• 제목/요약/키워드: 노무라

Search Result 601, Processing Time 0.027 seconds

An Exploratory Study on Gotcha Journalism (가차 저널리즘(gotcha journalism), 탐색적 연구: 노무현정부 출범 이후 정치보도를 중심으로)

  • Kim, Dong-Yule
    • Korean journal of communication and information
    • /
    • v.29
    • /
    • pp.43-71
    • /
    • 2005
  • The study attempts to introduce 'Gotcha Journalism' to the Korea journalism, research and analyze it. Gotcha journalism is the journalistic reporting attitude that the journalists repeatedly and intensively reports public figures, especially politicians' mistakes or happening. 'Gotcha' is abbreviation of "I got you", frequently used in the English and American culture. In order to get the goal of this study, several journalists who are currently working for Chosun, Joongang, Dong-a, Hangyore, Kyunghyang and Seoul, national covering daily newspapers. In addition, the reporters who work for KBS, MBC, and SBS were Interviewed. All journalists who have been worked more than 5 years at the politic department were selected as interviewees. Thus, Intensive interviews are prime source of this study. Based the result of the research, gotcha journalism is externally derived from obsessive interest of Korean people to politics. Internally, it is easy to report happening or mistakes rather than big argument or ideological agenda of the politicians as news for journalists and to catch readers. In addition, the competition with advertising income accelerates this situation. And gotcha journalistic reporting behavior or attitude highly relates to political propensity of the newspapers or broadcastings. Especially some of the newspapers take gotcha journalism as a political struggling tool. It is appeared that another major cause for gotcha journalistic reporting behavior is customer-driven news production.

  • PDF

The Evaluation of Korean Public Broadcasting: With the Construction of Evaluation Model for Fairness and Survey of Experts in Public Broadcasting (한국 공영 방송의 공정 보도에 대한 인식 평가: 공정 보도 계측을 위한 모델 구축 및 전문가 대상 설문 조사)

  • Shim, Hoon
    • Korean journal of communication and information
    • /
    • v.66
    • /
    • pp.110-132
    • /
    • 2014
  • This study attempts to redefine the concept of 'fairness' of Korean public broadcasting and tries to build a new model for evaluating the fairness of Korean public broadcasting. The author insists that the fairness in public broadcasting consists of binary components of the public and rightful reporting, and views that the public reporting represents of neutralness, balance and impartiality while the rightful reporting represents of factuality, multiplicity and the protection of social minorities. The author suggests that two criteria of the public and rightful reporting results in four models of 'shepherd', 'acrobat', 'tribune', and 'trumpeter' in accord with its focus on the public and the rightful reporting. Survey toward the professionals in public broadcasting in academia was conducted and addressed the fact that Korean public broadcasting is close to the trumpeter model with some feature of acrobat.

  • PDF

Non-regular Female Workers toward Convergence Era: Description and Unemployment Assistance (융복합 시대 비정규직 여성과 실업부조 도입의 필요성)

  • Yoo, Ji-Young
    • Journal of Digital Convergence
    • /
    • v.13 no.7
    • /
    • pp.33-45
    • /
    • 2015
  • Present study aims to describe who are the non-regular female workers in South Korea. The dominant form of employment of Korean female non-regular workers is characterized by instable contract, low wage, long-time work and exclusion from the state and occupational welfare. Also, non-regular female workers are not homeogenous but there are various groups of women among female non-regular workers including young part-time workers, high educational middle class contract professionals, particular contract workers such as home-schooling teachers. However, it would worth noting that over 40s, low-educational, low income, breadwinning women who are working in sales, service, and simple handy job are most likely to become non-regular female workers in South Korea. Those women are the major group among non-regular female workers. The public assistance (in cash) for non-regular workers are necessarily needed for them at this point in South Korea.

