Journal of the Korea Society of Computer and Information
/
v.24
no.10
/
pp.11-23
/
2019
This paper designs and proposes a file conversion process to IFC file, the international standard file format for BIM, in order to ensure mutual compatability and manageability among users of commercial BIM modeling and design softwares in the civil engineering area. The proposed process insert additional properties consisting of the properties of quantity calculation codes and properties of CBS/OBS/WBS standard classification scheme, to the three dimensional object shape information of the converted IFC files, using add-in converters for commercial BIM modeling softwares. In addition, a process of integrated use of IFC files for open web-based quantity, process(4D), and construction cost(5D) management is additionally designed and implemented. Based on these works, the ultimate goal of this study is to propose a novel process for integrated use of open web-based quantity, process(4D), and construction cost(5D), from the design stage of BIM modeling to the final construction stage in the civil engineering area.
Journal of the Korea Institute of Building Construction
/
v.20
no.6
/
pp.527-535
/
2020
This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.
Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
Land and Housing Review
/
v.10
no.3
/
pp.77-87
/
2019
In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.3D
/
pp.399-408
/
2009
The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.4D
/
pp.649-659
/
2006
Recently there has been huge efforts to improve performance in construction process by applying emerging techniques such as the Lean principle and Just-in-time concept. However, little achievement as we expected has come out in reality due to the lack of strategy to set a definite goal of the execution and differences of personal viewpoints on construction productivity. Accordingly, it is the most important to promote the circumstances for the construction process improvement by quantifying the goals of respective unit activity groups. This research explores feasible solutions for the improvement of construction projects performance by combining the six-sigma principle for the generic administrative innovation based on the idea of construction process performance. For this purpose, mutual comparisons of various current approaches are performed in an attempt to establish the advantages in applying six-sigma idea and to provide its fundamental strategy. Furthermore, through a case study with the simulation of applying six-sigma to a unit activity group in construction process, this paper verifies that the overall performance improves as the degree of sigma level gets advanced.
Korean Journal of Construction Engineering and Management
/
v.3
no.1
s.9
/
pp.91-96
/
2002
The purpose of this study is to present a systemized flow of temporary facility(TF) planning information. The current TF planning tends to be established by subjective decision making of field workers. Therefore TF planning needs more systemized information flow to provide a reliable schedule. The study was implemented through interview with experts for reliable TF planning. The main contents of the study are as follows; 1) TF planning process model(IDEF0) are established. 2) Various information flow diagrams proposed to support TF planning decision-making. The study recommends that, as a future research, the computer system be developed for application of the information flow.
Korean Journal of Construction Engineering and Management
/
v.15
no.6
/
pp.26-34
/
2014
Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.612-615
/
2004
Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.153-161
/
2004
The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.
Korean Journal of Construction Engineering and Management
/
v.22
no.6
/
pp.131-137
/
2021
Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.