Browse > Article
http://dx.doi.org/10.5345/JKIBC.2019.19.1.067

Financial Analysis Model Development by Applying Optimization Method in Residential Officetel  

Jang, Jun-Ho (School of Architectural Engineering, University of Ulsan)
Ha, Sun-Geun (School of Architectural Engineering, University of Ulsan)
Son, Ki-Young (School of Architectural Engineering, University of Ulsan)
Son, Seung-Hyun (Department of Architectural Engineering, Kyung Hee University)
Publication Information
Journal of the Korea Institute of Building Construction / v.19, no.1, 2019 , pp. 67-76 More about this Journal
Abstract
The domestic construction industry is changing according to its preference for demand and supply along with urbanization and economic development. Accordingly, initial risk assessments is more important than before. In particular, demand for lease-based investment products such as commercial and office buildings has surged as a substitute for financial products due to low interest rates of banks. Therefore, the objective is to suggest a basic study on financial analysis model development by applying optimization method in residential officetel. To achieve the objective, first, the previous studies are investigated. Second, the causal loop diagram is structured based on the collected data. Third, the system dynamics method is used to develop cost-income simulation and optimization model sequentially. Finally, the developed model was verifed through analyzing a case project. In the future, the proposed model can be helpful whether or not conduct execution of an officetel development project to the decision makers.
Keywords
officetel; risk analysis; system dynamics; monte-carlo simulation; causal loop diagram;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Chun HJ. An empirical study on the decision factors of the sale price of officetel. Journal of Residential Environment Institute of Korea. 2015 Sep;13(3):1-10
2 Jeon JM. A study on the price determinants of officetel : focusing in youngdeungpo-gu [master's thesis]. [Seoul(Korea)]: Yeonsei University; 2015. 70 p.
3 Peleskei CA, Dorca V, Munteanu RA, Munteanu R. Risk consideration and cost estimation in construction projects using monte carlo simulation. Management. 2015 Jun;10(2):163-76.
4 Sameh M. El-Sayegh, Mahmoud H. Mansour. Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering. 2015 Nov;31(6):04015004-1-10.   DOI
5 Cho YC. A study on the determinants of decision making for officetel development project [Ph.D. thesis]. [Seoul (Korea)]: Jeon-Ju Unversity; 2015. 164 p.
6 Sternman, JD. Business dynamics: systems thinking for a complex world. California Management Review. 2001 Jun;(43)(4):8-25.   DOI
7 Lee YT, Kim SB, Won JM. Risk analysis of highway invest by private sectors. Journal of Korean Society of Transportation. 1999 Dec;17(5):33-42.
8 Lee HS, Kim HS, Park MS, Lee KP, Lee SB. Construction risk assessment methodology using site risk influence factors. Journal of Korea Institute of Construction Engineering and Management. 2009 Nov;10(6):117-26.
9 Jin ZX. Stochastic hybrid cost prediction model of construction project in early stage [master's thesis]. [Seoul(Korea)]: University of Seoul; 2014. 105 p.
10 Grant-Muller S.M, Mackie. P, Nellthorp. J, Pearman A. Economic appraisal of european transport projects: The state of the art revisited. Transport Reviews. 2010 Nov;21(2):237-61.   DOI
11 Haezendonck E. Transport project evaluation: extending the social cost: Benefit approach. Maritime Economics & Logistics. 2008 Sep;10(3):322-4.   DOI
12 Lee GS. An study on analysis of risk factor for developing officetel [master's thesis]. [Seoul(Korea)]: Hanyang University; 2017. 88 p.
13 Sin DH. A risk analysis model for apartment building project [master's thesis]. [Seoul(Korea)]: Kyung Hee University; 2012. 155 p.
14 Son SH. A simulation model for feasibility analysis of apartment building projects using system dynamics [master's thesis]. [Seoul(Korea)]. Kyung Hee University; 2018. 68 p.
15 Vickerman R. Evaluation methodologies for transport projects in the united kingdom. Transport Policy. 2000 Jan;7(1):7-16.   DOI
16 Yu YJ. A risk quantification study for accident causes on building construction site by applying probabilistic forecast concept. Journal of the Architectural Institute of Korea. 2017 Jun;17(3):287-91.
17 Park KY. Development of financial feasibility analysis model using stochastic system dynamics method in hotel development project [Ph.D. thesis]. [Seoul(Korea)]: Hanyang University; 2012. 177 p.
18 Park JY. A system development for risk management of apartment building projects using system dynamics [master's thesis]. [Seoul(Korea)]. Kyung Hee University; 2018. 126 p.
19 Kim KW. Development of a system dynamics model for cost analysis of housing development projects. Journal of the Architectural Institute of Korea. 2011 Mar;17(3):287-91.
20 Hong JH. Risk-based feasibility study of residential building projects [Ph.D. thesis]. [Seoul(Korea)]: Chonnam National University; 2010. 190 p.
21 Park JB. Feasibility analysis model study of realestate development : focused on construction project development of apartment and stores [master's thesis]. [Seoul(Korea)]: Yonsei University; 2008. 64 p.
22 Son KY. A model for feasibility analysis of commercial buildings [master's thesis]. [Seoul(Korea)]: Kyung Hee University; 2007. 71 p.
23 Yu YJ. Risk analysis using construction insurance claim payouts. Journal of the Architectural Institute of Korea. 2016 Aug;16(4):349-57.