• Title/Summary/Keyword: 계층적 의사결정법

Search Result 81, Processing Time 0.04 seconds

A Study on prioroty estimation of GIS cost Using Analystic Hierarchy Process(AHP) (계층분석법을 이용한 GIS 사업추진시 분야별 비용 중요도 우선 순위 평가에 관한 연구)

  • Heo, Yong;Kim, Jung-Ok;Yang, Sung-Chul;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.3 s.21
    • /
    • pp.99-105
    • /
    • 2002
  • In 1995 of May, the Ministry of Construction and Transportation (NOCT) developed the First Nation-wide Master Plan of GIS. It is set up in response to an increasing and various demands on spatial informations. Until now, a set of diverse projects related to spatial information have been proposed and executed. However, cost-benefit analysis of investment and decision making for alternatives have not been carried out appropriately because scientific evaluations for obtaining efficiency and economical validity of investment have been deficient. Optimum decision making for projects based on itemized priority order using effect or cost of proposed alternative plan is a fundamental expedient for demonstration of propriety of projects and enhancement of efficiency of investment. From such understanding, this paper applied the analytic hierarchy process (AHP) technique to the cost required to construct a GIS so that analyze the weight of each cost factor.

  • PDF

Development of Decision Making Model of Measures on the Decrease of Traffic Accident Following Implementation of Intra-city Bus by using AHP (AHP 기법을 이용한 시내버스 교통사고 저감대책 의사결정 모델개발)

  • Choi, Jae Won;Jung, Hun Young;Jang, Seok Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.679-687
    • /
    • 2011
  • Implementation of semi-public management system of intra-city bus achieve excellent results but there are some side effects like increase of the fatal traffic accidents. This study tries to develop decision making model of measures of reducing traffic accidents following implementation of semi-public management system of intra-city bus. And survey with traffic experts and analytic hierarchy process are used for data survey and analysis. Quantitative measures and qualitative measures are suggested as high assessment items of AHP. Quantitative measures of low assessment items composed of a raise in the number of bus and safety device installation, facility supplement of bus stop, supplement of pedestrian protection facility, traffic safety assessment and supplement. Qualitative measures composed of system organization, redesign bus route, reinforcement of education, campaign and enforcement. The results of this study are as follows. First, the result turns out more weights are calculated on quantitative measures than on qualitative measures. Second, It is turned out in order of facility supplement of bus stop and traffic safety assessment and supplement as the quantitative measures. Third, as qualitative measures, system organization and redesign bus route are in the order. The results of this study are considered to be a basic data which can be referred if measures on the decrease of traffic accident are established and implemented in other cities and provinces.

A Evaluation Model of AHP Results Using Monte Carlo Simulation (Depending on the Case Studies of Road and Rail) (몬테카를로 시뮬레이션을 통한 AHP결과 해석모형개발 (도로 및 철도부문 사례를 중심으로))

  • Sul, You-Jin;Chung, Sung-Bong;Song, Ki-Han;Chon, Kyung-Soo;Rhee, Sung-Mo
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.195-204
    • /
    • 2008
  • Multi-Criteria Analysis is one method for optimizing decisions that include numerous characteristics and objective functions. The Analytic Hierarchy Process (AHP) is used as a general Multi-Criteria Analysis considering many critical issues. However, since validation procedures for the decision reliability of AHP valuers had been left off existing methodologies, a new methodology including such validation procedures is required to make more reliable decisions. In this research, idea decision results are derived using Monte Carlo Simulation in cases where AHP valuers do not have expertise in the specific project, and these results are compared with the results derived from experts to develop a new analysis model to make more reliable decisions. Finally, this new analysis is applied to various field case studies of road and rail carried out by the Korea Development Institute (KDI) between 2003 and 2006 to validate the new analysis model. The study found that approximately 20% of decisions resulting from the existing methodology are considered prudent. In future studies, the authors suggest analyzing the correlation between initial weights and final results since final results are enormously influenced by the initial weight.

Planning Indicators for Spatial Characteristics Evaluation of Urban Public Space - the Weight Analysis for Activation of Public Space (도시 공공공간의 공간적 특성 평가를 위한 계획 지표 연구 - 공공공간 활성화를 위한 중요도 분석)

  • Lee, Hoon-Gill;Lee, Joo-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.588-598
    • /
    • 2015
  • This study derives planning items and indicators that should be considered in order to activate public space in terms of the spatial characteristics of the public space was to analysis the importance in the public officials/academics and practitioners side. Derived in accordance with spatial planning topics characteristic of public space through previous research to them and after a detailed selection indicators in Christopher Alexander's Pattern Language was so lead through the FGI. Derived surface was subjected to the significance analysis AHP through the survey expert. For this study, the importance of the spatial characteristics of the public space are working professionals accessibility, publicity, connectivity, spatiality, amenity, placeness the order, public officials/academics accessibility, amenity, placeness, connectivity, spatiality, publicity the order. In addition, professionals working in the comprehensive analysis of the most important priority was to recognize the hierarchy of open space, public officials/academics appeared to have an open space on the street the most important. The results obtained in this study will be used as an index that can be used in planning and evaluation for consideration of the next active public space.

