Browse > Article
http://dx.doi.org/10.6106/KJCEM.2015.16.2.054

Analysis of the Level and Competence Factors on Specialty Contractors' Employees  

Hong, Sung-Ho (Korea Research Institute for Construction Policy)
Jung, Dae-Woon (Korea Research Institute for Construction Policy)
Oh, Chi-Don (Korea Research Institute of Mechanical Facilities Industry(KRIMFI))
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.2, 2015 , pp. 54-64 More about this Journal
Abstract
It is required to be enhancement of competitiveness for specialty contractors' employees due to specialty contractors are in charge of the actual construction work. The effective educational program for specialty contractors' employees is essential to improve the work performance of them. Therefore, the purpose of this study is to analyze level of work performance and find factors of core competence for specialty contractors' employees that can be utilized for development of effective educational program. The survey is based on CEO, Engineer and Manager in specialty contractors, and a questionnaire survey was performed to investigate the importance of job task, work load and degree of work difficulty as well as their core competence needs. The analysis result of this study can be utilized for development of effective educational program which is reflected the characteristics of specialty contractor's employees.
Keywords
Specialty Contractors' Employees; Work Burden; Capacity Ratio; Competence Factors;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Hong, S. H. and Kim, E. M. (2009). Future prospects for market mutual entry by abrogation of restrictions an general and specialty contracting, Korea Research Institute for Construction Policy(RICON).
2 Hong, S. H., Jung, D. W., Shin, J. Y. and Lee, D. W. (2013). "The status and Improvement Scheme of Educational Program for Specialty Contractors' Employees", Journal of the Korean Society of Civil Engineers, KSCE, 33(6), pp. 2563-2573.   DOI   ScienceOn
3 Jang, Y. S. (2005). Development of Education System in Construction Reflecting Changes of Construction Industry Environment, Korean Society of Civil Engineers(KSCE).
4 Kim, M. C. and Son, C. B. (2010a). "A Status analysis on the Organization and Service for Job Site Management of Specialty Contractors in Reinforced Concrete Work", Journal of the Architectural Institute of Korea(Structure & Construction), AIK, 26(4), pp. 151-158.
5 Kim, M. C. and Son, C. B. (2010b). "Analyzing the Level and Influence Factors for Work Performance of Field Managers in Specialty Contractors", Journal of the Architectural Institute of Korea(Structure & Construction), AIK, 26(5), pp. 133-140.
6 Kim, W Y., Lee, B. N. and Kim, Y. J. (2010). Survey of Re-education Trends and Demands for Construction Labors in Korea, Construction and Economy Research Institute of Korea(CERIK).
7 Kim. H. R., Lee, N. K. and Jang, H. S. (2013). "Analysis of Competency Assessment using IPA for Construction Project Managers", Korean Journal of Construction Engineering and Management, KICEM, 14(6), pp. 115-122.
8 Lee, J. Y. and Choi, H. M. (2009). "A Study on the Modeling and Evaluating of Competence for Construction Engineers", Journal of the Architectural Institute of Korea(Structure & Construction), AIK, 25(4), pp. 193-200.
9 Park, H. K. and Kim, J. S. (2003). The Improvements and Management Status for Educational Training in Construction Companies, Anyang Technical College.
10 Park, K. H. and Son, C. B. (2010). "Analysing the Level and Influence Factors for Work Performance of Field Managers in General Construction Companies", Korean Journal of Construction Engineering and Management, KICEM, 11(3), pp..115-124.   DOI   ScienceOn
11 Spencer L. M. and Spencer, S. M. (1993). Competency at Work : Models for Superior Performance, Jhon Wiley & Sons, New York, NY.
12 Kim, B. R (2005). Operation system Improvement for Field Management in the Apartment Construction, M.A., Se-myung University.
13 Kim, D. H. (2005). A Study on the Development of a Competency Model for the Major Funcition in a Construction Firm, M.A, Chung-Ang University.