A Case Study on Risk Analysis of Large Construction Projects (대형건설공사의 리스크 분석에 관한 사례적용연구)

  • Kang In-Seok;Kim Chang-Hak;Son Chang-Baek;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.98-108
    • /
    • 2001
  • This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

A Study on the Estimation of Change Orders Impact for the Public Construction (공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구)

  • Lee, Min-Jae;Park, Bum-Jin;Im, Keon-Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.363-369
    • /
    • 2008
  • Change is inevitable and is a reality of construction projects. Change adjustment includes the cost associated with materials, labor, etc. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. What is needed is a reliable method to identify and quantify the loss of productivity caused by cumulative impact of change orders. This study survey the change orders data in domestic area for public construction and analyze to quantify change order impact. This study developed concepts of "%CO", "%Delta", "%T" to capture change order effect on project and search the relationships between them. Finally, this study find strong relationship between change order and loss.

A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction (철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구)

  • Chae, Su Min;Lee, Sang Hyuck;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.601-608
    • /
    • 2021
  • Recently, despite a decrease in the number of working days and an increase in the number of non-working days due to an increase in the abnormal climate and the revision of the Labor Standards Act, a standard construction period reflecting this has not been established. For this reason, even if the appropriate construction period is calculated at the site, there is a situation where delays occur due to unexpected circumstances. Therefore, this study proposes a method of calculating the number of non-working days for railway bridgework construction that reflects changes in construction conditions and climate change and reflects this to railway bridgework construction, and the number of working days was calculated. As a result, the number of non-working days by region and month in Korea was derived, and through this, the necessity of regulations and standards for appropriate construction periods reflecting regional characteristics and characteristics of each construction type was presented.

Development of Plastic Panel for Under Ground Wall (시공이 편리한 지하실 마감재용 플라스틱 내벽체 개발)

  • Han, Doo-Hee
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.05b
    • /
    • pp.1086-1088
    • /
    • 2010
  • 본 연구는 지하 구조물의 내벽에서 발생하는 습윤(濕潤) 및 결로를 방지하는 내벽체에 관한 것으로, 사방으로 연결조립 가능한 벽체판넬의 한쪽을 수직 지지프레임에 끼움 조립한 상태에서 타카핀으로 벽체판넬 및 수직 지지프레임을 동시 관통하여 내벽에 고정한 후 상기 수직프레임에 다른 벽체판넬의 일측을 중첩되게 조립하는 방법으로 지하 구조물에 내벽체를 편리하게 시공할 뿐만 아니라 공기를 단축하며, 상기 내벽체의 구성부품이 매우 간소하면서 가격이 저렴하여 공사비를 대폭 절감할 수 있는 시공이 편리한 지하 구조물용 내벽체의 개발에 관한 것이다.

  • PDF

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

Improvement of Positioning Accuracy using Site Calibration and Monitoring System of GPS (GPS의 현장 Calibration과 Monitoring System을 이용한 위치결정 정확도 향상)

  • Ahn Won-Tae;Moon Young-Hyun;Choi Seok-Keun;Lee Jae-Kee
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.21-26
    • /
    • 2006
  • 기존 해상구조물의 위치결정은 조류나 바람, 안개, 비, 눈, 일조시간 등의 기상조건으로 인한 장해요인과 지상 기준점 좌표값을 쉽게 이용하기가 곤란하기 때문에 정확한 위치결정을 할 수 있는 기법이 필요하다. 기존의 측량방법은 해상의 가설측량대 설치 및 철거에 따른 시간과 예산이 소요되고, 기상조건에 따라 시준이 불가능하여 작업 중단과 공기가 지연되며, 시준오차와 자료 오기오차 등이 발생하는 문제점을 가지고 있다. 본 연구에서는 GPS측량방법을 이용하여 현장 Calibration을 수행하여 위치정확도를 향상시키고, 해상에서의 기상조건에 따른 문제점과 상시 Monitoring에 의한 자동제어시스템을 개발함으로써 측량 정확도 향상과 해상구조물 공사기간 단축, 공사비 절감 등의 효과를 가져 올 수 있도록 하였다.

  • PDF

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective (장기적 관점에서의 모듈러 주택 공사비 절감기회 분석)

  • Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.124-134
    • /
    • 2018
  • Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.

A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site (E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.737-743
    • /
    • 2009
  • Shield TBM, since it was employed for Suyoungman Bay riverbed tunnel of Busan Subway in 2000,has been increasingly adopted in Korea, and in line with growing popularity, the study on Shield TBM has been expanded. However the studies mostly focus on ground condition in a bid to estimate the advancement rate and develop the model for calculating the excavation efficiency, whereas the efforts to analyze the cause of delay and to develop the improvement measures have been neglected. Thus the studies were mostly intended to analyze the schedule slippage focusing on ground conditions, while the study on schedule behind due to equipment itself and related facilities have yet to be attempted in earnest. This study hence was aimed at evaluating the troubles and schedule slippage caused by mechanical elements such as shield TBM equipment and tools and ground conditions, making use of FMEA approach so as to analyze the risk of schedule delay by such elements, thereby proposing the preventive measures to deal with high-risk factors. So, this study suggest the solution to highly ranked trouble factor for the purpose of enhance the efficiency on Shield TBM.

A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects (건설프로젝트의 품질결함의 발생요인간 상관분석)

  • Chi, Sungjoon;Cha, Yongwoon;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.21-28
    • /
    • 2015
  • Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.