법령과 고시 - 지방자치단체 입찰 및 계약집행기준 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.320
    • /
    • pp.46-47
    • /
    • 2017
  • 행정자치부는 지난 1월 23일 지방자치단체 입찰 및 계약집행기준을 일부 개정하고 2월 1일부터 시행에 들어갔다. 개정된 주요내용은 제한입찰 시 실적에 따른 참가자격 완화, 수의계약 안내 공고기간 명확화, 분담이행방식의 지연배상금 부과기준 명확화 등이다. 개정전문은 협회 홈페이지(www.kmcca.or.kr)에서 다운받을 수 있다.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

Real Estate Double Contract and It's Prevention (부동산 이중매매와 그 예방)

  • Park, Jong-Ryeol
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.7
    • /
    • pp.325-332
    • /
    • 2009
  • The Korean real estate transaction makes a contract after the buying and selling person concerned agreed a business condition. As for vendee, business consists of the method that I issue documents before provision and money left over provision and the registration at the same time, and register a contract deposit in vendor. However, it latent for the real estate transaction various accidents such as fraud from a contract day to time to finish a real estate registration transfer, embezzlement, double contract by the breach of trust. Nevertheless vendee comes to match vendor by an asymmetry of the information one-sidedly to the front completing a registration transfer. I may prevent stellionate by the breach of trust of vendor if I use an ESCROW system in such a responsibility blank state.

The Applicable Laws to International Intellectual Property License Contracts under the Rome I Regulation (국제 지식재산권 라이센스 계약 분쟁의 준거법 결정 원칙으로서 로마I 규정의 적용에 관한 연구)

  • Moon, Hwa-Kyung
    • Journal of Legislation Research
    • /
    • no.44
    • /
    • pp.487-538
    • /
    • 2013
  • It is the most critical issue in recent international intellectual property licence disputes to decide the applicable laws to the license contracts. As Korea and the European Union(EU) reached free trade agreement(FTA), and the EU-Korea FTA entered into force on July 1, 2011, the FTA has boosted social, economic, cultural exchanges between the two. As a result of the increased transactions in those sectors, legal disputes are also expected to grow. This situation calls for extensive research and understanding of the choice of law principles applicable to international intellectual property license contracts in the EU. To decide the laws applicable to issues arising from international intellectual property license contracts disputes, the characterization of those issues is necessary for the purpose of applying private international law principles to them. In terms of characterization, intellectual property license contracts fall within contractual matters. In the EU, the primary rule of choice of law principles in contractual obligations is the Rome I Regulation. Because the choice of law rules, such as private international law principles, the Rome Convention(1980), and the Rome I Regulation, differ in the time of application, it is essential to clarify the time factor of related contracts. For example, the Rome I Regulation applies to contracts which were concluded as from December 17, 2009. Although party autonomy in international contracts disputes is generally allowed, if there is no choice of law agreement between the parties to the contracts, the objective test rule of private international law doctrine could be the best option. Following this doctrine, the Rome I Regulation Article 4, Paragraph 1 provides the governing law rules based on the types of contracts, but there is no room for intellectual property license contracts. After all, as the rule for governing law of those contracts, the Rome I Regulation Article 4, Paragraph 2 should be applied and if there are countries which are more closely connected to the contracts under the Rome I Regulation Article 4, Paragraph 3, the laws of those countries become the governing laws of the contracts. Nevertheless, if it is not possible to decide the applicable laws to the license contracts, the Rome I Regulation Article 4, Paragraph 4 should be applied in the last resort and the laws of the countries which are the most closely connected to the contracts govern the license contracts. Therefore, this research on the laws applicable to intellectual property license contracts under the Rome I Regulation suggests more systematic and effective solutions for future disputes in which Korea and the EU countries play the significant role as the connecting factors in the conflict of laws rules. Moreover, it helps to establish comprehensive and theoretical understanding of applying the Korean Private International Law to multifarious choice-of-law cases.

