Browse > Article
http://dx.doi.org/10.6106/KJCEM.2021.22.6.131

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad  

Yoon, Chang Geun (LOTTE Engineering&Construction)
Park, Su Yeul (Department of Railroad Convergence System, Korea National University of Transportation)
Kim, Seok (Department of Railroad Infrastructure System Engineering, Korea National University of Transportation)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.6, 2021 , pp. 131-137 More about this Journal
Abstract
Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.
Keywords
Track Exchange; Risk Reduction; Work Plan; Standard Work Process;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ahn, C.Y. (2006). "A Study on the Three-Dimensional Transfer of Railroad Tracks." MS thesis, Woosong Univ., Daejeon, Republic of Korea.
2 Ministry of Land, Infrastructure and Transport (MOLIT) (2013). Specialized Specifications for Railroad Construction (Track Edition), 2013-12.
3 Park, H.K., Park, D.H., Ahn, Y.H., Park, S.H., Han, S.W., and Heo, N.G. (2014). "A Study on the Enhancement Plans of Safety Management in Adjacent Line Open Working : Focused on Foreign Countries." Proceedings of the Korean Society for Railway Autumn Conference, Jeju, Republic of Korea.
4 Lee, S.Y., Song, B.H., Roh, N.J., Kim, I.S., and Kim, C.H. (2016). "Consideration about Accident Preventive Measurement and Accident Type Analysis at Adjacent Line Open Working." Proceedings of the Korean Society for Railway Autumn Conference, Jeju, Republic of Korea.
5 Korea Railroad Corporation (KORAIL) (2019). Status of Korea Railroad Corporation's First Class Equipment Retention, KORAIL Research Report, 2019.