• Title/Summary/Keyword: 공사내역서

Search Result 61, Processing Time 0.027 seconds

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

A Study on the Peculiarity of Construction Work for Architectural Properties during $1910{sim}1965$ ($1910{sim}1965$ 건조물문화재 보수공사의 시공특징에 관한 연구)

  • Kim, Jae-Kuck
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.77-99
    • /
    • 2006
  • This study is on the construction work of Preservation for Korean architectural properties during the period of japan invader. Korea lost their preservation ability of architectural properties when went through specific background from 1910 to 1945, which was the period of japan invader. Through this situation japan had to face the preservation of architectural properties for japan and korea. After 1945, korea has preserved the architectural properties over 50's years and which accomplishment every yew. Also, there are some architectural properties which registered in world heritages. However, the study of this period is not studied enough. Especially a construction work for architectural properties during this period is not become known. Therefore, the purpose of this study is for three. First is to analyze construction work data(a specifications and etc.) for accessing originality of korea architectural properties. Second is to understand about the construction works of preservation for the korean architectural properties. and the last is to compare the peculiarities of construction work of Preservation for korean architectural properties between during 1910-1945 and 1945-1965.

  • PDF

Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

Evaluation on the Possibility of Connection Between IFC and Digital Quantity DataBase Exchange Standard (IFC와 디지털 수량산출정보 교환표준의 연계 가능성 평가)

  • Won, Ji-Sun;Moon, Jin-Seok;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6488-6494
    • /
    • 2013
  • Recently, BIM has attracted attention as a technology to improve the construction productivity. The BIM standards to be applied to the BIM project are necessary for using or connecting the current 2D-based drawing standards. To develop the standard for BIM-based QTO and cost, this paper focused on using QDBEx, which was applied to road project cost management and connecting QDBEx with IFC, which is the BIM data delivery format. The IFC schema was evaluated to determine if it is possible to use the converts to the QDBEx XML file. As a result, 66% of the whole was available to connect directly, and 17% was available to connect through the processing of instance. The remaining 17% was evaluated to determine if it was available to connect. In the future, improvements in the schema will be suggested based on these results.

A Development of Design Document's DTD in Construction Project (건설분야에서의 설계문서 DTD 개발)

  • Jeong, Seong-Yun;Kim, Jin-Uk;Ok, Hyun;Kim, Seong-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.11c
    • /
    • pp.1469-1472
    • /
    • 2003
  • 본 연구는 도로, 하천, 댐 등 시설물 건설공사를 설계하는 과정에서 생성되는 각종 보고서, 계산서, 내역서 등의 설계문서를 단순하게 전자화하지 않고 정해진 구성체계와 항목에 따라 전자화 할 수 있도록 전자문서 표준체계를 정립하고자 DTD를 개발하였다. 아울러, XML을 기반으로 설계문서를 전자문서화하기 위한 개발 절차와 방법을 마련하였으며 건설분야에 설계문서 DTD를 적용하기 위한 방안을 제시하고자 하였다.

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

The Research on Development of Road Cost Index Using Each Representative Item of Expenditure (비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구)

  • Chun, Jin Yong;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.105-113
    • /
    • 2006
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust the contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for modulation of construction contract cost due to fluctuation of prices. However the method for making cost index had some problems in calculating cost index of each expenditure item that could not properly reflect the change of construction cost. To supplement these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes the method for making cost index that utilizes representative items of labor, material, equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent studies. By using this method, it is expected to solve the problems which were not reflected in preceeding studies.

Securement Method of proper actual unit cost by historical construction costs in the electrical construction works (전기공사 실적공사비 적정 실적단가의 확보 방안 연구)

  • Kim, Gwang-Gon;Choi, Seung-Dong;Park, Min-Young;Hyun, So-Young
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2120-2121
    • /
    • 2011
  • 현재 정부가 추진하고 있는 전기분야 실적공사비 적산제도와 관련된 최근의 움직임은 당초의 취지와 달리 실적공사비에 대한 개념 부족과 임의적 해석 등으로 실적공사비 적산제도 도입의 바람직한 방향성에도 불구하고, 실적단가 축적의 기초 자료인 계약내역서의 직접 공사비 낙찰률 적용 관계 등 실적단가의 적정성에 대한에 근본적인 접근보다 예산절감, 물가안정 측면으로 접근하여 시장단가 반영에 대한 왜곡현상이 발생 할 수 있는 제도상의 문제점으로 실적단가 축적에 대한 적정성 판단에 따른 실적단가의 보정 수단이 미약하여, 현행 법제도 하에서 실적단가의 적정성 확보를 위한 대응 방안을 제시하여 실적공사비를 정착시킬 필요가 있다. 왜냐하면 품셈에 의한 문제점 등으로 실적공사비 적산제도로 공공 건설공사의 예정가격산정 방식을 전환 하였다고 볼 때, 본 제도의 실패는 또 다른 제도로의 전환 또는 보완이 필요하다고 판단된다.

  • PDF