Event Oriented Modeling Approach on Tunnel Muck Hauling Operations (터널 버력처리 공정의 시뮬레이션 모델 구축에 관한 연구)

  • Kim, Kyoung-Min;Seo, Hyeong-Beom;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.574-578
    • /
    • 2006
  • Simulation has considerable potential as the tool of construction management, but in the case of domestic, it is at an early stage applying simulation to micro-process assesment. For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of the fields. This study introduces the methodology to build the simulation model, then verifies the model with the operation data.

  • PDF

Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model (초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정)

  • Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.26-33
    • /
    • 2009
  • The required level of detail in scheduling depends on the stages in the construction life-cycle. The objective of this study is to provide a Standardized Schedule Model (SSM) with an aim to facilitate the estimating of construction duration in the planning stage. The SSM modularizes work items; establishes relations between preceding and succeeding activities; and calculates approximate construction duration. The estimated duration of the SSM was compared with the detailed duration from the commercial scheduling tool using actual work activities. The difference showed to be ranged between -3.1% and +15%, which demonstrates that the SSM can be feasibly applied to the approximate estimation of construction duration.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

A Basic Study for Accumulating Scheduling Knowledge-Base (공정관리 지식기반 구축을 위한 기초적 연구)

  • Jang Se-Han;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.83-91
    • /
    • 2001
  • Generally the level of accumulating scheduling knowledge-base in Korean construction companies is in the scheduling knowledge-base infrastructure construction phase and Even in top 10 construction companies, the level is in early scheduling knowledge activity phase. The principle causes of this situation are unawareness of importance to scheduling knowledge and absence of procedure related to scheduling knowledge-base. This research analyzes the problems to accumulate scheduling knowledge-base in Korean construction companies and proposes a procedure model to accumulate scheduling knowledge-base property, which adds items of scheduling knowledge-base infrastructure and scheduling knowledge activity to the existing scheduling procedures of Korean construction companies. Using procedure model for accumulating scheduling knowledge-base, Korean construction companies can develop a new scheduling procedure and accumulate scheduling knowledge accordingly. If scheduling knowledge were accumulated property according to the procedure, a framework for knowledge management system could be provided.

  • PDF

A Study on the Cost and Schedule Integration Model based on the Improvement of Work Packaging Mode (Work Packaging Model의 개선을 통한 공정 - 공사비 통합모델 구축)

  • Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.82-90
    • /
    • 2000
  • An integrated cost and schedule control is a noteworthy alternative of the separate control method which is commonly used in the domestic construction industry. In Korea, some cost and schedule integration models have been applied partly by construction managers. But, these models have not been customized yet because they did not reflect the characteristics of the domestic construction industry. This study investigates the characteristics of domestic integration models analyzed through interviews with experts who have the experiences in applying cost-schedule integration models. Based on these surveys, this study suggests the strategy for the improvement of work packaging model in the domestic construction industry.

  • PDF

The Time Management Model focused on the Risk Management (위험관리 중심의 공정관리모텔)

  • Chu, Hae-Keum;Shin, Hyeng-John;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.81-89
    • /
    • 2005
  • Construction projects are characterized that exposed high risks so feel strongly necessity of actively risk management that manage the time of project. but recent generally time management tools are not satisfied sufficient supporting the risk identify and risk analysis. Therefore this study purposed development the time management model that in order to improve existing problem of time management model in construction project and developed model could perform practical risk management in construction field. The new time management model focused on the risk management will be able to conduct critical path management and risk critical path management simultaneously.

A study on the relationship between design and construction information for the Integrated Construction Information System (통합 건설 정보 시스템 구축을 위한 설계-공정 정보의 연계 방안에 관한 연구)

  • Yun Seok-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.107-114
    • /
    • 2002
  • As many software tools are used for managing construction projects, integration of their data and information is gradually becoming critical. Focusing on the integration of design and scheduling data, a generic scheduling information model is designed through this research, with appropriate consideration for past research results on construction information model and also object oriented CAD technology. In order to test the practical usage of this model, a small prototype system which can derive schedule information from the design information is implemented.

  • PDF

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

Development of 4D System Linking AR and 3D Printing Objects for Construction Porject (AR과 3D 프린팅 객체를 연계한 건설공사 4D 시스템 구성 연구)

  • Park, Sang Mi;Kim, Hyeon Seung;Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.181-189
    • /
    • 2021
  • In order to increase the practical usability of the virtual reality(VR)-based BIM object in the construction site, the difference between the virtual image and the real image should be resolved, and when it is applied to the construction schedule management function, it is necessary to reduce the image gap between the virtual completion and the actual completion. In this study, in order to solve this problem, a prototype of 4D model is developed in which augmented reality (AR) and 3D printing technologies are linked, and the practical usability of a 4D model linked with two technologies is verified. When a schedule simulation is implemented by combining a three-dimensional output and an AR object, it is possible to provide more intuitive information as a tangible image-based schedule information when compared to a simple VR-based 4D model. In this study, a methodology and system development of an AR implementation system in which subsequent activities are simulated in 4D model using markers on 3D printing outputs are attempted.

Productivity Analysis of Tunnel Muck Hauling Operations (터널 버력처리 공정의 생산성 분석;경부고속철도 원효터널을 중심으로)

  • Hwang, Ho-Jung;Kang, Chan-Sung;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.827-831
    • /
    • 2007
  • For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system and offers reasonable decision making data using the simulation based planning of construction equipment operation.

  • PDF