A Study on the Automation in Construction using and RFID System (RFID 시스템을 이용한 건설 자동화 방안 도출을 위한 기초 연구)

  • Yoo, Jae-Min;Park, Eun-Soo;Jun, Young-Joon;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.729-732
    • /
    • 2008
  • Complexity and Massive is the modem trend of construction project. The lack of timely and accurate construction data is the main cause for the lack productivity increases seen in other industries. Because information is essential in the construction production process, the lack of it will cause workers to stay idle, build the wrong thing that has to be redone, become involved in an accident or simply waste their time doing non-productive work. To aid construction automation and improve its productivity, RFID technology system should be developed. As a result of that, this study analyzes the status of RFID technologies in construction project and suggest advanced construction method. USN and RTLS system is analyzed in this study RFID system also can be used in construction management, material management, quality control, safety management and human resource management.

  • PDF

Application of 3D Scanner for Tunnel Construction Using IT (터널 정보화 시공을 위한 3차원 스캐너의 활용 방안)

  • Son, Jae-Won;Min, Won;Ahn, Jae-Gyu;Heo, In-Wook
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.162-165
    • /
    • 2010
  • 우리나라 대형 건설시장의 하나인 터널 시공은 계획 대비 많은 물량과 자재의 소모로 인해 이들 정보의 지속적 관리를 통한 정확한 물량 및 자재 산출 정보 예측에 대한 관심이 꾸준히 요구되고 있는 실정이다. 대부분의 시공현장에서는 굴진의 정확도 검측을 위해 광파기를 사용하고 있다. 광파기는 공사 초기 시부터 유지된 원점으로부터의 정확한 좌표를 사용하고 있어 취득된 정보는 신뢰할 수 있으나, 몇 개의 기준점을 측량하여 굴진방향 및 공사의 진척도를 평가하는 방식이므로, 전체적인 면을 측정하지 못한다는 단점이 있다. 이에 반하여 3차원 스캐너는 제원에 따른 반경 내의 모든 점들을 계측하여 그 정보를 선이 아닌 면으로써 파악하지만 위치에 대한 정확도를 포함할 수 없다. 이러한 문제점을 보완하기 위하여, 광파기와 3차원 스캐너를 동시 활용하는 본 시스템은 현장에서 소모된 자원의 정확한 양을 체크하여 굴진정도를 파악하여 공사의 전반적인 진도를 관리할 수 있다. 또한 여굴의 발생 여부를 직접 확인하고 계획대비 소모된 물량정보를 통해 자재관리를 할 수 있게 된다. 마지막으로 추후 발생할 수 있는 하자에 대한 정확한 근거를 제시하여 균열 및 누수 등에 대한 정확한 원인 파악을 제공할 수 있다는 장점들을 제공한다.

  • PDF

The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

Implementation Status of TPMS in GS E&C's Overseas Projects (GS건설 해외 Project의 TPMS 적용 현황)

  • Lee, Jun-Bok;Park, Chan-Jeong;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • GS E&C applies TPMS(Total Project Management System) to all construction projects. This system is applied to all overseas projects, it is successfully used not only GS E&C but also subcontractors, vendors and clients. TPMS collects data spontaneously that is used to each participant, improves effectiveness in construction projects and gives transparency to all participants while sharing same information. This paper is aimed to share successful case study focusing on document management system, and how to develop TPMS in the future.

  • PDF

사이버 아파트 네트워크 기본 설계에 관한 연구

  • Choe Chang-Geun
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2002.08a
    • /
    • pp.85-104
    • /
    • 2002
  • 최근 정부(정보통신부)는 사이버 아파트를 포함하여 초고속 정보통신망을 2005년까지 구축하여 각 가정당 10Mbps의 고속 정보통신서비스를 실현한다는 계획을 발표하고, 초고속 정보통신을 활성화하므로 정보통신 선진국 진입을 위하여 "초고속 정보통신 건물 인증제도"를 발표, 현재 시행하고 있다. (1999.7 제정발표) 그러나 시행 과정에서 아파트 중앙 관리실에 있는 MDF 이후의 광케이블과 기타 공사는 건설회사에서 시공하고 중앙 관리실 MDF 이전의 광케이블 공사와 중앙관리실 LAN시설 등의 공사는 통신 전문업체로 하여금, 입주자 별도 부담금으로 시공하고 있다. (컨소시엄구성) 최근 아파트 분양열기 고조로 건설회사 마다 "초고속 정보통신아파트"인증 1등급이라고 선전 및 분양광고 중인데 실제는 "1등급"이 아니고 "2등급" 또는 "3등급"인 경우가 있어, 정부가 목표하는 각 가정당 10Mbps, 개인당 2Mbps 고속정보통신 서비스는 실현성 문제점이 있다. 정부의 인증심사 기준에 중앙관리실 장비 등에 대한 것은 심사기준에 누락되어 있고 또 사생활 정보보호를 위한 대응기술, 시스템 준비 정도까지 포함하여 종합적으로 평가한 뒤 인증을 부여하여야 한다는 것이 본인의 연구 초점이다. 사이버 아파트란 광통신을 주축으로 영상과 음성, 데이터를 자유 자재로 전송 처리하는 초고속 정보통신망을 이용하는 것으로 LAN 장비를 이용하여 각 세대간 통신은 물론 누구나 인터넷을 사용할 수 있는 기능이 있는 설계된 아파트를 말한다. 사이버 아파트의 네트워크에는 금융, 홈쇼핑, 예약, 지역정보, 관공서, 의료서비스, 레저 생활정보 등 차별화된 콘텐츠 확보가 필요하다. 본 연구의 핵심은 사이버 아파트의 현 실태와 문제점, 정부의 인증심사 기준의 미비점과 문제점, 사이버 아파트의 기능, 구성요소, 시스템 구축, 서버활용도, 장비들에 관한 것과 그리고 정부의 사이버 아파트 육성정책, 정보보호 대책과 관련업체들의 동향 등을 연구하여 요약 정리하였다.

