• Title/Summary/Keyword: 건설 작업자

Search Result 418, Processing Time 0.034 seconds

Landscape Engineers' Perceptions of the Safety Climate and Safety Behavior in Landscape Construction - Focused on Landscape Constructors and Designers - (조경공사에서 안전분위기와 안전행동에 대한 조경기술자들의 인식 - 조경시공자와 조경설계자를 대상으로 -)

  • Oh, Chang-Song;Sim, Jisoo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.4
    • /
    • pp.90-100
    • /
    • 2023
  • The construction safety policy of Korea requires safety reviews at design stages, which affect the perceptions and attitudes of the workers toward safety. Despite this heightened social interest in safety, there is no related research in the field of landscape architecture. This study entails a review of the status of landscape construction accidents in Korea and an assessment of landscape engineers' perception of construction safety climate and safety behaviors. A survey of landscape constructors and designers was performed, and the obtained data were statistically analyzed. The results indicate the following: (1) More than half of the accidents which are registered in CSI occurred in apartment houses ordered by the private sector in the type of facility and planting works in the landscaping process; (2) Landscape designers were better aware of safety than landscape constructors. Among them, safety attitude, work risk, work participation, and work pressure were statistically significant; Apart from the statistical significance, landscape designers recognized the importance of safety highly but they tended to have a relatively low perception of specific safety behaviors. (3) Lastly, landscape constructors attributed less importance to safety review during the design stage compared to other items.

A Study on the Accident Reduction Method through Survey of Hanging Scaffolding Use in Building Construction (건축공사 달비계 사용 실태조사를 통한 사고저감 방안 연구)

  • Lim, Hyoung-Chul;Lee, Dong-Heon;Jeong, Seong-Choon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.121-126
    • /
    • 2019
  • Despite the trend of decreasing accidents, falling accidents in the construction industry have not decreased and are even rising. Most major accidents are falling accidents caused by hanging scaffolding and are mostly serious. We conducted a review of the literature, institutions, and regulations, which showed that domestic standards are not unified because they are drawn up by referring to overseas standards for hanging scaffolding. New regulations or standards should be established, which should reflect the safety plans for equipment, work advance plans, education, and management. If facility improvement plan for Hanging Scaffolding and implementation of revision of the current work use, regulations and guides are implemented, it will be recognized in advance of the causes of the accident statistics and the classification system and will be the basis for the implementation of joint efforts by workers, managers, supervisors and owners to reduce accidents.

Development of Scheduling and Operation system for multi-manufacturing line of the assembly parts (조립부품 다중 제작라인의 일정계획 및 운영 시스템 개발)

  • Lee, Sang-Hyeop;Min, Sang-Gyu;Lee, Byeong-Yeol;Ha, Jae-Tae;Lee, Won-Tae;Jo, Jeong-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.425-428
    • /
    • 2005
  • 본 연구는 건설장비 차량 조립부품을 제작하는 가공공장의 계획 및 운영 시스템 개발에 대한 내용이다. 연구의 대상은 건설장비 차량인 굴삭기, 휠로더, 지게차의 조립부품을 제작하는 공장으로 제작품별 제작라인이 구성되어 있다. 그리고 각 제작라인에는 여러 개의 공정이 있으며, 일부 공정은 작업자에 의해 작업이 이루어지고, 용접 및 가공 등은 자동화된 장비 및 설비에 의해 작업이 된다. 가공공장에서 관리 및 운영의 주요 관점은 이후 공정인 조립공장의 조립 착수일에 늦지 않게 제작된 부품을 공급하는 것이다. 그리고 공장 자체적으로 제작라인 내의 재공재고 감소, 작업일간 작업부하평준화, 자동화 장비 및 설비의 효율 극대화 등이 공장의 주요 관리 사항이다. 따라서 본 연구에서는 가공공장에서 제작되는 조립부품의 납기일 준수, 재고 감소, 부하 평준화, 장비효율의 극대화를 위해 공장을 체계적으로 관리하기 위한 계획 및 운영 시스템을 개발하였다. 개발시스템에는 제작라인별 제작 착수 및 자재발주${\cdot}$입고 관리, 공정별 실적관리, 실시간 작업 진행 관리, 용접 불량 관리 기능 등이 있다. 시스템은 MSSQL 서버, 오라클과 Visual Basic, Visual C# ASP로 개발되었다.

  • PDF

A Study of Evaluation Process and Chart of PPC considering Variation (변이를 고려한 PPC 평가절차 및 평가차트 제안)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.75-83
    • /
    • 2009
  • PPC stands for the percentage of weekly assignments completed. It makes it possible to improve the performance of production planning and control systems. Recently, the cases of PPC application have been increasing because PPC is easy to apply to construction site. However, to evaluate the average of PPC or analyze PPC as time passes has some problem ; if PPC is the same, the average it is evaluated equally although there are variabilities in production system. Therefore, In order to evaluate the character of PPC in process of production this paper suggests the method of the evaluating PPC by using coefficient of variability besides PPC measurement.

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

Significance Analysis of Major Accident Factors of Remote Control Tower Crane Using AHP Technique (AHP기법을 이용한 무인타워크레인 주요 사고 요인 중요도 분석)

  • Kim, Jindong;Jung, Jinwoo;Lee, Soobo;Son, Juhwan
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.76-81
    • /
    • 2019
  • It becomes easy to acquire operating qualification of remote control tower crane and illegal retrofits is increased, remote control tower crane models are increasingly being used in smaller construction sites. However, as the problems caused by tower crane operators who have shortages of operating experience grow, safety accidents is increasing and worker is exposed to risk of accident. In this study, the cause of the accident was derived by analyzing the cause of the remote control tower crane accident. And then, the significance of accident causes was analyzed by AHP technique. The result of this study is that tower crane operators and construction workers do not comply with work rules.

Feasibility Study to Apply Automated Trench Cutter (지하연속벽 공법 자동화 도입 타당성 검토)

  • Park, Kyoung-Soon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.364-367
    • /
    • 2007
  • According to increase of construction projects which is accomplished in the town, diaphragm wall method was proposed. This method diminished noise and vibration. And it is able to excavate deeper than other methods. But excavation work is difficult to maintain vertical and requires much time to work. Also the work result depends on know-how, experience and intuition of excavating machine operator. We interviewed technical experts related with slurry wall method and find equipment's characteristics. We used cost-concern matrix to investigate the propriety for the introduction of trench cutter automation. Through the research, it is proper to apply trench cutter automation.

  • PDF

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.

Analysis of Major Management Factors Affecting Crew Productivity in Road Bridge Construction Site Using IPA (IPA를 이용한 도로교량 골조공사의 작업조 생산성 관리요인의 중요도 및 실행도 분석)

  • Huh, Young-Ki;Lee, Sang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.39-45
    • /
    • 2019
  • Crew productivity in the construction industry is an important indicator of soundness and efficiency of work process, since all works in a site are conducted as groups of people. A survey was conducted in order to reveal importance and performance of major management factors affecting crew productivity in road bridge construction site using IPA. As a result of the analysis, it was found that 'Construction equipment' and 'Human resource related' factors among five major-categories are most important but with low performance. Furthermore, from another analysis with 27 factors of sub-categories, it is revealed that factors needed sustained attention are four, namely 'Just-in-time machinery delivery', 'Formation of a crew members', 'Skill of workers', and 'Site control and management', whereas those needed much more improvement are five, such as 'Machinery performance', 'Clearity of Design', 'Clearity of shop drawing', 'Timing of work instruction and approval', and 'Clearity of work instruction'. Findings from this study will enable road agencies as well as road construction experts to enhance crew productivity in a site.