• Title/Summary/Keyword: 건설참여주체

Search Result 124, Processing Time 0.055 seconds

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

Development of Digital Quantity Database Standard (디지털 수량산출정보 교환표준 확장 방안 마련)

  • Moon, Jin Seok;Han, Choong Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.05a
    • /
    • pp.776-777
    • /
    • 2013
  • 디지털 수량산출정보 교환표준" 건설CALS/EC 체계 내에서 사용되는 공정 공사비 관리를 위한 디지털 수량산출정보 관련 표준의 기본 요건을 정의하고 참여주체간의 효율적인 수량산출정보의 교환 및 공유기반을 마련함을 목적으로 2011년 4월에 제정되었다. 해당표준의 활용성과 확장을 위하여 스키마를 추가 개발하며, 건설사업관리시스템과 연동하여 사업참여 주체간 정보공유와 관리가 가능하도록 하였다.

The Establishment of the Task and Role of the Participants at Building Remodeling Phases (건축 리모델링 사업단계별 참여주체자의 업무와 역할정립)

  • Jung Duk-Woo;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.331-334
    • /
    • 2002
  • This study proposes a scheme for successful remodeling projects by establishing the task and role of project participants. In doing so, the study investigates the natures and problems of the current remodeling practices through interview and questionnaire survey with experts. This study establishes the critical phase of remodeling process and defines the task and role of project participants at each phase. The related documents of being generated at each phase also match up the task and role. It is expected that this scheme can be applied to deal with conflicts, cost overruns, and delays of time.

  • PDF

Data Model for Document Exchange of Construction Projects (건설 프로젝트 문서교환을 위한 데이터모델)

  • An Sun-Ju;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.569-572
    • /
    • 2003
  • A construction process involves many designers, engineers, contractors, consulting engineers and government officials. Thus, it is essential to promote collaboration among such participants through of effective document exchange. There have been efforts to Improve efficiency of document exchange through Web. Also XML/EDI is recommended by its method. So the purpose of the research was to establish the data model for document information management in document exchange for construction participants using web-based XML/EDI. This research proposed a method of modeling document information for systemic management of document information that exchanged by XML/EDI in central and explained concept of application document information that stored in database. This research classified construction document according to its information relation.

  • PDF

XML-base Process Improvement for Change Order of Construction Steel Works (XML 적용 철골공사 설계변경 프로세스 개선)

  • Nam, Gyoung-Woo;Seo, Yong-Chil;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.64-72
    • /
    • 2006
  • The participants of steel works should exchange a variety of information with others through documents. However construction steel works in the multistage contract system has a difficulty in exchanging information through the documents promptly. So if the trouble as change orders arise, conducting steel works will take much time, and the participants may not discuss the trouble sufficiently. Consequently this study improved the current business process of steel works. And this developed business support system(XCOS) based on XML so that participants of steel works achieve a successful management of steel works through conducting business rapidly and correctly.

A Development of Risk Identification Checklist for Stakeholders in the Construction Phase of the Urban Regeneration-Projects (도시재생사업 건설단계의 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Young, Moon-Serk;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.67-75
    • /
    • 2009
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically. The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analizing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.

Development of a Materials Management System Considering Construction Supply Chain Management (건설공급사슬을 고려한 건설공사 자재관리시스템 개발)

  • Jang, Myung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.87-93
    • /
    • 2009
  • A construction supply chain needs an integrated information system, as the general contractor and subcontractors must communicate regularly with one another and share a substantial amount of information in their cooperative work. In the construction industry, supply chain management is necessary in the management of a system, including business process improvement, participant-oriented management, and the supply chain. This research proposed a supporting system and developed the prototype focusing on materials that play an important role in the supply chain. Construction projects are managed mainly through schedule management. As such, supply chain management should be linked with schedule management. The research implemented a prototype of the supporting system for construction supply chain management. The prototype was implemented in Microsoft Project using VBA, including a simulation tool based on @Risk for Project.

A Development of Risk Identification Checklist for Stakeholder in Urban regeneration-Projects (도시재생사업 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.487-490
    • /
    • 2008
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analyzing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.

  • PDF