• Title/Summary/Keyword: 공종

Search Result 319, Processing Time 0.023 seconds

A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification (조경공사 표준품셈 공종 개정에 관한 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.119-126
    • /
    • 2011
  • The standard unit manpower and material in landscape architectural construction was consist of a standard and universal work classification. However, these constructional methods have created a number of problems in utilizing and responding on a variety of recently-developed working methods such as new constructional skills and technologies. This research decided that presenting the amendments of work classification of a standard unit manpower and material in landscape architectural construction was very important, and investigated those work classifications which required these new amendments. First of all, assessment items were selected through the literature reviews and a preliminary survey. Then, these assessment items were surveyed to the total of 60 professional landscape architecture field. The results of this study were as follows; First, the utilization level of the a standard unit manpower and material in landscape architectural construction was highest in the area of work classification of planting unit manpower and material. Second, the work classifications that needed to be added were recognized as leveling the ground construction, landscape structure construction, paving construction, water facilities construction, and outdoor facilities construction. Third, in the field of the a standard unit manpower and material in landscape architectural construction, 66.7% of the respondents replied that some amendments were necessary, and those amendments needed work classifications were identified as work classification of planting unit manpower and material was gigantic plant, topiary tree, temporary planting, exchange dead tree, etc. In the area of digging out was gigantic plant and plastic tree were recognized. The survey respondents also answered that, in keeping and management work classifications some amendments in pruning waste were necessary, and in the fields of rubble masonry work classifications some improvements were required in rubble aperture planting unit manpower and material and sodding and herbaceous sowing was a realistic lawn size unit manpower and material was needed. Based on the results explained above, this study suggests that amendments for a standard unit manpower and material in landscape architectural construction are necessary, especially in the areas of planting size and quality of work classifications unit manpower and material and in the unit manpower and material that affects the quality of lands caping constructions.

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

A Development of Work Breakdown Structure and Link to Standard Estimation System for 3D Printing Building (건축물 3D 프린팅 공종분류체계 도출 및 표준품셈 연계방안 제시)

  • Ju, Ki-Beom;Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.702-708
    • /
    • 2018
  • 3D printing technology is attracting increasing attention as a key technology of the fourth industrial revolution that can change the production paradigm of existing industries. The introduction of construction 3D printing technology has been slower than other industries because of the characteristics of the construction field. On the other hand construction automation using 3D printing is required to reduce the production population, as well as improve productivity and safety. In this study, a construction 3D printing work breakdown structure and link method to a standard estimation system were developed as a preliminary preparation for introducing 3D printing to construction. Based on expert consultation on construction and 3D printing, a hypothetical scenario was developed based on existing construction 3D printing technology. According to the scenario, 16 kinds of works required for 3D printing construction work were derived. The existing work breakdown structure and standard estimation system were analyzed, and the 3D printing work was linked. 3D printing works that were the same as the existing breakdown structure were found, and non-existent works were added to the similar breakdown structure. These results are expected to be helpful for future 3D printing construction management and cost estimation. The actual standard estimation system through 3D printing work will need to be calculated.

Comparative Studies of Standard of Estimated Unit Manpower and Material of Landscape Architecture Construction in Korea and Japan (조경공사 표준품셈의 한·일간 비교 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.154-158
    • /
    • 2011
  • This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.

2006년 하반기 건설공사 실적공사비 적용 공종 및 단가

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.195
    • /
    • pp.38-48
    • /
    • 2006
  • 정부등 공공기관에서 시행하는 건설공사 예정가격 작성시 적용되는 2006년 하반기 실적공사비 적용대상 공종 및 단가 931개(기계설비 216, 건축 335, 토목 350)가 지난 8월 14일 공표되었다. 실적공사비 단가는 재료비, 노무비, 직접공사 경비가 포함된 공종별 단가를 계약단가에서 추출하여 유사공사의 예정가격 산정에 활용하는 방식으로 공공건설공사의 예정가격 작성시 적용되고 있다. 또한 실적공사비 단가는 공공건설공사의 설계조건이 유사한 공종을 대상으로 계약단가가 설계단가 대비 ±25% 범위 내의 단가로 2006년 하반기 실적단가 설계가 대비 평균 낙찰률이 70% 수준이다. 대부분의 공공기관에서 예정가격 작성시 적용하고 있는 실적공사비 단가는 종전의 표준품셈에 의한 예정가격 작성시보다 공사예정가격이 낮게 산정되고 있다. 따라서 설비건설업계도 이를 감안하여 반드시 적정공사비를 확보할 수 있는 금액으로 입찰에 참가해야 한다.

  • PDF

An Analysis of the Characteristics of Standard Work and Design Information on Estimating Environmental Loads of PSC Beam Bridge in the Design Phase (PSC Beam 교량의 설계단계 환경부하량 산정을 위한 공종 및 설계정보 특성 분석)

  • Yun, Won Gun;Ha, Ji Kwang;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.4
    • /
    • pp.705-716
    • /
    • 2017
  • As many environmental pollution problems have arisen, various studies related to the environmental evaluation have been carried out in the construction industry. However, there is no methodology for estimating the environmental load quickly for design alternatives of civil facilities in the design phase. This study aim to establish criteria of works information and designed parts which can efficiently estimate environmental loads of PSC beam bridge based on standard quantity at the early design phase. For this purpose, a detailed environmental loads database was constructed by performing Life Cycle Assessment (LCA) based on detailed design data of 25 bridges. In addition, major work with high impact on environmental load were selected, and the analysis of characteristics of environmental load according to the required materials and 8 impact categories were conducted. As a result, the superstructure accounted for 42.91%. In the superstructure, remicon of the material base and PSC beam work occupied 53.13% and 31.25%. In the substructure, remicon, rebar, and cement, which are material base, accounted for more than 93%. It is expected that this major work and material information for each part of bridge can be utilized in the construction of the model, which can estimate the approximate environmental load, reflecting the characteristics of the structure in the design phase.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

예산회계법시행령 개정령 공포 설비공사 분리발주 허용 부실요인 해소 및 양질시공 정착 기대

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.48
    • /
    • pp.33-43
    • /
    • 1994
  • 지난해 우리 협회와 부산시가 행정쇄신 과제중의 하나로 제안한 기계설비공사 분리발주가 행정 쇄신위원회에서 결정$\cdot$통과돼 6월30일 재무부가 예산회계법시행령을 개정, 발주기관이 기계설비공종을 건축에서 별도로 분리 발주할 수 있도록 함에 따라 일반건설업체로부터 저가에 하도급을 받아 공사를 하던 설비전문업체들은 관련공사를 원도급에 의한 적정 가격에 수주받을 수 있어 각종 기계설비 공종에 대한 품질향상이 기대된다.

  • PDF