A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.

A Study on A Computerized Input Data Model for A General -Purpose Project Management (교량공사를 중심으로 한 범용 프로젝트 관리를 위한 전산 입력 자료 모형 구축)

  • Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.19-31
    • /
    • 2016
  • The purpose of this study was to establish the initial computerized management database which can be applied to a universal project management computer system for managing universal project management and operation. Database construction model presented in this paper suggested the model of organization, activity and operation of bridge construction(two abutment-three-span) based on the organization information classification system of the facility classification, functional component classification, work classification, resource classification. Database model established in this study are considered to be able to take advantage of a very systematic and scientific management for future universal project management and operations.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

A New Perspectives on the Research of Domestic and Overseas Land Category System (국내외 지목체계 운용실태 연구에 관한 새로운 시각)

  • Ryu, Byoung-Chan
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.151-167
    • /
    • 2019
  • Korea's current Land Category Classification System(LCCS) can not accurately register of complex and diverse Status of land use in Cadastral Record. Therefore, in order to draw implications for the improvement of LCCS in Korea, Shin SW and four others published a paper titled 'A Study on Land Category System of Domestic and Foreign Country' in 2013. This paper compared the 'land category', 'land use' and 'land cover' of six countries on the same line, and Some non-factual content was described. So, presented a new perspective on this. Looking forward, I hope that reasonable alternative will be presented based on the understanding of LCCS of Germany, Japan and Taiwan. In the future research project, to study the history of LCCS in Germany and Taiwan and suggest to refer to improvement of LCCS of Korea.

Construction of Ontology for River GeoSpatial Information (하천공간정보의 온톨로지 구축방안 연구)

  • Shin, Hyung Jin;Shin, Seung Hee;Hwang, Eui Ho;Chae, Hyo Sok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.627-627
    • /
    • 2015
  • 기존 물관련 시스템들은 독자적인 DB 구조를 가지고 있고 검색 서비스는 자체 시스템의 DB를 직접 접근하여 사용자에게 결과를 제시하는 형식이다. 이러한 서비스의 단점은 사용자가 개별 시스템의 서비스에 대한 지식이 없으면 접근하기 어렵다는 점이다. 개별 시스템의 개별 서비스의 개념을 벗어나기 위하여 물관련 시스템에 있는 하천공간자료 검색 정보를 카탈로그 서버에 등록하고, 카탈로그 서버에 등록된 검색정보를 사용자가 검색하는 방식을 적용하고자 한다. 카탈로그 서버에 자료에 대한 정보를 등록할 때 자료의 정보를 어떻게 기술할 것인가의 문제가 발생한다. 개별 서버마다 등록하게 된다면 용어 및 문화에 의한 차이로 같은 개념을 다른 용어로 등록하게 되는 혼란이 발생할 소지가 있다. 예를 들어 강우자료에 대하여 "강우", "Precipitation", "Railfall", "비" 등으로 등록할 소지가 있다. 이러면 실제 자료가 존재하는 데도 등록 방법에 따라 자료의 검색이 어려워진다. 이러한 상황을 제어하기 위하여 검사어휘(Controlled Vocabulary)를 도입한다. 이는 포털의 운영자가 미리 용어의 개념과 용어의 분류체계를 설정하고 등록 자료의 검색어를 미리 설정하여 자료의 원천 소유자가 자료를 등록 시 검사어휘를 참고하여 등록하거나 또는 등록되지 않는 용어의 자료인 경우 이 용어를 포탈에 신규로 등록한다. 검색용어의 난립을 피하기 위하여 사용자의 신규등록은 포탈의 운영자가 어느 정도 제어할 필요가 있다. 검사어휘의 정립과 하천 관련된 분류체계는 하천공간정보 검색의 포탈을 위한 필수사항이다. 검사어휘의 정립의 주된 목적은 이질성의 극복이다. 이질성의 종류는 문법적 이질성, 데이터 형식과 구조 및 문맥적 이질성이 있다. 이 중에서 문맥적 이질성이 가장 넓고 어려운 문제이다. 단위는 분야마다 호칭이 다르고 채택하는 기준마다 다르다. 유사어는 전문용어라도 분야마다 다르다. 우리나라에서 서비스 인코딩시 국어와 영어를 어떻게 처리할 지에 대한 대책도 필요하다. 수문학의 시계열 자료를 다루는 CUAHSI/HIS의 온톨로지는 대 개념으로 물리학적, 화학적 및 생물학적인 분야로 분류하고 있다. 하천공간정보의 온톨로지 구축을 위해 데이터 분석 및 분류, 온톨로지 요소 설정, 온톨로지 데이터 테이블 작성, 클래스 생성 및 계층화, 클래스 계층화에 따른 속성 설정, 클래스에 적합한 개체 삽입, 논리 관계 확인 및 수정과 같은 과정으로 온톨로지 개발을 진행하고자 한다.

  • PDF

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF