• Title/Summary/Keyword: 공사비계획

Search Result 178, Processing Time 0.026 seconds

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

A tunnel construction cost estimation model using system dynamics (시스템 다이내믹스를 이용한 터널공사비 예측 모델 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2010.05a
    • /
    • pp.316-318
    • /
    • 2010
  • 도로건설에 있어 계획단계에서 초기공사비의 정확한 예측을 위해 아직 연구가 미흡한 터널공사비 예측 모델을 시스템 다이내믹스를 이용하여 개발함으로써 합리적인 터널공사비 예측을 위한 토대를 마련하여 올바른 의사결정을 돕고 예산 낭비를 방지하기 위함을 목적으로 하였다.

  • PDF

Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks - (공공건축물 계획단계에서의 용도별 공사비 예측에 관한 연구 - 육군 병영생활관을 대상으로 -)

  • Lee, Hyun-Soo;Jung, Myung-Jun;Park, Moon-Seo;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.3-13
    • /
    • 2010
  • The purpose of this research is to develop a conceptual model that establishes a new approach for functional area cost estimating in the schematic design phase. A cost estimating model should consider not only the estimate accuracy, but also the flexibility to the design alternatives and user-oriented serviceability. Therefore, this research uses the method that classifies various facilities of a building according to its functions by analyzing historical data. After setting the functional area as cost parameter, a formula which can estimate functional area cost is derived from statistical analysis. Finally, to validate the proposed conceptual model, it is applied to historical data of a military barrack project. It enables customized space planning reflecting client's needs and compares the cost of various design alternatives as well as improves estimate accuracy.

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

A Development for Construction Cost Prediction Model of Site Development Project (단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 -)

  • Lee Won-Yong;Lee Tai-Sik;Park Jong-Hyun;Bae Keon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.419-422
    • /
    • 2002
  • The features of modem construction industry can be summarized as specialization, complexity, and large-scale. Therefore, increasing uncertainty of construction project can not be effectively dealt with traditional method used for construction cost management. Cost overrun affects on successful execution of managing construction project in a negative way. Therefore, accurate estimation is a priori for effective cost management. First, this work analyzes the previous cost estimation model for the effective cost management. Then, a standard structure required for developing the cost estimation model for site development was presented. In addition, the cost estimation model which can be used in planning and design phases was introduced by analyzing real site development projects.

  • PDF

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

Development of Supporting tool for WBS-based cost (작업분류체계 기반 공사비 작성을 위한 지원도구 개발)

  • Yoon, Hoi-Su;Moon, Jin-Suk;Kim, Seong-Jin;Han, Chung-Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1430-1432
    • /
    • 2011
  • 공사비정보와 일정정보는 사업을 관리하는데 있어 매우 중요한 정보로 이들이 연계활용되어야 공정공사비 관리를 원활하게 진행할 수 있다. 그러나 국내의 실정은 공사비가 내역체계 기반으로 관리됨에 따라 설계사에서 작성되어 시설, 부위, 공간 등의 정보를 갖고 있던 수량정보가 내역체계 기반으로 전환되면서 정보들을 상실하고 시공사에서는 다시 물량분개라는 작업을 통해 다시 시설, 부위, 공간 등의 정보를 부여하는 작업이 발생하고 있다. 이에 도로분야 사업을 대상으로 작업분류체계(WBS)를 그 연계방안으로 제시하고 작업분류체계 기반 공사비 작성을 통해 설계사에서 작성된 정보를 시공사에서까지 활용할 수 있도록 하고자 한다. 본 사업에서는 이러한 작업분류체계 공사비 작성을 위한 지원도구 개발을 위해 업무 프로세스 검토, 지원도구 활용 공사비 작성, 시험적용을 통한 지원도구 검증을 수행할 계획이다. 이를 통해 내역정보와 공정정보의 연계가 실현되고, 효율적인 공사비 관리의 기반을 제공할 수 있다.

시설공사가격관리자료

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.6 s.195
    • /
    • pp.83-87
    • /
    • 1985
  • 본 시설공사 가격관리 자료는 '84년도 조달청 시설국이 발주한 공사중 표준가격으로 활용할 수 있는 수준의 건축공사를 발췌하여 이를 비목별,공종별 단위당 공사비와 건물유형별로 중요자재 소요량 및 소요품수 등을 분석한 것입니다. 따라서 회원 여러분께서 본 자료를 잘 활용하면 건물종류별로 우리 실정에 알맞는 표준 건축물의 기준 자료로 이용할 수 있으며 또한 건축물의 과도한 고급화를 억제하여 예산을 절감하는 등 공사비 단가 간접통제 수단이 될 수도 있을 것입니다. 공사집행부서는 본 자료를 시설공사 계획 단계부터 발주, 시공 과정에 이르기까지 관리자료로 활용하시기 바라며 조달청에서는 본 자료를 각 수요기관이 계약요청하는 공사에 대하여 공사비 단가를 비교 평가하는 자료로 활용할 것입니다.

  • PDF