  • PDF

Daily Reporting System using Digital Pen at Construction Site (디지털펜 기반의 건설현장 작업일보시스템 개발)

  • Shin, Yoonseok;Kim, Daewon;Kim, Tae-Yong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.177-183
    • /
    • 2016
  • The daily report includes the most detailed information and various daily planning and performance data recorded at a site, and includes work types, the number of workers, and the equipment and materials used. However, in the daily reporting process, some information can be omitted or distorted or even made redundant due to there being several steps of manual input. For this reason, the daily report is utilized for a simple report rather than for an appropriate purpose. Thus, to resolve the issues of the existing daily report system mentioned above, a daily report system using a digital pen was developed and then applied to an actual construction site to verify its applicability. As a result, it was found that 96.610% recognition accuracy of handwritten letters could be achieved. In addition, it was no longer necessary to enter the same information multiple times and no additional training or education for using a mobile device was needed. The digital pen-based daily report program developed in this study is expected to contribute to an improvement of information management efficiency and site document management work by addressing the problems of the existing report system.

Position Tracking Method in Construction field using IT Technology (IT기술을 이용한 건설현장 내 위치관제 기법)

  • Kim, Hyun-soo;Do, Seoung-bok;Choi, Hyun-young;Jang, Young-gu;Jeon, Heung-su
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.475-478
    • /
    • 2014
  • This paper proposed the position tracking and recognition method of workers and cars in construction field. The reason why the position of workers and cars has to be tracked is to prevent the safety accident, emergency rescue, and theft of building materials by unauthorized people and car, etc. To realize the tracking, it needs to adopt the Information Telecommunication technology to the construction field as an integrated support system. In this paper, we proposed the continuous positioning tracking algorithm for workers and moving cars using the selected wireless communication network. And we proposed the virtual gateway method to detect the entrance status of moving workers and cars. All of these proposed methods are evaluated in real construction field using the prototype of support system made by ourselves.

  • PDF

Interview - Standardization of Design Drawings·Modular Building⋯ "The era of BIM? Already has come." (인터뷰 - 설계도면 표준화·모듈러 건축⋯ "BIM의 시대? 이미 왔다")

  • Lee, Yu-Ri
    • Korean Architects
    • /
    • s.615
    • /
    • pp.28-31
    • /
    • 2020
  • 도입까지 시간이 걸릴 것이라고 예측됐던 건설정보모델링(BIM : Building Information Modeling, 이하 BIM)이 어느새 성큼 다양한 분야에 진입했다. 영국, 싱가포르, 미국 등 해외에서는 이미 공공사업 시 BIM을 적극적으로 활용하고 있다. 우리나라 또한 2018년 국토교통부에서 '스마트 건설기술 로드맵'을 마련한 후 공공사업에 BIM을 단계적으로 도입해왔다. 대부분의 발주기관들은 오는 2025년까지 공공사업에 BIM을 전면 도입한다는 계획이다. 성균관대학교 공과대학 건설환경공학부 및 미래도시융합공학과 교수이자 국제건설자동화학회의 종신 상임이사인 권순욱 교수는 '스마트 건설 관리' 연구자이자 국내외에서 활동 중인 CM, BIM의 권위자다. 관련 분야의 책 8권과 100편 이상의 논문을 집필하고 30여 개의 특허·소프트웨어 등록을 보유하고 있다. 텍사스 오스틴 대학교 토목공학 박사 출신으로, 삼성물산, 한국건설기술연구원 등 일반 기업과 국가기관에서 실무와 이론을 두루 경험하며 경력을 쌓았다. 건설연구개발사업, 첨단 융복합 건설기술 등 다수의 국가 건설 R&D에 참여해 초고층 자재, 안전 모니터링, BIM 프로세스 표준개발 등의 시스템을 개발하기도 했다. 해외 연구자들과의 교류에도 적극적이다. 세계 석학들과 '노령 공학' 관련 영문교과서를 공동 집필(스마트주택 챕터 담당)했고, 2016년과 2019년엔 국제건설자동화학회와 국제프로젝트관리학회의 연사 자격으로 강단에 섰다. "영국, 싱가포르 등에선 공공사업을 100% BIM으로 발주하기 시작했습니다. 우리나라 정부도 비슷한 길을 가고 있습니다. 일정 규모의 발주 물량이 안정적으로 나오는 공공기관에서 그렇게 한다는 것은 국가가 전체 패러다임을 바꾸겠다는 의지 아닐까요?" 6월 10일 그의 연구실에서 권순욱 교수를 만나 BIM의 현황과 전망에 대해 들어봤다.

  • PDF

A Study on the Development of real time monitoring system data model in Steel Structural Construction (철골공사에서의 실시간 모니터링 시스템 데이터 모델 개발에 관한 연구)

  • Son, Chi-Soo;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.823-826
    • /
    • 2007
  • In the construction project, the efforts to use IT for efficient management and improvement of productivity is gradually increasing. For instance, the cite management model with 3D CAD and RFID shows one of efforts this model define and systematize a variety of data occurred each work unit(design, material and process management information, etc). However, so far, there has been the problem monitoring the site due to the an inaccurate data and low-practice which people should input in manual. In this paper, we would like to establish the data for real time monitoring system with data inputting automatically from RTPM system and the site, and analyze the relationship between tables consist of similar data through RED Diagram.

  • PDF

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.