Development of a system for Project Quality Plan in Connection with Schedule D/B (공정D/B 연계를 통한 품질계획서 운영시스템 개발)

  • Moon Jin-Young;Kim Kyung-Rai;Kim Yea-sang;Chin Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.444-449
    • /
    • 2001
  • Because of preferential treatment in PQ judgement, many construction company got the certification of ISO 9000. But the main objective of them was just certification itself. The ISO 9000 certification which was composed of 20 requirements was a standard just for the manufacturing industry, so it was difficult that it was applied to a business of construction industry. In these reasons, they have revised ISO 9000:l994 which was composed or 20 requirements to ISO 9000:2000 which requests to focus on business process. In this research, we'll develop a System for Project Quality Plan that is related with information of site process in an apartment housing project. This system is intended to increase use of project quality plan in construction sites based on the construction process.

  • PDF

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Financial Analysis Model Development by Applying Optimization Method in Residential Officetel (최적화 기법을 활용한 주거용 오피스텔 수지분석 모델 개발)

  • Jang, Jun-Ho;Ha, Sun-Geun;Son, Ki-Young;Son, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.67-76
    • /
    • 2019
  • The domestic construction industry is changing according to its preference for demand and supply along with urbanization and economic development. Accordingly, initial risk assessments is more important than before. In particular, demand for lease-based investment products such as commercial and office buildings has surged as a substitute for financial products due to low interest rates of banks. Therefore, the objective is to suggest a basic study on financial analysis model development by applying optimization method in residential officetel. To achieve the objective, first, the previous studies are investigated. Second, the causal loop diagram is structured based on the collected data. Third, the system dynamics method is used to develop cost-income simulation and optimization model sequentially. Finally, the developed model was verifed through analyzing a case project. In the future, the proposed model can be helpful whether or not conduct execution of an officetel development project to the decision makers.

Productivity Analysis of Reinforced Concrete Works and Tower Crane Working Ratio for High-rise Apartment Buildings (초고층 공동주택 RC 공사의 생산성 및 타워크레인 가동율 분석)

  • Kwon, Jihun;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.55-62
    • /
    • 2021
  • The productivity of rebar-work and form-work was analyzed with data collected from an actual high-rise construction project, and the actual utilization rates of three tower cranes were also investigated. It was found that the average productivity of the form-work increased from 12.00~8.71(㎡/man·day) in the underground and above-ground/lower-floor to 11.94~20.73(㎡/man·day) in the standard floor. Comparing the productivity of core area to outer, the former was found to be about 11% higher. Moreover, the rebar-work productivity of the outer area(1.12 ton/man·day) was approximately 9.6% higher than that of the core area for the standard floor. The average utilization rates of three TC were surveyed to be about 63.49%, and it was revealed that rainy weather(6.1%), strong winds(6.1%), holidays(17.8%), TC lifting work(5.8%), and other failures and repairs(0.07%) were the causes of non-operation. These research results are expected to be beneficial data in planning and managing the process of high-rise RC construction works in the future.

A Study on the Relationship between Dwelling Environment and Household Density in Multi-Family Housing Development (공동주택단지 건설에 있어서 주거환경과 가구밀도에 관한 연구 -택지개발사업지구를 중심으로-)

  • 한상훈
    • Journal of the Korean housing association
    • /
    • v.9 no.2
    • /
    • pp.33-41
    • /
    • 1998
  • To accomodate increasing housing shortage in many cities, Korean Government has implemented various residental land development projects to provide more land for new housing construction. Most of the residential areas developed by these projects were used for multi-family housing units. Under this process, the size and location of the neighborhood service facilities in the development area were regulated by uniform standards. For this reason, the neighborhood service facilities were not able to be provided according to the household density but provided in minimum status required by these standards. Based on these considerations, this study aimed to evaluated residential land development project conducted by pubilc authority, one of the residential land development projects in Korea. Results of the case studies confirmed findings from literature review and proposed that existing regulations applied to these projects need to be amended not only to accomodata unique situation of each development area but also to enhance level of the dwelling environment. As ways to resolve these problems, this study suggests followings: (1) more flexible operation of the regulations, (2) inclusion of the socio-economic characteristics of the perspective resident in planning process, and (3) introduction of design techniques in the project. Finally, this study proposed future study directions in relation to this issue.