A Study on Hierarchy Analysis of Design Factors for Product Development Process (신제품 개발과정에 있어서의 디자인요소 분석을 통한 계층화 연구)

  • 곽대영
    • Archives of design research
    • /
    • v.17 no.1
    • /
    • pp.163-178
    • /
    • 2004
  • In this study, in order to achieve the before-mentioned study purpose, the importance of developing the new product, the relationship with the design, and the design element for developing the new product were considered. In order to extract the importance of the design element which is applied to the development of the new product design, the research model about the induction of the priority was created, the evaluation items were instituted, and the demonstrative research approach was performed in order to recognize the relationship among those elements. Firstly, in the process of selecting the items for the application, 14 evaluation elements which were extracted through the advanced study data were grouped in 4 kinds of dimensions, and the properties which are related with the Digital TV product were composed up of 36 items. Through the factor analysis, by decreasing the detailed standard for the evaluation of 36 items, the parsimony was secured, and the characteristics which the various items contain induced into one factor. Secondly, the detailed factors which were united into one factor went under the paired comparison as one by one through AHP again, and then the importance degree was generated. First of all, as the first stage of AHP, the decision making factors which affect the whole achievement of purpose of the decision making were classified as in a hierarchical style. From these research results, it was known that the functional factor and esthetic factor in the process of designing the new product are the major affecting variables, and it was confirmed that in case of the Digital TV products group, the factors such as the high quality of picture, big screen, user interface, sound, product reliability, style, size, indoor reproduction, and guarantee are the main factors which influence the need of the consumers in purchasing products.

  • PDF

A Study on the Design Evaluation Indicators and Improvements of Urban Public Space (도시 공공공간 디자인 평가 지표 도출 및 개선 방안 연구)

  • Lee, Hoon-Gill;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.8021-8029
    • /
    • 2015
  • This study obtains design assessment indexes that should be considered in order to improvements of the public space was to analysis the importance in the public officials/academics and practitioners side. Obtained assessment topics in accordance with characteristic of public space through previous research to them and after a detailed selection indicators was so lead through the FGI. Derived surface was subjected to the significance analysis AHP through the survey expert. For this study, the importance of the public space are working professionals usability, publicness, environment, connectivity, identity, spatiality the order, public officials/academics usability, environment, connectivity, identity, spatiality, publicness the order. In addition, professionals working in the comprehensive analysis of the most important priority was to recognize safety, public officials/academics of the most important element appeared to have cleanliness. The results obtained in this study will be used as an index that can be used in planning and evaluation for consideration of the next improvement of public space.

Estimation of Deterioration Assessment for Weighting Factors in Pipes of Water Supply Systems Using Analytic Hierarchy Process (계층적분석과정을 이용한 상수관로의 노후도 평가를 위한 항목별 가중치 산정)

  • Kim, Eung-Seok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.5
    • /
    • pp.15-21
    • /
    • 2008
  • The purpose of this study is to estimate deterioration assessment for weighting factors in pipe network for which each local selfgovernment takes rehabilitation and replacement work at present time. Deterioic hierarchy process(AHP), calculates the weighting factors. The appropriate marks matrix of sixteen deterioration factors are made for the precise decision standard of pipe condition through the result of this analysis. The marks matrix of sixteen deterioration factors can solve the complicated decision making problems of pipe rehabilitation workration factors in the pipe network might be influenced by local factors, such as province, location, or land use, in water supply systems. In this study, the sixteen deterioration factors are determined suitable for domestic situation based on the pipe deterioration factor data inside and outside of the country. Also, we select persons in charge of calculating the detail weighting factors and do survey about important level of each deterioration factors. Delphi method, a question survey method applying the analyts.

Priority Decision of Cross-Compliance of Public-Benefit Direct Payment for Agriculture and Rural Area (농업·농촌 공익형 직불제 상호준수의무 우선순위 결정)

  • Chae, Hong-Gi;Kim, Se-Hyuk;Kim, Tae-Kyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.218-225
    • /
    • 2020
  • This study analyzed the priorities of the cross-compliance items of public-benefit direct payment using an Analytic Hierarchy Process and Fuzzy Decision Making Analysis. The valuation criteria are policy efficiency, farm acceptability, and feasibility, and the valuation targets are the basic and additional cross-compliance items. The survey was performed by targeting 50 experts from each class, and conducted for about a month starting from the beginning of July 2019. The results show that the weight of the valuation criteria is higher in the order of farm acceptability, feasibility, and policy efficiency. Compliance with PLS standards, compliance with disposal standards of waste vinyl and pesticides, soil testing, compliance with toxic substance standards, education, etc. are comparatively evaluated to be higher cross-compliance items in basic cross-compliance. Disposing of an abandoned well, jointly collecting and disposing of agricultural by-products, common area care and cleaning, maintenance of empty houses and poor facilities, growing green manure crops during the fallow period, etc. are comparatively evaluated to be higher cross-compliance items for the additional cross-compliance. The results of this study are expected to contribute to the government's policy related to the cross-compliance of public-benefit direct payment.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

A Study on Process Improvement by Incorporating the Concept of Six-Sigma into Quality Circle Activity (품질분임조와 6시그마 결합을 통한 공정개선 - 제조업 사례를 중심으로 -)

  • Kim, Jae-Hee;Doo, Hee-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.3
    • /
    • pp.673-681
    • /
    • 2007
  • The integration of Quality Circles and Six-Sigma has gained attentions for the attainment of enhanced customer satisfaction, costs reduction, and improved business performance. The purpose of this paper is to verify the benefit from the integration of Quality Circles and Six-Sigma by applying the integrated process for an alcohol manufacturing line. In the integrated process, we used the first three steps of Six-Sigma of Define, Measure, and Analyze(D-M-A) and then applied the concept of Quality Circle, which has good performance in the Improvement and Control(I-C) process. For the selection of the theme of quality circles, Analytic Hierarch Process(AHP) is used, and we also employed the experimental design, which is designed to find an optimal operating condition. Furthermore, the results of the economic analysis confirm that the integration process would be successful in reducing the incidence of defects and the quality cost.

  • PDF