A Study about the Real Estate' Policy Impact on house prices (Focusing on the time series analysis and regression) (부동산정책이 주택가격에 미치는 영향에 관한 연구 (시계열분석과 회귀분석 중심으로))

  • Ko, Pill-Song;Park, Chang-Soo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.5 no.2
    • /
    • pp.205-213
    • /
    • 2010
  • This study was to analyze the past regime's real estate policy and the time-series data on real estate price index from 1986 to 2009 in 24 years. Also, the real estate index and macroeconomic variables, the impact on house price index variable conducted to regression analysis and to analyze whether and how much is affected. Analyzed as follows: First, Korea's real estate policy was the post-policy and the past regime's real estate policy was inconsistent with each other. Second, in the normal phase whenever real estate issues, the measures of the strengthening regulation and of the economic recovery were only to repeat periodically. Third, the timing and means of policy enforcement was an inappropriate and Real estate market was getting worse at the time whenever a real estate policies performed. Fourth, The apartments prices index of the housing types rose the highest and were the most popular for 24 years. Increase or decrease the amount of the price index for apartments, Roh Tae-woo(65.0%) - Kim Dae-jung (42.5%) - Roh Moo-hyun (32.8%) were in order. Fifth, the results of the regression analysis carried out: The impact on housing prices among independent variables were followed by Cap Construction- one per capita income - Housing consumer price index - Accompanying Composite Index - Trailing Composite Index - Home subscription Subscriber account - Leading Composite Index.

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

A Proposal for Development of the Certification and Level System of Construction Craft Workers (건설기능인력 자격 및 직급체계 구축방안 제안)

  • Kim, Bong-Ju;Jung, Myung-Ho;Hyun, Chang-Taek;Koo, Kyo-Jin;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.105-114
    • /
    • 2006
  • The construction craft workers have been getting older and have become drained, in spite of the vital factor that it directly affects productivity and quality as a final producer. This situation in the construction industry is ultimately due to evasion of performances by young craft workers. Therefore, the aim of this study is to propose the certification and level system of construction craft workers and to extract young craft workers from the market for construction craft workers so as to supply and demand high quality of craft workers. First of all, the present status and problems of the domestic construction craft workers are considered in this study. Furthermore, the appropriate way to establish its certification and level system is suggested from the Interview with experts, as well as references of German and Australian case. The revitalization of certification and level system provided in this study is expected to ensure that the craft workers are not simple laborers, but are required the professional knowledge and skill. Besides, it will lead to strengthen specificity and to break from aging, by taking young and qualified craft workers into the construction industry. Also, it will promote an employment stability by connecting the social security system.

To Improve Production Process of the Modular Using the Conveyor System (모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -)

  • Bae, Byung-Yoon;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.103-112
    • /
    • 2012
  • Republic of Korea is recently becoming an advanced country with increasing standard of living. This is causing a lack of employment in the construction industry because of high labor costs and it is resulting rapid increase in foreign labors. Modular Method of Construction can be defined as 50%~90% of the entire process is completed in factory, and transferred to construction field to install. The main purpose of this process is to minimize the entire process that possibly can be done at construction field in order to maximize the quality. The current local usage of Modular Method of Construction started at Shin Ki Elementary School during 2003 and it is widely used for military facilities. It should be used more because it has strengths of spending short time period to complete and low production costs. It can make a change if Modular Method of Construction is applied. Toyota is currently producing vehicle with conveyor system and if Modular Method of Construction is applied, then it is possible to reduce the waste of labor, and automatic production time. Expansion of the modular Market can be expected by applying this method because it will improve producing costs, high quality, and enforced process. This research tried to solve the problem of factory's manufacturing production by applying local Modular Method of Construction to provide suggestions and analyze the profitability with applied conveyor system. It is depending on produced model, but this research's model will take 20 months including assessment of payback period.

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China (한국 및 중국 도로교량공사의 생산성자료 및 예정가격 산정시스템 비교분석)

  • Chang, Cheng;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.39-47
    • /
    • 2020
  • There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.