  • PDF

A Study on the Development for Prediction Model of Blasting Noise and Vibration During Construction in Urban Area (도시지역 공사 시 발파 소음·진동 예측식 개발에 관한 연구)

  • Jinuk Kwon;Naehyun Lee;Jeongha Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.33 no.2
    • /
    • pp.84-98
    • /
    • 2024
  • This study proposed a prediction equation for the estimation of blasting vibaration and blasting noise, utilizing 320 datasets for the blasting vibration and blasting noise acquired during urban blasting works in the Incheon, Suwon, Wonju, and Yangsan regions. The proposed blasting vibration prediction equation, derived from regression analysis, indicated correlation coefficients of 0.879 and 0.890 for SRSD and CRSD, respectively, with an R2 value exceeding 0.7. In the case of the blasting noise prediction equation, stepwise regression analysis yielded a correlation coefficient of 0.911 between the prediction values and real measurements for the blasting nosie, and further analysis to determine the constant value revealed a correlation coefficient of 0.881, with an R2 value also exceeding 0.7. These results suggest the feasibility of applying the proposed prediction equations when environmental impact assessments or education environment evaluation according to urban development or apartment construction projects is performed.

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.

A Study of Establishing the Plan of Lodging for the Workers of Gaesung Industrial Complex (개성공단 근로자 기숙사 건립 계획 연구)

  • Choi, Sang-Hee;Kim, Doo-Hwan;Kim, Sang-Yeon;Choi, Eun-Hee
    • Land and Housing Review
    • /
    • v.6 no.2
    • /
    • pp.67-77
    • /
    • 2015
  • Now that it is the current situation that the smooth supply and demand are necessary for 2nd phase of beginning construction and stable development of Gaesung Industrial Complex, this study was willing to offer the planning criteria and model to establish the lodging for the workers in Gaesung Industrial Complex based on the agreement that both South and North Korea agreed in 2007. Regarding the plan, its standard and the alternative were reviewed considering welfare of workers, economic efficiency, technical validity, possibility of agreement and long-term development. The exclusive area per capita was calculated through Labor Standards Act of Korea and status survey of lodging for the workers provided to border line area between China and North Korea and the economic alternative based on one room for 6 persons with the public restroom was compared with that of development type based on one room for 4 persons with indoor restroom. Especially regarding the proposed site, the area with the optimized position was set by considering gradient, accessibility and convenience of development out of the area of Dongchang-ri where was agreed already and the priority of the proposed site that can keep the existing building site and provide was offered. The necessary period for whole construction was set as approximately 36 months. Regarding construction method, RC Rahmen method was selected as the optimized alternative considering the workmanship of manpower of North Korea and conditions of supply and demand of materials and cluster-type vehicle allocation plan based on 4~6 units considering the efficiency of supplying service facilities and convenient facilities along the simultaneous accommodation of 15,000 people was offered. It was analyzed that total business expenses of approximately 80~100 billion Korean Won would required though there were the difference for each alternative in the charged rental way that the development business owner develops by lending the inter-Korea Cooperation Fund and withdraws the rent by the benefit principle. The possibility of withdrawing the rent was analyzed assuming that the period of withdrawing the investment is 30 years. Especially for the operation management after moving, the establishment of the committee of operating the lodging for the workers of Gaesung Industrial Complex (tentative name) was offered with the dualized governance that the constructor takes charge of operational management, collecting fees and management of infrastructure and human resource management is delegated to North Korea.

The Analysis of Change Factors and Improvement of the Planning techniques on the Number of Floor in Multi Housing Complex Planning -Focus on Planning Index- (공동주택 층수계획 변화요인 분석과 계획기법 개선에 관한 연구 -계획지표를 중심으로-)

  • Cho, Sung-Hak
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.428-437
    • /
    • 2017
  • Recently, local government has established a development strategy which takes into account the quality of each area, in order to solve the problems posed by poor development, hindrance of the urban landscape, the limits imposed by relevant laws, etc. However, the number of floors is an important factor which determines the urban landscape, planning density and quality of the external space. This planning factor has a very different effect according to the terrestrial circumstances, number of households, underparking ratio, green space ratio and floor area ratio. Therefore, in this study, a case analysis and case study are conducted and the correlation between each index is clarified. The conclusions of this study are follows. Firstly, flexibility should be ensured by taking into consideration the density indicators, average number of floors, and residential environmental performance measures in related laws and systems. Secondly, it is necessary to develop a wide-area planning method that extends the planning concept from the beginning of planning to neighboring blocks or cities. Thirdly, deregulation measures should be implemented, such as establishing specialized strategies for each region, and regulatory measures for encouraging different types of development.