 유의한 변화가 전두엽 사이(F3F4)에서 나타난 반면, 단순노무직과 판매직에서는 전두엽(F3F4), 두정엽(P3P4), 측두엽(T5T6) 사이에서 모두 나타났다. 두 직종과 비교하여 전문직이 주로 외부 자극에 대한 고차원적 기능을 담당하는 전두엽영역의 정보량에서 유의한 변화를 보인 것은 향을 전문적으로 구분하고, 확인하는 그들의 직업적 특성을 반영한 결과라 추측된다. 또한, 단순노무직과 달리, 전문직과 판매직은 선호도가 낮은 향에서 상호 정보량이 증가하는 경향을 보여, 향 관련 종사자들의 선호도와 상호 정보량간의 관련성을 시사하였다.

  • PDF

Analysis of Trends in the Labor Productivity and Actual Amount of Labor Input in the Reinforced Concrete Construction of Health Facilities (의료시설 철근콘크리트공사에서 생산성과 실투입 노무량의 추이에 관한 분석)

  • Jeong, Jae-Woong;Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.103-104
    • /
    • 2015
  • Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.

  • PDF

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions (공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.97-104
    • /
    • 2015
  • Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.

Mutual information analysis of EEG during odor stimulation classified with occupations (향 자극에 따른 직업별 뇌파의 상호 정보량 분석)

  • 민병찬;진승현;강인형;전광진;김철중
    • Science of Emotion and Sensibility
    • /
    • v.6 no.1
    • /
    • pp.39-45
    • /
    • 2003
  • To investigate the changes of cortico-cortical connectivity during odor stimulation of subjects classified by occupations, the mutual information content of EEGs was examined, for general workers, perfume salespersons and professional perfume researchers. Analysis of the averaged-cross mutual information content (A-CMI) from the EEGs revealed that, among the professional perfume researchers,. changes in the A-CMI values during odor stimulation were more apparent in the frontal region of the brain, although for the general workers group and perfume salespersons group such changes were more conspicuous in the overall posterior temporal, parietal and frontal regions. These results indicate that the brains of professional perfume researchers respond to odors mainly in the frontal region, reflecting the function of the orbitofrontal cortex (OFC) due to the occupational requirement of these subjects to discriminate of identify odors. During odor stimulation, the perfume salespersons, although relatively more exposed to odors than the general workers, showed similar changes to the general workers. A-CMI value is in inverse proportion to psychological preferences of the professional perfume researchers and perfume salespersons, but this is not the case with the general workers. This suggests that functional coupling for people who are occupationally exposed to odors may be related to odors nay be related to psychological preference.

  • PDF