• 제목/요약/키워드: 건설 자재 관리

Search Result 270, Processing Time 0.025 seconds

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF

The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site (Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향)

  • Lee Sang-Hyuk;Lim Myung-Bok;Lee Jae-Sung;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2003
  • There are many problems in management of high-rise building construction performed in downtown area due to limited spaces and equipments for increasing kinds and quantities of material. By these restrictions, problems such as increase of construction cost. delay of construction period, decrease of productivity, occurrence of accident are caused. Recently, studies on JIT concept have focused on construction materials as a solution for the problems. But, studies about finishing material are insufficient yet. Accordingly, this study suggests flowing of current material management, JIT management effect, and development direction of lifting-up and procurement system with Low-emissivity double Glazing, among of main finishing materials.

  • PDF

A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

Real-Time Construction Resource Monitoring using RFID/USN Inter-working System (RFID/USN 연동 시스템을 활용한 건설자원 실시간 모니터링 시스템)

  • Ryu, Jeoung-Pil;Kim, Hyoung-Kwan;Kim, Chang-Yoon;Kim, Chang-Wan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.90-94
    • /
    • 2007
  • Location tracking automation of resources in construction industry is one of the most important procedures to improve construction project performance and reduce the period of construction. Recently, location tracking technologies have proven to be effective in tracking construction materials and equipment in real time through the instrumentality of RFID (Radio Frequency Identification). By using wireless communication and inter-working system between RFID and USN, it is possible that construction engineers receive the location information of construction resources without additional efforts that move the RFID reader to read tags periodically. In the inter-working system, RFID reader delivers the acquired materials information to sensor node which is connected by serial interface. Then sensor node transmits the received data to the data aggregation terminal that is a sink node. The data aggregation terminal can transmit collected data to construction manager who is out of construction site using infrastructure such as CDMA(Code Division Multiple Access) network. The combination model of the two system and field test scenarios are presented in this paper.

  • PDF

A Research on how to turn Object oriented Database of civil materials to practical use (객체지향 Data Base를 이용한 토목자재 정보의 이용방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Kim, Do-Keun;Jo, Chan-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.708-711
    • /
    • 2008
  • This study is intended to build research for ways to utilize material information in the design and working business for public works. The contents and results of this study can be classified into object-oriented DB application to bridge construction and object-oriented DB utilization of civil material information. First, application of object-oriented DB to bridge construction 1) constructs the work unit of classified work table as an object(Each object constructs material information on the statement of quantity calculation as data), 2) constructs object-oriented DB for superstructure and substructure of PSC Beam bridge, 3) leads to the research for ways to utilize materials by developing 3D bridge prototype with REVIT structure. Secondly, ways to utilize object-oriented DB for civil material information identified the possibility for utilizing it in making 2D drawings for design work, preparing materials list, analyzing structure for working businesses, selecting and purchasing materials, managing process and maintaining. It is suggested that the results of this study should be applied to all bridge constructions through test-bed and additional studies so as to secure the credibility of the results of this study.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

A Simple Formula for the Number of Lifting Times of Finishing Materials in High-rise Complex Building Construction (마감자재 양중횟수 산정 약산식 제안 - 초고층 주상복합 건물)

  • Mun Min-Sik;Choi Seock-Hyun;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.622-625
    • /
    • 2003
  • The purpose of the study is to propose a simple formula of lifting times of finishing materials on establishing the high-rise complex building, it is expected to help the efficient planning of lifting. The planning of lifting the finishing materials becomes important as the buildings get higher. The efficient level of lifting times has been calculated from 'Packaging' to improve the existing studies on the planning of lifting ; 'Packaging' means 'Making a bundle as one unit' basing on the characteristics of the individual materials. The simple formula has been produced regarding two variables of the typical floor area and the number of rooms per area.

  • PDF

A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials (초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안)

  • Chung Yun-Woo;Kim Eun-Sang;Suh Hyun-Ah;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.539-542
    • /
    • 2004
  • Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.

  • PDF

Development of Construction Material Naming Ontology for Automated Building Energy Analysis (건축물 에너지 분석 자동화를 위한 건축 자재명 온톨로지 구축)

  • Kim, Ka-Ram;Kim, Gun-Woo;Yoo, Dong-Hee;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.137-145
    • /
    • 2011
  • BIM Data exchange using standard format can provide a user friendly and practical way of integrating the BIM tools in the life cycle of a building on the currently construction industry which is participated various stakeholder. It used IFC format to exchange the BIM data from Design software to energy analysis software. However, since we can not use the material name data in the library of an energy analysis directly, it is necessary to input the material property data for building energy analysis. In this paper, to matching the material named of name of DOE-2 default library, rhe extracted material names from BIM file are inferred by the ontology With this we can make the reliable input data of the engine by development a standard data and also increase the efficient of building energy analysis process. The methodology can enable to provide a direction of BIM-based information management system as a conceptual study of using ontology in the construction industry.