Analysis of Changes in Groundwater Level according to Tunnel Passage in Geological Vulnerable Zone (지질취약구간 터널통과에 따른 지하수위 변화량 분석)

  • Choi, Jung-Youl;Yang, Gyu-Nam;Kim, Tae-Jun;Chung, Jee Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.369-375
    • /
    • 2020
  • The section of this study is the geological vulnerable zone where groundwater leakage occurred through the tunnel barrier during excavation of the shield tunnel boring machine(TBM) for the construction of the electric power unit. Therefore, a Three D imensions(3D) numerical analysis was performed to analyze the actual situation from before construction to the time when the change in groundwater level occurred, and to reflect the surrounding ground conditions based on the observed change in groundwater level during construction. As a result of the study, the correlation between groundwater level change and tunnel construction around the site was identified. Therefore, it was similar to the measurement result of groundwater level at the target ground. The amount of groundwater discharge to the entrance of the tunnel construction was also similar to the actual measured result, and the numerical analysis method and modeling in this study were analyzed to reflect the site conditions.

A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting (터널발파시 실제 작업시간과 품셈의 비교 분석)

  • Kim, Yang-Kyun;Kim, Hyung-Mok
    • Explosives and Blasting
    • /
    • v.33 no.3
    • /
    • pp.14-20
    • /
    • 2015
  • Tunnel blasting that plays the most important role in the construction of a drill & blast tunnel, shows a big difference in operation time according to various factors such as rock mass quality, tunnel dimension, machine performance, and the skill level of tunnel crews. This paper analyzes the differences between the time calculated by the standard of estimate and actual operation time based upon field investigations on blasting operation time in three tunnels of Korea. The result shows that actual blasting time is generally about 8%~16% less than the standard of estimate in cases that normal operations are performed. If the time delayed by unforeseen situations is included, however, it is presumed that the number of cases that actual operation time exceeds the standard of estimate are considerable. This study aims to help make a judgement over the appropriacy of the standard of estimate through continuous investigations on actual operation time, as well as improve the productivity of tunnel excavation.

The Behavior of Sheet Piling Walls supported by Anchors in Soft Ground (연약지반에 설치된 앵커지지 강널말뚝 흙막이벽의 거동)

  • 홍원표;송영석;김동욱
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.4
    • /
    • pp.65-74
    • /
    • 2004
  • Based on the field measuring data obtained from seven excavation sections in Inchon International Airport Project, the horizontal displacement of sheet piling walls supported by anchors and the lateral earth pressure acting on sheet piling walls was investigated in soft ground. The proposed diagram of lateral earth pressure is a rectangular form, and the maximum earth pressure corresponds to $0.6\gamma H$. The maximum earth pressure is similar to the empirical earth pressure proposed by NAVFAC(1982). The quantitative safe criterion of sheet piling walls with struts is established from the relationships between increasing velocity of maximum horizontal displacement and stability number in excavated ground. If the velocity of maximum horizontal displacement shows lower than 1mm per day, the sheet piling walls exist under stable state. When the velocity of maximum horizontal displacement becomes more than 1mm and less than 2mm per day, excavation works should be observed with caution. Also, when the velocity of maximum horizontal displacement becomes more than 2mm per day, appropriate remediations and reinforcements are applied to sheet piling walls.

A Study on the Lattice Girder by Increasing Contacting Area between Spider and Rod (스파이더와 강봉간 접촉면적을 증가시킨 격자지보재에 대한 연구)

  • Nam, Joong-Woo;Kim, Jin-Kyo;Cho, Yong-Gyo;Chun, Byung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.10
    • /
    • pp.17-25
    • /
    • 2012
  • Shotcrete, rockbolt, and steel rib are installed to support ground after tunnel was excavated. These are important supports for NATM applied tunnels. Recently, lattice girder is increasingly used because it is easily installed. In this study, we developed a new lattice girder by increasing contacting area between spider and rod. To verify the effect of the new lattice girder, the 3-point and 4-point flexural strength tests were carried out for LG-$50{\times}20{\times}30$, LG-$70{\times}20{\times}30$, LG-$95{\times}22{\times}32$. As a result, in case of contacting area, strength of new SGS lattice girder is 17.95% higher than that of original lattice girder. In case of weakness point, strength of new SGS lattice girder is 19.37% higher than that of original lattice girder.

A Study on Effect of Shotcrete Adhesive Strength on Large Section Rock Tunnel Stability (대단면 암반터널의 안정성에 미치는 숏크리트 부착강도의 영향에 관한 연구)

  • Chang, Seok-Bue;Hong, Eui-Joon;Moon, Sang-Jo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.4
    • /
    • pp.305-311
    • /
    • 2005
  • Shotcrete adhesive strength in large section tunnels in jointed rock masses plays an important role in preventing rock block from falling and shotcrete debonding due to blasting vibration. Nevertheless, it has not been considered as a major factor such as shotcrete compressive strength in design and construction. For this reason, the purpose of this study is to analyze the effect on shotcrete adhesive strength for large-sectioned tunnels. First, the parametric study using numerical model similar to Holmgren's punch-loaded test was executed for various range of adhesive strength. It shows that the shotcrete bearing capacity is linearly proportioned to the adhesive strength between shotcrete layer and blocks. And then, distinct element analysis of a jointed rock tunnel for an adhesive strength of 1 MPa and a conventional fully-bonded condition between the shotcrete layer and the excavation face was compared in order to evaluate the effect of the shotcrete adhesive strength.

