• Title/Summary/Keyword: 노무라

Search Result 600, Processing Time 0.021 seconds

A Study on The Characteristics of Residential Area of Housing Voucher Program - in the Case of the Seoul Metropolitan Area (주택바우처 수혜자의 주거지 특성 분석 - 서울시를 중심으로)

  • Kim, Ga-Yeon;Hong, Hee-Jeong;Hong, Sung-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.7
    • /
    • pp.207-220
    • /
    • 2016
  • Paradigm for supporting housing for low-middle income class has been changing from public rental housing to Housing Voucher. Housing Voucher started first in Seoul since 2010, and it has been expended to other areas in 2014. Given the dearth of previous research data, this study aims to analyze options determinants that the beneficiaries could consider in choosing their residential area. In this study, the researcher used for the research methods, a quantitative analysis by Geographically Weighted Regression (GWR) and Ordinary Least Square (OLS) has been conducted. As a result, the accessibility to social welfare centers, public transportation and job opportunities emerged main factors to for the Housing Voucher recipients in Seoul to choose their residential area. This is different results from previous research, which has two implications. First, reexamination of Housing Voucher is necessary. Second, Housing Voucher beneficiaries should include not only the housing but also support for family and welfare system access.

Law Sociological Analysis on Decision Tendency of Appeals for Teachers (법사회학적 접근을 통한 교원소청심사 사건수 및 인용율 경향 분석)

  • Um, Sang-Heon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.1
    • /
    • pp.199-209
    • /
    • 2013
  • This study seeks to use the law sociological system model, to define the internal and external environmental changes that influence decisions of teacher appeals, and to analyze time-series trends of teacher appeals. This study analyzed appeal cases for 21 years from 1991 to examine number of lawsuits and relief rates by year. As a result, overall, in the case of the 1990s, the relief rates changed irregularly. However, after 2000, overall relief rates declined. This result was discussed to come from the societal request for responsibility of teachers and schools. It was suggested that, to achieve the original objective of appeal system for teachers, there should be a change toward the legal stability.

Cost Analysis of Construction Phase in Basement Composite Wall Form (지하 합벽 거푸집의 시공단계별 원가 분석에 관한 연구)

  • Choi, Oh-Young;Heo, Kyoung-Moo;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.189-195
    • /
    • 2009
  • Recently, the urban centralization phenomenon appears to be growing. As a result, many vigorous efforts for the use of underground space are being made. In particular, the basement depth of construction in the downtown area has deepened and construction is often done close to adjacent buildings. In this case, generally, the underground construction approach mainly used is the composite basement wall system. However, a cost analysis of the basement composite wall system does not exist. Therefore, in this study, the cost of the composite basement wall system was analyzed. The percentage breakdown of costs were: buttress work processes, 3% form work processes, 26% reinforcement work processes, 12% support work processes, 42% and other processes,17%. Accordingly, it will be necessary when developing new technology and construction methods to determine the development focus.

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

A Study on the Effects of Preparation for the Old Aged on the satisfaction of the life (중장년층의 노후준비가 삶의 만족도에 미치는 영향연구)

  • Jin, Ju-Young;Ha, Kyu-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.2
    • /
    • pp.45-57
    • /
    • 2016
  • This study examined the effect factors for the preparations for the old age on the current satisfaction of life of the middle-aged. A survey of middle aged people living in Seoul and metropolitan areas was conducted. The data from 442 subjects were collected from 450 questionnaires excluding 8 incomplete datasets and analyzed. The results were as follows. First, the emotional and economical preparations for the old age had influences on the emotional satisfaction positively. Second, the educational background, jobs for technician/working, emotional and physical preparations for old age had a positive effect on the physical satisfaction. Third, the household income, emotional and economical preparation for the old age had a positive influence on the economical satisfaction. Fourth, sex, emotional preparations for old age had a positive effect on the social relation satisfaction. The research results suggested that the preparations for the old age should be arranged from the middle-aged years because it is difficult to improve the satisfaction of life for old age in the elderly.

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

A Study on the Problem Analysis and Improvement Plan Development of the Construction Cost Saving Policy in the Public Educational Facilities Projects (공공교육시설 건설공사비 절감방안의 문제점 분석과 개선방향에 관한 연구)

  • Ock Jong-Ho;Han Seung-Hyen
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.98-106
    • /
    • 2001
  • The Ministry of Education and Human Resource Development has implemented the Construction Cost Saving Policy since 1998. The National Universities and Regional Education Committee have been required to follow the details of the Policy in constructing educational facilities in their jurisdiction. While the Policy has positive effect on construction cost saving of the entities, it has been criticized from the beginning of the Policy implementation because of its negative impact on project quality, education quality, trust in the public sector construction business, and solvent operation of the private construction companies which build the educational facilities in the entities. The research aims at investigating the pitfalls of the Policy and suggesting more reasonable approaches that can satisfy both the governmental entities and the private companies.

  • PDF

Analysis of the Level and Competence Factors on Specialty Contractors' Employees (전문건설업체 종사자의 업무수행수준 및 필요역량요인 분석)

  • Hong, Sung-Ho;Jung, Dae-Woon;Oh, Chi-Don
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.54-64
    • /
    • 2015
  • It is required to be enhancement of competitiveness for specialty contractors' employees due to specialty contractors are in charge of the actual construction work. The effective educational program for specialty contractors' employees is essential to improve the work performance of them. Therefore, the purpose of this study is to analyze level of work performance and find factors of core competence for specialty contractors' employees that can be utilized for development of effective educational program. The survey is based on CEO, Engineer and Manager in specialty contractors, and a questionnaire survey was performed to investigate the importance of job task, work load and degree of work difficulty as well as their core competence needs. The analysis result of this study can be utilized for development of effective educational program which is reflected the characteristics of specialty contractor's employees.

Data Acquisition Technology (DAT) Selection Algorithm for Automated Progress Measurement and Management (진도관리 자동화를 위한 자료수집기술(DAT) 선정 방법)

  • Kang, Seung-Hee;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • Progress measurement provides project participants with valuable information in terms of 'current status', 'corrective countermeasure', and 'forecast of future risks'. However, the managerial effort (or workload) required to acquire and maintain detailed progress data has been the major barrier to practical implementation. Even though recent efforts in utilizing data acquisition technologies (DATs) have actively attempted to automate the progress measurement process, previous DAT research has only been focused on limited construction tasks or selected technologies. This paper proposes a DAT selection algorithm that automatically assign an appropriate DAT for every commodity item for an entire constriction project. Five different criteria were identified and developed in order to comprehend specific requirements for automating the progress measurement of each commodity group. A case-study and also a survey from practitioners were conducted in order to validate the proposed methodology.