Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea (국내 건설공사의 기후조건에 의한 작업불능일 예측방법 개선)

  • Lee, Keun-Hyo;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.100-108
    • /
    • 2006
  • Non-working days affected by weather conditions of the construction-sites have been estimated without proper data. They are usually estimated based on project engineer's own experience and intuition. As a result, they cause not only economic loss to time-adjustment but also conflicts among project participants. It becomes more difficult to predict the weather nowadays than before due to tendency of recently weather change. Therefore, this paper presents an improved estimation method for non-working days, which could minimize estimation errors. The estimation method is developed based on analysis of regional characteristics and weather conditions which affect project duration.

Preliminary Scheduling Based on Historical and Experience Data for Airport Project (초기 기획단계의 실적 및 경험자료 기반 공항사업 기준공기 산정체계)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Sungrae;Lee, Ikhaeng;Lee, Changweon;Jeong, Jinhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.26-37
    • /
    • 2017
  • Preliminary scheduling at the initial stage of planning phase is usually performed with limited information and details. Therefore, the reliability and accuracy of preliminary scheduling is affected by personal experiences and skills of the schedule planners, and it requires enormous managerial effort (or workload). Reusing of historical data of the similar projects is important for efficient preliminary scheduling. However, understanding the structure of historical data and applying them to a new project requires a great deal of experience and knowledge. In this context, this paper propose a framework and methodology for automated preliminary schedule generation based on historical database. The proposed methodology and framework enables to automatically generate CPM schedules for airport projects in the early planning stage in order to enhance the reliability and to reduce the workload by using structured knowledge and experience.

Development of Air Flow Calculation System for Sewage Treatment Plant according to Inflow Water Quality (유입수질에 따른 하수처리장 송풍량 산정 시스템 개발)

  • Shin Geol Kim;Wooseok Yeo;Deok-Hyeon Kim;Jong Kyu Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.486-486
    • /
    • 2023
  • 하수처리장 내 생물반응조에서는 유기물을 제거하거나 질산화(Nitrification) 반응을 일으키기 위하여 산소를 요구하고 있으며, 필요한 산소는 송풍기 운영을 통해 공급하고 있는 상황이다. 질산화 반응을 일으키기 위해서 처리장 내 일정 이상의 산소가 수중에 공급되어야 한다. 생물반응조내 용존산소가 부족할 경우 활성슬러지의 침전성이 저해되어 오염물질 저감 효율이 떨어지게 되며, 과도한 산소가 공급되어도 수처리의 효율은 개선되지 않으며 반응에 사용되지 않은 산소들은 대기중으로 방출된다. 또한 유입수질에 따라 실시간으로 반응조 내 필요한 산소는 달라지게 되므로 유입수질에 맞는 효율적인 하수처리장 운영이 요구되고 있다. 하수처리장 내 적절한 산소를 공급하기 위하여 많은 연구들이 활발하게 진행되어 왔으나 실제생물학적 처리시 요구되는 산소의 양을 산정할 수 있는 한계점을 지니고 있으며, 하수 성분, 용량과 같은 환경에 따라 차이를 보이고 있어 범용적으로 사용하기에는 어려움이 있다. 따라서 본 연구에서는 이러한 적용 한계점을 극복하기 위하여 하수도 설계 시 사용되어지고 있는 하수도 시설기준의 산소요구량 및 공기공급량 산정식을 통하여 유입수질에 따라 실제 하수처리장에 필요한 산소요구량 & 공기공급량을 산정하는 시스템을 개발하고자 하였다. 하수도 설계기준의 여러 가지 수식을 실제 하수처리장 내 필요한 요소로 변환시켜 범용적으로 사용가능한 시스템을 개발하였다. 본 연구에서 개발한 하수처리장 송풍량 산정 시스템 적용에 따른 송풍량 절감 효율을 비교분석하기 위하여 2021년 A하수처리장의 4월 월간 데이터를 활용하여 하수처리장에서 필요한 송풍량을 산정하여 실제 사용된 송풍량과 비교 분석하여 송풍량 절감 효율을 분석하였다. 본 연구의 결과를 바탕으로 실제 하수처리장 내 송풍량 산정 시스템을 도입하게 된다면 운전자 경험에 의존하고 있는 수동적인 제어 방식에서 벗어나 자율 제어를 통한 효율적인 하수처리장을 운영할 수 있어 송풍량 절감 및 탄소중립에도 이바지 할 수 있을 것이라고 판단된다.

  • PDF

Estimation of Non-Working Day Considering Weather Factors in Construction Projects - Based on Estimation Periods for Improving the Forecast - (건설공사의 기후요소에 의한 작업불능일 산정기준에 관한 연구 - 예측성 향상을 위한 산정기간 비교분석 중심으로 -)

  • Lee Keun-Hyo;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.394-397
    • /
    • 2004
  • Working-day calculation with weather factors of construction-site has estimated wethout proper data. They usually estimate it with their own experience and intuition. It causes not only economic loss to time-adjustment but also conflict with each participants. Moreover, weather estimation becomes worse than before, due to tendency of recently weather change. So, in this paper we present optimal estimation method as assessment by period of the arithmetical mean methods. For that, we analyse characteristic of the regions and weather change of temperature and rainfall which affects time.