  • PDF

Trenchless Repairing-Reinforcing Process of Underground Pipes with Advanced Composite Materials (신소재 복합재료를 이용한 비굴착 지하매설관 보수-보강공법)

  • 진우석;권재욱;이대길;유애권
    • Composites Research
    • /
    • v.15 no.1
    • /
    • pp.21-31
    • /
    • 2002
  • To overcome the disadvantages of conventional excavation technology various trenchless (or excavation free, or no-dig) repair-reinforcement technologies have been developed and tried. But trenchless technologies so far developed have some drawbacks such as high cost and inconvenience of operation. In this study, a repairing-reinforcing process for underground pipes with glass fiber fabric polymer composites using VARTM (Vacuum Assisted Resin Transfer Molding) has been developed. The developed process requires shorter operation time and lower cost with smaller and simpler operating equipments than those of the conventional trenchless technologies. For the reliable operation of the developed method, a simple method to apply pressure and vacuum to the reinforcement was devised and flexible mold technology was tried. Also, resin filling and cure status during RTM process were monitored with a commercial dielectrometry cure monitoring system, LACOMCURE. From the investigation, it has been found that the developed repairing-reinforcing technology with appropriate process variables and on-line cure monitoring has many advantages over conventional methods.

Stability analysis of tunnel spillway under internal water pressure (내부수압이 작용하는 여수로터널의 안정성 검토)

  • Park, Inn-Joon;Park, Moo-Jong;Kim, Sung-In;Kwak, Chang-Won;Jang, Seo-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • The influence of internal water pressure under the Probable Maximum Flood (PMF) on tunnel spillway is analysed using 3D FDM analysis. HEC-RAS program including 1-D hydrologic numerical model was also implemented to estimate the maximum pressure on the lining under the PMF, thereafter determined rational internal water pressure. Tunnel spillway was designed as twin tunnel and excavation and supporting stage are fully considered. Analysis was classified into the 3 cases; pressure is applied only to the left tunnel, only to right tunnel, and to both tunnels. The maximum tensile stress and axial force in supporting materials induced by water flow were compared with the critical values to assess the stablilty of the tunnel and the locations of stress concentration parts were also examined.

  • PDF

Performance comparison of machine learning classification methods for decision of disc cutter replacement of shield TBM (쉴드 TBM 디스크 커터 교체 유무 판단을 위한 머신러닝 분류기법 성능 비교)

  • Kim, Yunhee;Hong, Jiyeon;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.575-589
    • /
    • 2020
  • In recent years, Shield TBM construction has been continuously increasing in domestic tunnels. The main excavation tool in the shield TBM construction is a disc cutter which naturally wears during the excavation process and significantly degrades the excavation efficiency. Therefore, it is important to know the appropriate time of the disc cutter replacement. In this study, it is proposed a predictive model that can determine yes/no of disc cutter replacement using machine learning algorithm. To do this, the shield TBM machine data which is highly correlated to the disc cutter wears and the disc cutter replacement from the shield TBM field which is already constructed are used as the input data in the model. Also, the algorithms used in the study were the support vector machine, k-nearest neighbor algorithm, and decision tree algorithm are all classification methods used in machine learning. In order to construct an optimal predictive model and to evaluate the performance of the model, the classification performance evaluation index was compared and analyzed.

Estimation of Safety Zone of Tunnel due to Adjacent Structure (근접구조물에 의한 터널의 안전영역 평가)

  • Hwang, Taikjean
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.3052-3060
    • /
    • 2013
  • When planning to construct adjacent structure by the side tunnel, the criteria of safety zone of tunnel have been proposed. There are no specific theoretical basis regarding load conditions and the distance of structure and the geological strata and the conditions of adjacent structure's location, and the conditions applied load. Two and three dimensional numerical analysis preformed to prove the deformation of the ground and structures caused by the tunnel excavation and evaluated the correlation and the suitability of the tunnel's safety zone regarding the location of adjacent structures and the changes in the modulus of deformation. This paper proposed the safety zone's range is getting bigger as the modulus of deformation is higher. Also, it seems that the possible range of construction under constraints in the diagram of revalued safety zone significantly expands as shear failure line appears on the invert extension line below the spring line.

Development of a Prototype for an Earthwork BIM Environment (건설현장 굴착작업을 위한 토공 BIM 프로토타입 개발)

  • Moon, Sungwoo;Son, Jihong;Hong, Soonheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.707-714
    • /
    • 2015
  • The national government is pushing hard the adoption of the BIM (Building Information Modeling) technology in the construction industry. The BIM application provides a visualized environment where the construction manager can inspect the structure of buidling structures. The application also provides information on activity progresses as well as earned values. However, BIM is mostly applied to visualize a structural object with definite forms. The BIM technology needs to be extended to include an object with non-definite forms such as earthwork operations. The objective of this study is to present a prototype of earthwork BIM in the construction operation. The prototype has been built on the attributes of geological information, construction equipment and positioning. The prototype of earthwork BIM shows a 3D graphic simulation of construction equipment moving around for digging and loading.