An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

The Prediction of the Apartment Construction Project Cashflow with Changing Sales Point (분양시기 변동에 따른 공동주택 건설공사 현금흐름 예측)

  • Bae Jun-Ho;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.234-237
    • /
    • 2003
  • The Korean housing supply have been provided by the Pre-construction sales system. The Pre-construction sales system contributed to large housing supply. But it followed by the market anomaly. Along the housing market is changing to tile market for consumers, it requires new policy and regulations. This market changes and needs to modify the policy make a discussion about introducing the Post-construction sales system. it concerns to change the time to sale. This paper analyzes the present feasibility study and makes a tool to predict construction cashflow considering changed sales point. The sales timing leads to decide the amount of financial costs in the construction project and that cost affects to the feasibility. The accurate cashflow prediction is required for a successful apartment construction delivery.

  • PDF

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

A Study on the Influence of the Characteristics of Planning on the Cost of Apartment (공동주택의 계획특성이 분양원가에 미치는 영향에 대한 분석)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.89-99
    • /
    • 2006
  • Usually feasibility analysis in a narrow sense is a economic analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. Many studies have been executed in qualitative element which include decision-making process or prediction of housing market. But it is difficult to find economic analysis related to characteristics of planning. In this study, floor area ratio, selling area ratio and term of works are adopted as the Characteristics of Planning. So, the purpose of this study is to analyze the Influence of the characteristics of planning on the cost of apartment by means of multiple regression analysis and what-if method.

A Study on Implementation Method of DataBase of Energy Saving Construction Materials (에너지 저감형 건축 자재의 DB 구축 방안 연구)

  • Yang, Dong-Suk;Lee, Do-Heon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.05a
    • /
    • pp.1034-1037
    • /
    • 2013
  • 건축물에서 사용되는 에너지 저감을 위한 노력이 활발히 진행되고 있는 가운데 공동주택 건설시 에너지 저감형 자재를 활용하는 것이 국내 에너지 소비량을 줄이는데 효과적이다. 하지만, 에너지 저감형 자재에 대한 성능 검토 및 시공관련 자료들이 체계화되어 있지 못해 설계 및 시공 시 어려움을 겪고 있다. 이에 따라, 본 연구에서는 공동주택 에너지 저감형 자재의 재료적 특성, 상세도, 시방서 등 설계에서 시공에 이르는 자료들을 DB로 구축하기 위해 효과적인 방안들을 제시하였다.

Development of DL-MCS Hybrid Expert System for Automatic Estimation of Apartment Remodeling (공동주택 리모델링 자동견적을 위한 DL-MCS Hybrid Expert System 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.113-124
    • /
    • 2020
  • Social movements to improve the performance of buildings through remodeling of aging apartment houses are being captured. To this end, the remodeling construction cost analysis, structural analysis, and political institutional review have been conducted to suggest ways to activate the remodeling. However, although the method of analyzing construction cost for remodeling apartment houses is currently being proposed for research purposes, there are limitations in practical application possibilities. Specifically, In order to be used practically, it is applicable to cases that have already been completed or in progress, but cases that will occur in the future are also used for construction cost analysis, so the sustainability of the analysis method is lacking. For the purpose of this, we would like to suggest an automated estimating method. For the sustainability of construction cost estimates, Deep-Learning was introduced in the estimating procedure. Specifically, a method for automatically finding the relationship between design elements, work types, and cost increase factors that can occur in apartment remodeling was presented. In addition, Monte Carlo Simulation was included in the estimation procedure to compensate for the lack of uncertainty, which is the inherent limitation of the Deep Learning-based estimation. In order to present higher accuracy as cases are accumulated, a method of calculating higher accuracy by comparing the estimate result with the existing accumulated data was also suggested. In order to validate the sustainability of the automated estimates proposed in this study, 13 cases of learning procedures and an additional 2 cases of cumulative procedures were performed. As a result, a new construction cost estimating procedure was automatically presented that reflects the characteristics of the two additional projects. In this study, the method of estimate estimate was used using 15 cases, If the cases are accumulated and reflected, the effect of this study is expected to increase.