Analysis of Monthly Excavation Length Depending on Ground Condition and TBM Diameter (터널 보링 머신 공법 구경별 지질조건에 따른 월굴진장 분석)

  • Choi, Jae Jin;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.141-150
    • /
    • 2014
  • This study analyzed monthly excavation length and amount of time occupied by the work item based on drilling reports to record the entire work process of TBM tunnel site. TBM equipment( ${\varnothing}2.6m$, ${\varnothing}3.0m$, ${\varnothing}3.5m$, ${\varnothing}3.8m$) was developed by WIRTH company in Germany. In addition, This study analyzed rising expected monthly excavation length based on the lowest loss rate of operating shifts among the field of nine. Analysis results are confident to be a useful tool when Planning and Managing TBM method construction to the primary planning steps in the field similar to geological conditions and analyzed geological conditions.

Development of Prediction Model of Frost Penetration Depth on Pavement in Korea (포장도로의 실측값을 활용한 한국형 동결깊이 예측모델 개발)

  • Hong, Seung-Seo;Kim, Young-Seok;Kim, Hak-Seung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.3
    • /
    • pp.47-56
    • /
    • 2010
  • Korea is known to have seasonal frozen ground during a winter season due to climatic and ground conditions. Temperatures below $0^{\circ}C$ cause pavement failure by frost heaving and thaw settlement. A frost protection layer has been constructed in pavements to avoid damage caused by frost action. Anti-frost design methods in Korea have been adopted, which is established in U.S. and Japan. However the characteristics of soils in Korea are different and there are no reasonable modifications to accommodate these characteristics. Therefore, adequate pavement design procedures including seasonal frost action, as well as construction and maintenance practices are required. In this paper, the frost penetration depths along national roads in Korea are presented based on field measurement over several years (1991~2010). The frost penetration depths are analyzed with respect to the Provinces of Korea and sunny/shaded areas.

  • PDF

Stability Analyses for Excavated Slopes Considering the Anisotropic Shear Strength of the Layered Compacted Ground (다짐지반에 조성되는 굴착사면의 비등방성 전단강도를 고려한 안정성 분석)

  • 이병식;윤요진
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.5
    • /
    • pp.27-35
    • /
    • 2002
  • To construct pipe lines, culverts, or other utility lines, temporary slopes formed by excavating the compacted embankment are frequently met with in the field. Ignoring stability analyses for such slopes and applying inappropriate slope inclinations often result in safety problems. In this study, stability of such slopes were investigated considering the influence of anisotropic shear strength of the layered compacted ground. A series of stability analyses were conducted for slopes varying the slope angle and the height, and assuming isotropic and anisotropic shear strength conditions, respectively. The anisotropic shear strength of the compacted soil was determined from the direct shear test for layered soil blocks varying the inclination angle between the horizontal shear surface and the direction of the soil layer. As a result of the analyses, it has been concluded that the appropriate slope inclination f3r a temporary slope could vary in accordance with the consideration of anisotropy. However, the factor of safety as well as the location of the failure surface did not show significant variation.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Cost Analysis of Asphalt Pavements Reinforced with Glass Fiber and Polymer Modified Using Falling Weight Deflectometer (Falling Weight Deflectometer를 이용한 섬유보강 아스팔트 및 폴리머 개질 아스팔트 포장의 비용 효과 분석)

  • Kim, Boo-Il;Lee, Moon-Sup;Jeon, Sung-Il;Kim, Sang-Kyu
    • International Journal of Highway Engineering
    • /
    • v.11 no.4
    • /
    • pp.153-160
    • /
    • 2009
  • Falling Weight Deflectometer (FWD) tests were performed to evaluate the structural capacity of glass fiber reinforced (GFR), polymer modified (PM), and unmodified asphalt pavement in Korea-LTPP (Long Term Pavement Performance) section. FWD tests showed that the tensile strains of GFR and PM asphalt pavements at the bottom of asphalt layer were 29% and 21% less than that of unmodified asphalt pavement. The structural capacity was then used as a performance criterion for calculating the cost effect of GFR and PM asphalt pavements. From the results, 5cm of asphalt layer thickness was reduced by applying GFR asphalt, and 3cm by applying PM asphalt. However, construction cost of PM and GFR asphalt pavement were increased due to the higher GFR and PM asphalt price. Life cycle cost analysis showed that the initial construction cost of GFR and PM asphalt pavement were higher but the management and user cost were less than those of unmodified asphalt pavement.

