A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

The Implementation of Web-based Defect Information Feed-Back System for Construction Management in the Construction Process -Focused on Apartment Houses- (시공단계의 효율적 공사관리를 위한 Web기반 하자정보 Feed-Back시스템 구현방안 - 공동주택을 중심으로 -)

  • Cho Yong-Min;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.482-485
    • /
    • 2002
  • The boom of housing market lead to build a lot of apartment houses concentrated on the metropolitan area and developing new city in 1980's made 2,000,000 houses. In this time, quality standards could not be satisfied with consumers' desire due to the policy about excessive supply and come from unexpected defects in the complected buildings. In $1980's\~1990's$, It would be performed on the study for defect prevention in apartment houses. It has contributed in no way to the reduction at the rate of the defect outbreak and the solution of consumers' dissatisfaction by flaws. The reason is that the study related defects is not linked and applied by the managing and controlling system, Therefore, the study will be analyzed out defect information occurred on apartment houses of domestic construction and classified by type features. As a result, it will suggest web-based feed-back system for getting systematic information and the practical use.

  • PDF

A Study about the cost present condition through research on the actual condition the apartment houses expenses levy system - Focusing on the Apartment Complexes Cases in Seoul - (공동주택 관리비부과방식 실태조사를 통한 비용현황관리에 관한 연구 - 서울시 아파트 단지 사례를 중심으로 -)

  • Park Kyung-Mo;Kim Chang-Duk;Park Tae-Keun;Chon Jae-Youl;Kim Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.236-241
    • /
    • 2004
  • Now it is a difficult situation to compare the apartment houses expenses with the others because of showing the difference according to several facts such as the location, the time of completion, the number of households, the heating system and the management system. So tenants who do not know related information cannot know whether the management expenses which they are put to expense is fair or not. Therefore firstly, this study presents cost breakdown system with investigating and analyzing the management expenses levy system of the apartment locating the city of Seoul. Secondly, this deduces problems and presents a remedy with analyzing cost management business procedure.

  • PDF

Construction Plan of 3D Cadastral Information System on Underground Space (지하공간 3차원 지적정보시스템 구축 방안 연구)

  • Song, Myungsoo;Lee, Sungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.57-65
    • /
    • 2014
  • Recently, Construction business is changing from on the ground to underground space because of deficit of developing space, creation of green space and of incremental of land compensation expenses. Meanwhile, 3D Topographic, Marine and Cadastral maps need to have Spatial Interrelation. Also, understanding of the information is also needed. Spatial information object registration system is impossible to contact and understanding intelligence mutually because the former one is managed as automatic ID system. Therefore, 3D Object information ID System of underground space is managed based on Object Identifier. Construction of Spatial information integration ID System is required and it will offer Division Code (Ground, Index, Underground) and depth information. We are defined and classified Under Spatial Information in this paper. Moreover, we developed the integration ID System based on UFID for cadastral information Construction. We supposed underground spatial information DB Construction and a developed the way of exploiting 3D cadastral information system through the study. The research result will be the base data of Standard ID system, DB Construction and system Development of National spatial data which is considered together with spatial interrelation.

Suggestions on the Improvement of the Hydrological Data Operation II (수문관측자료 운영 개선방안에 대한 연구 II)