A Study on the legal position of the carrier under the right of stoppage in transit of CISG (국제물품매매계약(CISG)의 운송유보권 하에서 운송인의 법적지위에 관한 연구)

  • Lim, Jaewook
    • International Commerce and Information Review
    • /
    • v.16 no.3
    • /
    • pp.159-182
    • /
    • 2014
  • CISG Article 71 (1) states that a party may suspend the performance of his obligations if, after the conclusion of the contract, it becomes apparent that the other party will net perform a substantial part of his obligations as a result of a serious deficiency in his ability to perform or in his creditworthiness or his conduct in preparing to perform or in perfoming the contract. CISG Article 71 (2) states a 'right of stoppage in transit' that if the seller has already dispatched the goods before the grounds described in the preceding paragraph become evident, he may prevent the handing over of the goods to the buyer even though the buyer holds a document which entitles him to obtain them. The present paragraph relates only to the rights in the goods as between the buyer and the seller. Under the right of stoppage in transit, the carrier copes with risks that the seller may claim damages arose from the handing over the goods, if he hand over the goods to the buyer and that the buyer may claim damages, if he deny handing over the goods to the buyer who has the document which entitles him to obtain the goods. Therefore the legal position of the carrier may become weak. This paper purpose to point out the legal weakness of the carrier under the right of stoppage in transit and to provide the proper legal act of the carrier and possible practice related to various characters of the contract of sale of the goods. Although there is the opinion it prevent from handing over the goods to the buyer actually under the interpretation that the buyer should take claim damages to the seller, if the goods are handed over to the buyer under the right of stoppage in transit, it is not appropriate because the opinion may disable the right of stoppage in transit. The right of stoppage in transit could be carried out under any payment conditions except letter of credit and under any mode of transportation except the cases that carrier is the buyer himself or the agent of the buyer. It could be executed regardless the forms of the transport document.

  • PDF

Designing a Blockchain-based Smart Contract for Seafarer Wage Payment (블록체인 기반 선원 임금지불을 위한 스마트 컨트랙트 설계)

  • Yoo, Sang-Lok;Kim, Kwang-Il;Ahn, Jang-Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.7
    • /
    • pp.1038-1043
    • /
    • 2021
  • Guaranteed seafarer wage payment is essential to ensure a stable supply of seafarers. However, disputes over non-payment of wages to seafarers often occur. In this study, an automatic wage payment system was designed using a blockchain-based smart contract to resolve the problem of seafarers' wage arrears. The designed system consists of an information register, a matching processing unit, a review rating management unit, and wage remittance before deploying smart contracts. The matching process was designed to send an automatic notification to seafarers and shipowners if the sum of the weight of the four variables, namely wages, ship type/fishery, position, and license, exceeded a pre-defined threshold. In addition, a review rating management system, based on a combination of mean and median, was presented to serve as a medium to mutually fulfill the normal working conditions. The smart contract automatically fulfills the labor contract between the parties without an intermediary. This system will naturally resolve problems such as fraudulent advance payment to seafarers, embezzlement by unregistered employment agencies, overdue wages, and forgery of seafarers' books. If this system design is commercialized and institutionally activated, it is expected that stable wages will be guaranteed to seafarers, and in turn, the difficulties in human resources supply will be solved. We plan to test it in a local environment for further developing this system.

Structure and expression of legal principles for artificial intelligence lawyers (인공지능 변호사를 위한 법리의 구조화와 그 표현)

  • Park, Bongcheol
    • Journal of the International Relations & Interdisciplinary Education
    • /
    • v.1 no.1
    • /
    • pp.61-79
    • /
    • 2021
  • In order to implement an artificial intelligence lawyer, this study looked at how to structure legal principles, and then gave specific examples of how structured legal principles can be expressed in predicate logic. While previous studies suggested a method of introducing predicate logic for the reasoning engine of artificial intelligence lawyers, this study focused on the method of expressing legal principles with predicate logic based on the structural appearance of legal principles. Jurisprudence was limited to the content of articles and precedents, and the vertical hierarchy leading to 'law facts - legal requirements - legal effect' and the horizontal hierarchy leading to 'legal effect - defense - defense' were examined. In addition, legal facts were classified and explained that most of the legal facts can be usually expressed in unary or binary predicates. In future research, we plan to program the legal principle expressed in predicate logic and realize an inference engine for artificial intelligence lawyers.