RFID-Based Concrete Pour Monitoring System Implementation (RFID 기반의 콘크리트 타설 모니터링 시스템의 구현)

  • Moon, Sung-Woo;Hong, Seung-Moon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.529-532
    • /
    • 2006
  • The application of ubiquitous technology offers many chances for improving construction management technologies. Currently the Construction System Integration Lab (CSIL) at Pusan National University is executing research on applying ubiquitous technology for better communication in the construction process. One of the research area is the implementation of RFID for monitoring the concrete pour process. The objective of this study is to collect data occurring in the process and use the data be properly planning concrete pour activities. Case study has been done on an actual concrete work. For the study a user environment was developed interfacing on internet with RFID devices that were installed in a batch plant and a construction site. The result of the test demonstrated that the RFID-based concrete monitoring can be a feasible approach for improving the communication in the construction process.

  • PDF

Current Status and Improvement Plan for Foreign Construction Laborer (외국인 건설 근로자 현황 및 개선방안)

  • Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.555-561
    • /
    • 2015
  • The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

The Prediction Model of a Working Pattern According to Working Time Reduction in Construction Sites (근로시간 단축에 따른 건설현장에서의 근로패턴 예측 Model)

  • Kim Hong-Ryul;Yu Il-Han;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.316-322
    • /
    • 2002
  • In case of reducing working time, it is difficult that the construction industry is analyzed far-reaching effects caused by a reduction of working time, by approaching with just the total amount of work. Because it has the properties such as the singularity, the outdoor using, a sense of the season unlike other industries. In order to analyze the effect of a reduction of working time on the construction industry, the example of a reduction of working time in domestic other industries related with it was analyzed intensively first. And an example in Japan, which is similar to our existing related laws and industrial structure among foreign construction industries was analyzed, and a relation with the domestic construction industries and an issue were drown a conclusion. This was applied to a field worker and a related main group participating in a real production. And it showed the prediction model for a working pattern and a dealing plan to prepare in a construction site by predicting a working pattern in the management side of a construction site annually.

  • PDF

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Study of Sensor Technology Analysis and Site Application Model for 3D-based Global Modeling of Construction Field (건설 시공현장의 3D기반 광대역 모델링을 위한 Sensor 기술 분석과 향후 현장적용 모델 연구)

  • Kwon, Hyuk-Do;Koh, Min-Hyeok;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.938-942
    • /
    • 2007
  • The importance of process improvement under construction has arisen from recent issue, lower productivity in the construction site. The various 3D modeling program is utilized in the procedure of construction as an alternative solution. However, it's still shortage of the consideration about a specific technical application. The purpose of the study in this paper is helpful to improve the productivity of construction site using 3D realization of constructing place as one of extensive modeling technologies, which leads to not only efficient management of construction site allowing people to check the real time situation in the place but also the revitalization of information flow about building process control and prgress, Therefore, I research into modeling algorithm and extensive construction site realization technology. 3D realization of building place would reduce the safety concerns by providing the real time information about construction site, and it could help to access easily to similar project through collecting and appling the database of sites. Furthermore it can be an opportunity to develop the procedure of production in construction industry and to upgrade the image of this field.

  • PDF

Productivity analysis using a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 적용시 생산성 분석)

  • Lim, So-Young;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.87-95
    • /
    • 2020
  • With the advent of the 4th industrial revolution and the combination of IoT, there have been diverse domestic and foreign researches for the development of construction industry. Especially, in the large-scale earthwork site where many and various construction equipments are put into, the control system between construction equipments is important for the increase of productivity. Thus, after developing the fleet management system for the optimum operation of construction equipments, the problems were checked and improved for each step in the process of application at site. In order to verify the site application process of the fleet management system for the optimum operation of construction equipments, the analysis on the productivity was performed by inputting the data used for the actual site and the site data using this system and then comparing the data through simulation. The analysis was limited to excavator and dump. In the results of the analysis, the rate of work per hour was increased to the range of 4 % while the cost price was decreased to 4 %. Even though the results of the analysis could be different depending on the site applied, the results showing the increase of workload of equipments and the decrease of cost price in the complex project at earthwork site verify the increase of productivity.

The Development of a Construction Productivity Prediction Model Based on Data Mining (데이터 마이닝 기반의 건설 생산성 예측 모델 개발)

  • Woo, Gi-Beom;Ahn, Jy-Sung;Oh, Se-Wook;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.813-818
    • /
    • 2007
  • Construction productivity is a key factor for efficiency evaluation of construction work process, project performance measurement, and basic data of work plan in construction industry. However, although construction productivity is important in construction industry, gathering methodology and analyzing methodology of productivity data are not well-organized therefore productivity data is not utilized in the construction industry The purpose of this study is to develop productivity prediction system using data mining technology based on activities and to suggest frameworks about productivity data collection, accumulation.

  • PDF

A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF

Reinforced-Concrete Works Productivity and Influence Factor Analysis on Nuclear-Power-Plant Project (원자력발전소 건설현장의 철근콘크리트 공종 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-Ho;Kim, Kyoung-Uk;Ahn, Young-Chul;Oh, Jae-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.314-321
    • /
    • 2014
  • Nuclear power plant projects are being increased all over the world. The construction of nuclear power plants needs huge money and time, which makes conducting a detailed analysis of productivity through the whole process. Reinforced-concrete works productivity field data was collected for more than one year and analyzed from a nuclear-power-plant project in Korea. The productivities of formwork, rebar-work, and concrete pouring were $0.54m^2/man{\cdot}day$, $0.06ton/man{\cdot}day$, $1.98m^3/man{\cdot}day$, respectively. Moreover, it is revealed that 'Day of the Week' is a driver of the formwork activity and 'Overtime' is for all of the three. The results will be a great interest of industry personnel estimating time and cost of a new nuclear power plant.

Diligence and Indolence Management System for Specialty Contractor on Construction Site -Using GPS of Smart Phone- (스마트 폰의 위성항법시스템(GPS)를 활용한 전문건설업체 현장 근태관리 체계 구축)

  • Ahn, Chi-Sun;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.56-66
    • /
    • 2012
  • The Recent Specialty Contractor in construction of the reduced quantity due to the recession, but competitive in order to increase the number of companies that are increasingly competitive. The field work of one person to perform the work of employees and multiple sites, workforce supply flow that occurs at each stage of information transfer is not made a late staffing. Therefore this research has proposed a new alternative that can overcome them and the entire industry in recent issue smart phone features that take advantage of GPS(Global Positioning System). This paper presents a Diligence and Indolence Management System using GPS of smart phone. offering the advantage of Web-based PMIS(Project Management Information System) through integration with real-time information transfer and smart phone applications for query by building a prototype of a professional construction company as their own on-site management measures are proposed to contribute time and attendance.