  • PDF

Development of testing apparatus and fundamental study for performance and cutting tool wear of EPB TBM in soft ground (토사지반 EPB TBM의 굴진성능 및 커팅툴 마모량에 관한 실험장비 개발 및 기초연구)

  • Kim, Dae-Young;Kang, Han-Byul;Shin, Young Jin;Jung, Jae-Hoon;Lee, Jae-won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.453-467
    • /
    • 2018
  • The excavation performance and the cutting tool wear prediction of shield TBM are very important issues for design and construction in TBM tunneling. For hard-rock TBMs, CSM and NTNU model have been widely used for prediction of disc cutter wear and penetration rate. But in case of soft-ground TBMs, the wear evaluation and the excavation performance have not been studied in details due to the complexity of the ground behavior and therefore few testing methods have been proposed. In this study, a new soil abrasion and penetration tester (SAPT) that simulates EPB TBM excavation process is introduced which overcomes the drawbacks of the previously developed soil abrasivity testers. Parametric tests for penetration rate, foam mixing ratio, foam concentration were conducted to evaluate influential parameters affecting TBM excavation and also ripper wear was measured in laboratory. The results of artificial soil specimen composed of 70% illite and 30% silica sand showed TBM additives such as foam play a key role in terms of excavation and tool wear.

Development of a new test method for the prediction of TBM disc cutters life (TBM 디스크 커터의 수명 예측 방법 개발)

  • Kim, Dae-Young;Farrokh, Ebrahim;Jung, Jae-Hoon;Lee, Jae-Won;Jee, Sung-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.475-488
    • /
    • 2017
  • Wear prediction of TBM disc cutters is a very important issue for hard rock TBMs as number of cutter head intervention. In this regard, some model such as NTNU, Gehring model, CSM models have been used to predict disc cutter wear and intervention interval. There are some deficiencies in these models. This paper developed a new test method for wear prediction for TBM disc cutter and proposed a new abrasion index. In this regard, different abrasivity indices along with their testing methods are explained. A comparative study is performed to develop the predictability of different cutter life evaluation methods and index. The evaluation of the new methods proposed in this paper shows a very good agreement with the actual cutter life and intervention interval length. The proposed tester and index can be easily used to predict the intervention interval length and cutter wear evaluation in both planning and construction stages of a TBM tunneling project.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

A study on the Construction of Seokjojeon Hall of Deoksugung Palace and the influx of Western Furniture, on the Daehan Empire (대한제국기 덕수궁 석조전 건립과 서양가구 유입)

  • Kim, Yun-hee
    • Korean Journal of Heritage: History & Science
    • /
    • v.47 no.3
    • /
    • pp.4-23
    • /
    • 2014
  • Seokjojeon Hall is the Neoclassic style building situated in Deoksugung Palace, which was proposed by John McLeavy Brown who was a chief commissioner of the Daehan Empire and designed by John Reginald Hardings in 1897. Construction of the Seokjojeon Hall began in 1900 and completed in 1910 at the total cost of one million won. Decorating and furnishing of the interior was designed by Lovell and all the furniture of Seokjojeon Hall had been purchased from Maple&Co. The Maple&Co was the supplier of luxury furnitures and decorating items for luxurious residentials, hotels, embassies and the palaces and its headquarter was located in London. Ready-made furnitures were purchased as shown in the Maple's catalog. The designs and styles of the west were applied to Seokjojeon Hall. That is one of the aspects showing Daehan Imperial underwent a period of Westernization.

A Study on the Estimation of Change Orders Impact for the Public Construction (공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구)

  • Lee, Min-Jae;Park, Bum-Jin;Im, Keon-Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.363-369
    • /
    • 2008
  • Change is inevitable and is a reality of construction projects. Change adjustment includes the cost associated with materials, labor, etc. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. What is needed is a reliable method to identify and quantify the loss of productivity caused by cumulative impact of change orders. This study survey the change orders data in domestic area for public construction and analyze to quantify change order impact. This study developed concepts of "%CO", "%Delta", "%T" to capture change order effect on project and search the relationships between them. Finally, this study find strong relationship between change order and loss.