• Title/Summary/Keyword: 건설성과

Search Result 1,594, Processing Time 0.023 seconds

"건설기술연구성과 발표회"세미나 (2)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.56 s.73
    • /
    • pp.61-91
    • /
    • 1996
  • 이 자료는 한국건설기술연구원이 지난 4월 17, 18일 양일간 개최한 구조$\cdot$도로$\cdot$지반$\cdot$수자원$\cdot$환경$\cdot$건축$\cdot$기전$\cdot$건설관리$\cdot$정보센터 등 총 9개 분야에 대한 ''건설기술연구성과 발표회'' 세미나 자료중에서 주택건설관련 자료만 발췌, 총 4회에 걸쳐 게재합니다.

  • PDF

Methodology Development for Analyzing Performance of Star Technology using BSC in Construction (BSC를 이용한 건설R&D 스타기술의 성과분석 방법론 개발)

  • Park, Hwan-Pyo;Hong, Tae-Hoon;Chin, Kyung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.194-203
    • /
    • 2008
  • Construction Research and Development (R & D) projects have been begun with the investment of 1.2 billions in 1994 and have been reached to 30 billions in 2004. During this ten-year period, a total of investment for construction R&D amounts to 125.7 billions (Total 418 construction R&D projects). However, the results of each R&D project could not apply to real construction site because each project has been performed by a small size (0.5 billions). In addition to those, the social interest on the construction R&D projects has not been received and those importance has not been recognized. Especially, there aren't still standardized methodologies or weighted measurement data for evaluating research performance of the construction R&D projects up to now. The construction R&D projects has been Invested on the basis of an annual technology demand survey rather than the research performance outcome. Therefore, it is important to establish a qualitative performance measurement model for evaluating construction R&D projects. This paper proposes a new research methodology for analyzing the performance measurement of the construction R&D projects. First of all, the Balanced Score Card (BSC) is used to evaluate the construction STAR technologies selected in this research. The performance items of BSC has been modified as four criteria such as "productivity, "knowledge accumulation," "training of students," and "welfare." The new research methodology developed in this paper is expected to use in establishing resonable construction R&D budget in the future.

A Management Performance Measurement Model of the Construction Engineering Firm -Focused on 'H' Construction Engineering Firm- (건설엔지니어링 기업의 경영성과측정모형 -H사의 사례를 중심으로-)

  • Park Chan-Sik;Kim Hyun-Jun;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.202-210
    • /
    • 2004
  • Under the current competitive business environment, the complexity of procurement method, and the lack of engineering capacity in the construction engineering industry, a construction engineering firms require the business strategy and its performance measurement system. This study suggests a performance measurement model that could follow 'H' construction engineering firm's vision and strategy. The model utilizes the concept of Balanced Scorecard. The study proposes the four main performance perspectives such as financial, growth, internal efficiency, and improvement & learning through the long-term strategy analysis, SWOT analysis, and interviews of the employees. Also the study develops the critical success factor and the key performance indicators. The usefulness of the performance measurement model is validated through the gap analysis such as alignment analysis and consensus analysis.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Development of the Construction Waste Management Performance Evaluation Tool (WMPET): Quantification of Waste Management Performance Factors and Establishment of Waste Management Performance Evaluation Tool (건설현장의 폐기물 관리 성과 평가 툴 개발 : 2단계 - 폐기물 관리 성과 요인의 전량화 및 평가 툴 구축)

  • Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.128-136
    • /
    • 2007
  • As the international-level concern has been focused on the environmental sustainability in recent years, many researches emphasized the needs for methods and techniques that would facilitate sustainability assessment at the various project level interfaces. As part of methods and techniques to facilitate sustainability assessment, this paper provides 'Computerized Waste Management Performance Evaluation Tool' for the purpose of assessing the level of management system in dealing with the onsite construction wastes. This tool applies twenty-three waste management performance factors for the purpose of evaluating the level of waste management performance by scoring those factors which were identified in the previous research. These twenty-three factors are classified into four categories: manpower, material, method, and management based on their characteristics. In order to quantitatively evaluate the effectiveness of waste management performance, the levels of actions executed in a site by each waste management performance factor were identified and their weight were analyzed throughout the expert interview and survey. Furthermore, an excel-based computerized tool was developed in order to facilitate the evaluation process. If this tool can be developed in more detail and be used as the method to control waste management at a project level for the future, it is expected that this tool can play an important role in the body of knowledge of environmental management in construction industry.

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

A Study of the Application for performance measurement on Domestic Construction Industry (건설산업 성과측정 기법 적용에 대한 연구)

  • Shin Yong-Il;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.285-290
    • /
    • 2001
  • There are some of the tools for measuring enterprise and group behavior on construction projects. Of these, performance is vital. But, because of imperfect factors, it came under attack. An enterprise can, however, improve it's problem with performance measurement. For this reason, it is essential tool for achieving objectives of an enterprise. Domestic construction industry must understand that what isn't measured, it not only can't manage it also can't improve. The objective of this study is to investigate the performance measurement tools and items in overseas construction projects(UK, Australia). Based on the data, the study suggests the considerable items, problems and restrictive factors as it is accepted on domestic construction industry.

  • PDF

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

Analysis of Factors Influencing the Construction Business Management Success (건설기업 경영성과의 영향요인 중요도분석)

  • Han, Jin-Taek;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.63-70
    • /
    • 2011
  • This research outlined the factors influencing the business management success via analyzing a survey of business principles. The research process has been tested in comparison of both financial factors, which come out of objective data and non-financial factors so relevantly prioritized by combining these factors. In order to specify the factors, a check-list and analyzed essential features of category have done with interviews and surveys. As consequently proceeding, the authors could deduce that non-financial but analytic factors such as business doable, technician workability, compensation and benefits etc. play major roles in construction sector. The outcomes consider a construction business as fundamental human labor job as opposed to a manufacture business. On reasoning necessarily more objective research works to be done as developing this research's outcome, it is meaningful in suggesting the pivotal factors influencing the construction business management. Therefore, this research is expected to guide the direction to induce the improvement of business management to be done by further exemplary researches.

Performance Measurement of ISO Quality Management System in the Construction Industry (건설산업 ISO 품질경영시스템의 성과측정에 관한 연구)

  • Lee Woo-Chang;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.414-418
    • /
    • 2004
  • Quality system of construction industry in Korea was a means to prevent unqualified construction work. But lately, it has became an essential requirement. So, lots of construction companies acquire ISO quality management system which provides fundamental management criteria. Now, most of the Korean construction companies have got IS0 quality management system. So, getting ISO quality management system doesn't mean advantage in public competition of construction bidding and that causes increase in the maintenance cost. That's why some construction companies abandon the 150 certificate. Therefore, the authors need to check the effect of ISO quality management system. For this, the authors provide the performance measurement index of ISO quality management system.

  • PDF