  • PDF

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

Compaison of Reference Evapotranspiration Estimation Approaches (기준증발산 산정방법 비교)

  • Rim, Chang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.987-991
    • /
    • 2008
  • 본 연구에서는 과거 제안된 5가지의 기준증발산식으로부터 산정된 증발산량과 pan 증발량을 이용하여 상관분석을 실시하였고 pan 계수를 산정하였다. 또한 우리나라 21개 기상관측지점에서 과거 제안된 5가지의 기준증발산식들을 비교하고 그 유사성을 알아보았다. 비교 검토된 기준증발산식은 4가지 방법으로 분류하였으며, 분류된 방법 중에서 각기 대표적인 기준증발산량 산정식을 선정하여 적용하였다. 적용된 기준증발산식은 에너지와 공기동력항의 조합법에 근거한 Penman 식, 단일근원법에 근거한 FAO Penman-Monteith(FAO P-M) 식, 복사자료를 이용한 방법인 Makkink 식과 Priestley-Taylor 식, 그리고 기온자료에 근거한 방법인 Hargreaves 식 등이다. 연구지역 선정을 위하여 기상관측지점이 있는 지역의 지리 및 지형조건을 고려하였다. 사용된 기상자료는 1970년부터 5년 간격으로 8개년의 일별 기상자료를 사용하였다. 적용결과는 수치 및 시계열 도시방법을 통하여 비교하였다. 분석결과에 의하면 대부분의 지역에서 기준증발산식과 pan 증발량과는 0.9 이상의 높은 상관관계를 보이고 있으나, pan 증발량과 비교하여 회귀식의 경사가 1.0보다 크거나 작은 경향을 보이고 있다. 전국 21개 연구지역 중에서 12개 지역에서 대기온도자료에 기초한 Hargreaves 식이 FAO P-M 식과 가장 유사한 것으로 나타났는데, 이들 지역은 대구지역을 제외하고 해안지역에 위치하고 있다. 반면에 내륙에 위치한 8개 지역에서 복사량자료에 기초한 Priestley-Taylor 식이 FAO P-M 식과 유사한 것으로 나타났다.

  • PDF

A Study on the Estimation of Dilution Factors by Sensory Dilution Method and Triangular Bag Method (공기희석 관능법과 삼점비교식 냄새봉지법에 의한 희석배율 산정에 대한 연구)

  • 양성봉
    • Proceedings of the Korea Air Pollution Research Association Conference
    • /
    • 2000.11a
    • /
    • pp.103-104
    • /
    • 2000
  • 우리나라의 악취배출 허용기준에는 직접관능법, 공기희석관능법 및 기기분석법에 의한 측정과 규제 기준을 제시하고 있다. 직접관능법의 경우 신속하고 간편하여 현장에서 바로 판정을 내릴 수 있다는 점에서 부지경계선상에서의 악취의 평가수단으로 이용되어 현재까지 많은 평가서에 측정결과를 제시하고 있다. 그러나 직접관능법에 의한 평가결과가 규제치를 넘어 법적 조치가 이루어진 사업장은 거의 없는 듯하다. (중략)

  • PDF

Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.

Calculation of Non-Working Days due to Weather Factors during Structural Steel Works (기후요소에 의한 철골공사 작업불가능일 산정에 관한 연구)

  • Lee, Duk-Hyung;You, Jung-Sik;You, Jae-Kil;Jung, Jae-Hun;Jung, Hee-Kyung;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.137-145
    • /
    • 2006
  • Calculating non-working days is very important element for the accurate estimation of construction time. And non-working days are largely affected by weather factors such as rainfall, wind velocity, snowfall and temperature. In the case of concrete works, there are lots of referable information for the calculation of non-working days due to the weather factors. However, for the structural steel works, there are very limited information only. Through literature survey and interviews with a few engineers, this paper established the weather factors that affect steel structural works and the impact of those factors. Based on the factors and the expected impact of the factors together with the weather data during the last 15 years in Seoul region gathered from Korea Meteorological Administration, this paper suggests the monthly non-working day of structural steel work due to weather factors. This information can be used for the early estimation of construction time.

Cost based alternative evaluation of high-rise building structural systems (초고층건물 구조시스템의 경제성 기반 대안평가)

  • Kim, Yeong-Min;Lee, Si-Eun;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.22-25
    • /
    • 2011
  • 본 연구에서는 경제성에 기반한 초고층건물 구조시스템의 대안평가 방안에 대하여 연구하였다. 초고층건물 구조시스템의 대안평가 항목은 크게 구조성능, 경제성, 공기의 세 가지로 나눌 수 있다. 일반적으로 구조성능은 주어진 기준의 만족여부로 평가하며, 최종적으로는 경제성이 평가에 결정적인 영향을 미치게 된다. 본 연구에서는 구조성능을 만족하는 대안에 대하여 공기를 비용으로 환산하고, 최종적으로는 물량에 의한 비용과 공기에서 환산된 비용을 합산하여 대안을 평가하는 방안을 제안하였다. 공기의 비용화는 공기의 비용연동지수를 구하고 이로부터 공기의 대체경제성비용을 산정하는 방법으로 고려하였다. 제안된 대안평가 과정은 수많은 대안을 짧은 시간에 평가할 수 있도록 전산시스템 구현가능성을 염두에 두고 구축하였다.