Knowledge Acquisition and Application for Scheduling Expert System of Highrise Buildings (HRB Expert 구축을 위한 지식의 획득과 활용)

  • Hong Young-Tak;Yu Jung-Ho;Lim Gyeong-Ho;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.92-101
    • /
    • 2005
  • The duration of highrise building projects is more shorter than its increasing of the numbers of floors. The project is liable to overrun of the time in which the project must be complete. AS highrise buildings are increased, time management has been reorganized as critical success factor. To improve time management, time management softwares are introduced and the software's education is made lively in construction company. However a large amount of time management works still have been based on not the software but scheduler's experience. We often can find the time overrun risk of highrise building because of the shortage of scheduler's experience. To diminish the mistake of the scheduler who does not have much experience, we suggested HRB Expert which uses expert's knowledge to make the time plan of highrise building. We made an example of knowledge acquiring and knowledge usage which cased on reinforced concrete work of highrise building by literature review and interview with scheduling expert. The precision of time plan will be enhanced and time overrun will be prevented on condition that HRB Expert is constructed and used

Trend Analysis and Market Expansion Strategies for Overseas Civil and Architectural Projects (해외건설 토목 ${\cdot}$ 건축분야 수주패턴 분석 및 시장확대 전략에 관한 연구)

  • Choe, Seok-Jin;Kim, Du-Yeon;Han, Seung-Heon;Kim, Hyeong-Gwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.408-413
    • /
    • 2006
  • Recently, the economic trend of internal enterprises toward the world market appears to exceedingly associate with industrial plants. Such circumstance would limit the diversity of project items and cause various issues of extreme disproportion of overseas construction market at the same time. Consequently, it seems essential to inspect the present state of bookings in the civil engineering and construction fields including the service corps, regarding the former period (from the year 1990 to 1996), the depressed period (from 1997 to 2000), and the latter period of monetary crisis (from 2001 to July 2006), based on the critical situation in foreign exchange occurred in the late 1990's; also important to look into the shifts of the representative items in such fields by regional groups of principal nations throughout the world. Therefore, the current situation of bookings in overseas construction companies should be clarified, and ultimately, appropriate measures should be established.

  • PDF

A Study on Developing Smart Component through the Analysis on Architectural Scheduling and internal Material (건축공종 및 내부자재별 친환경평가 분석을 통한 Smart Component 개발에 관한 연구)

  • Kim, Jae-Won;Jeong, Byung-Woo;Kim, Sun-Seek;Lee, Sang-Hyo;Park, In-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.619-623
    • /
    • 2006
  • When it comes environmental preservation and economic development throughout all the industries, it is adopted to regulate carbon dioxide emissions in United Nations Framework Convention on Climate Change. And we must be responsible for promoting the eco-friendly and sustainable development because of a registration of the Kyoto protocol. Almost all the domestic buildings have many problems that not only waste the resources and architectural energy, but also are not enough to recycling of the waste. So m this study the environment-friendship is estimated through assuming carbon dioxide emissions. And after indicators are derived through surveying the residential satisfaction, it is carefully thought to develop the Smart Component that increase the length of life and the flexibility and improve the comfortable circumstance in buildings.

  • PDF

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation (BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구)

  • Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.3-10
    • /
    • 2011
  • Currently, technologies for industrialization and dissemination for Han-Ok are developed actively. Also BIM technologies are actively developed. However, it is difficult to find the research and study cases for construction method and process for Han-Ok. BIM is the technology for managing information with element as a unit for building design, construction and management, and it is closely related to Han-Ok using assembling method for building construction. We analyzed the basic construction processes for IK-Gong and MinDoRi house, typical types of Han-Ok. Also we developed the Work Breakdown Structure of construction process for Han-Ok and suggested the method for construction simulation using BIM. Simple BIM model of Han-Ok which is Ik-Gong type is used for case study. It was possible to link automatically between 3D elements objects and construction activities about 95% in the case study. More studies of construction method for various type of Han-Ok and rules for link between elements and construction activities are required for Industrialization and dissemination of Han-Ok.

A Study on the Process management Methodology of Spatial Database Standard Construction (공간데이터 표준구축공정의 관리방법론 연구)

  • Choi, Byoung-Gil;No, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.3
    • /
    • pp.331-345
    • /
    • 2009
  • This study aims to standardize the work classification system in spatial data. Up to now, a systematic standard for constructing process and quality management has not yet been established in Korea, thus, it is possible for the national budget to be wasted. The regulations related to constructing spatial data are also obscure, and absurd for feasible application to reality, which results in a lack of reliability of the quality of spatial data. This study was conducted by investigating and analyzing regulations related to spatial data quality and various literature, including studies on spatial data quality conducted by the NGII. And also, the study was conducted by investigating and analyzing the constructing processes and working methods of major firms that have experience in constructing a GIS for a local governing body. Based on the analyzed data, we standardized work classification and management methodology for control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction, digital orthophotomap.

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.

A Web-based Long-Term Repair Planning System for Apartment House (웹 기반의 공동주택 장기수선계획 시스템)

  • La Hyo-Shin;Kim Tae-Hee;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-500
    • /
    • 2001
  • After the completion of an apartment housing project, deterioration of building materials will commence over time. Building maintenance consists of short-time and long-term repair projects. A long-term repair plan for organized maintenance management should be developed and implemented to maintain the longevity of the building. When forming such a plan, one should carefully predict when each part of the building will need repairs and how often subsequent repairs of each part will occur. The plan should be based on these predictions. Many apartment buildings in Korea have poor long-term maintenance management plans. This is because many of these plans are developed as mere legal formalities rather than as serious attempts to maintain the longevity of buildings. In this study, the materials used in the construction of each part of an apartment building we selected are taken into account to predict when the repairs will be required and how frequently subsequent repairs will be required. Furthermore, We suggest a long-term maintenance management plan for elongation so that apartment house managers can use to periodically check, diagnose, and replace old or malfunctioning parts using a web-based maintenance calender.

  • PDF

A Development of Internet-based Image Management System for Collection of Construction Knowledge (건설 현장지식 수집을 위한 인터넷기반의 이미지관리 시스템 개발)

  • Chin Sangyoon;Shin Tae-Hong;Shin Dongwoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.129-136
    • /
    • 2001
  • Advances in new information technology enable practitioners at construction sites to capture image information on overall sites and various work results through digital cameras. Also more and more government agencies and clients are accepting construction site information in a digital format. This research developed an Internet-based construction image information management system for effective construction management and sharing information among project participants. This system named CiMS provides a way to store/search/share site image information by representing the information through the combination of work items, work areas, performing companies, captured dates and purposes. CiMS has been applied in a real construction project for system refinement and verification. It is expected that CiMS can improve the construction site photo management paradigm, and the contents of CiMS can be incorporated into the corporate knowledge database.

  • PDF

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.