  • Kim, Hwi-Rin;Cho, Hyo-Seob
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.879-882
    • /
    • 2007
  • 수문관측자료 운영 개선방안에 대한 연구(2006, 김휘린, 조효섭)에서 건설교통부 한강홍수통제소에서 수행하고 있는 수문관측자료를 대상으로 하여 관측, 기록, 전송, 품질관리, DB구축 및 정보화의 5단계로 임의 분류하고 각 단계별 현황을 파악하여 문제점을 검토하고 개선방안을 제안하였다. 이는 적극적으로 수용되어 수문관측자료 운영에 대해 개선을 시도하였으며 본 논문에서는 이를 간략히 소개하고자한다. 첫째, 관측소 점검 대장이 조사과와 전기통신과로 이분화되어 있고 각 관측소별로 점검대장이 비치되어 있으나 이를 수기로 작성하고 있으며 자료의 업데이트 및 과거점검대장의 DB 구축과 비전산화를 지적한 바 있다. 이에 '물관련시스템 DB연계 사업'을 통해 수기로 작성된 관측시설 점검대장을 전부 DB로 구축하였고 이를 총괄하여 관리 및 점검사항을 업데이트할 수 있는 관측시설 점검대장 관리 및 입력 프로그램을 구축하였고 현재 한강홍수통제소에서 시험 운영 중에 있다. 향후 보완이 끝난 후에는 낙동강, 금강, 영산강 홍수통제소에도 확대 설치 및 운영을 실시할 예정이다. 둘째, 수문자료의 품질관리에 있어서 전산시스템에 의한 완전 자동화는 실현하기가 어려울 뿐 아니라 바람직하지 못한 결과를 가져올 수 있으므로 담당자의 수동 검토 및 처리과정은 필수적이라고 논한 바 있다. 그 후 수문자료품질관리T/F팀(조사과, 전기통신과, 하천정보센터)이 구성되었고, 홍수기 오 결측자료 발생 확인, 긴급대응 촉구, 이상치 발생원인 추정 및 대책 마련 등 고품질 수문자료를 생성하기 위해 노력하였다. T/F팀 활동사항은 타홍수통제소에서도 벤치마킹이 되고 있다. 보다 정확한 댐운영자료 공유방안을 위한 관련기관과의 협력회의가 개최되어 품질관리된 자료의 정보 공유시기, 공유방식, 자료형태 등이 결정되었다. 이는 유관기관간 품질관리된 댐운영자료의 효율적인 정보 공유체계 확립을 위한 체계를 마련하는 계기라고 사료된다. 또한, 유량측정사업 결과를 익년에 반영하는 기존 방식을 개선하기 위해 유량자료관리및분석시스템(프론티어사업에서 수행, 한국건설기술연구원 개발)을 통제소내에 설치 운영을 추진하고 있다.

  • PDF

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

Establishing a Energy Utilization Database for Energy Performance Evaluation of Multi-Family Housing using District Heating (지역난방 공동주택의 에너지 성능 평가를 위한 공동주택 단지별 에너지사용량 Database 구축)

  • Jeong, Jaewook;Hong, Taehoon;Ji, Changyoon;Leigh, Seung-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.105-113
    • /
    • 2015
  • In order to evaluate the energy performance of buildings, it is important to determine reliable information of energy utilization during operating phase. It is also required to establish the database which have the amounts of population deducted by objective filtering and analysis. In this study, all energy sources were applied to evaluate synthetically the energy performance of Multi-Family Housings(MFH) using district heating and the amounts of population were obtained sufficiently through data searching in Seoul and neighbor cities. Finally the database of source energy utilization and $CO_2$ emission in 325 MFH complexes were established through cross validation between data sources and statistical analysis. Additionally, further ideas have been proposed to improve existing MFH Management Information System.

A Study of Pre-assessment Framework for Business Environment for Delivering Projects in a New Overseas Market (해외 신규 시장의 프로젝트를 수행하기 위한 사업환경 사전조사 프레임웍에 관한 연구)

  • Oh, Jungkeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.78-90
    • /
    • 2015
  • Due to a significant decrease in the number of construction projects in the domestic market of Korea, overseas expansion of the Korean construction companies has been accelerated in recent years. However, the practice of bidding at a low price and lacking information about foreign new markets caused many companies to fail in their entries to these markets. As a measure to prevent such failures, this study has developed a framework which first defines the key research items that must be identified beforehand and then classifies them into a structured way so that the construction companies can actually use this framework to be better prepared for their forays into the new markets. The framework was actually applied for a construction project in Morocco, and its usefulness was proven by the user's successful participation into the project, nevertheless the application and result was limited. Although perhaps this framework should be applied to many more construction projects for its validity to be verified and for its structure to be better standardized, the framework still has its value due to the following two reasons: first, it has systemized the research items that had been only conceptually defined but had never been organized, and second it can be utilized as a investigation tool at the marketing stage.

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.