• Title/Summary/Keyword: 건설리스크

Search Result 335, Processing Time 0.025 seconds

Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development (건설 프로젝트 파이낸스(PF) 사업의 성공영향요인(KSF) 분석을 통한 사업성과 예측 모델)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.127-137
    • /
    • 2014
  • Project Financing (PF) development project is the type which influences national economy and building industry largely because it is exerted by using borrowed money from many kinds of investors and huge amount of financial raising. Many domestic PF projects are focused mainly on the profit maximization lacking in a sufficient feasibility study. Nowadays many projects are suspending due to the global finance debacle and stagnation of real estate industry. Therefore, in this paper, risk factors of PF project are deducted and Key Success Factors (KSFs) are derived through Factor-Analysis and qualified using Fuzzy-AHP method. And through the evaluation of the derived success factors in real projects, a strong correlationship has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). So, the result of this paper can help decision makers of the PF projects make a better decision and give a meaningful guidance in achieving successful PF projects.

A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements (고층건물 수직·수평 요소기반 골조공사 개산견적 모델)

  • Nam, Dong-Hee;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.3-10
    • /
    • 2014
  • High-rise buildings need thorough cost management because of large size and high risk. Cost management makes a budget by establishing and analyzing detail element at planning phase, needs cost control as each design phase, then reflected to next design. This research develops a schematic estimation model based on vertical and horizontal elements at design phase for structure cost of high-rise buildings to reduce error range and use data as design management. Usability of the model is confirmed by case study. The estimation model is expected to contribute to making the cost model more effective and satisfactory to concerned in construction or budget department and manage keeping track of the cost.

A Study on System for Policy Promotion of Korean Nuclear Power - Risk Governance with Additional Construction of Nuclear Power Plants - (한국 원자력 분야 정책추진체계 연구 - 고리원전추가건설사례로 본 위험거버넌스 구축 측면에서 -)

  • Lee, Sang-Yun;Yoon, Hong-Joo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.1
    • /
    • pp.81-94
    • /
    • 2015
  • The purpose of this study is to find ways to build a desirable risk governance to respond to these uncertainties like such as increased risk due to the rapid development of modern science and technology in S. Korea. This study is about model of risk communication with scientific technology for additional construction of nuclear power plants. This study analyzed risk communication with scientific technology through new explanatory models between approval opinions of scientific professional group and opposition opinions of the public with Kori nuclear power plant of S. Korea. And then This study investigated related system for policy promotion in the field of nuclear energy of the current S. Korea. Consequently, Governance to strengthen the negotiations on nuclear technology at the time of the interaction in risk communication have been identified and the future of policy direction of the Korean Standard Nuclear Power Plant was detected.

A Checklist and Manual Developed to Review Fire Safety Facilities' Compliance with Fire Safety Requirements for Apartment Buildings (공동주택 소방시설 적법성 검토를 위한 화재안전규정 체크리스트 및 매뉴얼 개발)

  • Jeong, Soo-jin;Park, Yoo-na;Kim, Jae-jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.94-102
    • /
    • 2018
  • Recently, there is a growing need to review compliance with legal requirements to ensure fire safety as the number of fires caused by noncompliant fire safety facilities in high-rise buildings has increased. While there are a large number of apartment buildings in Korea, there is a lack of review on fire safety facilities' compliance with fire safety requirements. The reason for this lack of review despite apartment buildings causing deaths due to their structural features in the event of a fire, lies in the misinterpretation of legal provisions as the Building Act and the Fire Services Act are mixed up; a final inspection when fire safety facilities are unnecessarily installed or missing could result in significant losses in terms of finances and time. Therefore, this study developed a checklist that makes it possible to review mixed-up legal requirements for fire safety facilities simultaneously, and examined the importance and current level of each item through IPA (Importance Performance Analysis). Based on these results, this study intends to develop a manual that considers its applicability to construction practices and contribute to reducing construction companies' fire safety inspection risks.

Probabilistic Applications for Estimating and Managing Project Contingency (확률이론을 이용한 프로젝트 예비비 산정 및 관리)

  • Lee Man-Hee;Yoo Wi-Sung;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.224-227
    • /
    • 2004
  • As a project progresses, it is well known that construction manager has to define the contingency for the expected project cost, which is used as a buffer for uncertainty. In this study, we mention uncertainty as the amount of likelihood that is difficult or impossible to predict project cost. From the completed work package, we obtain the true cost value, and this information is technically good data for estimating the realistic contingency of work packages to be accomplished. Based upon this historical information, construction manager recomputes the contingency for the remaining works. Conditional probability theory is often useful for re-estimating one of the remaining project progress as the true cost of the completed works can be different from the planned cost. As a project is progressing, true value is really important to predict the realistic project budget and to decrease the uncertainty. In this study, we gave applied conditional probability theory to estimating project contingency supposing a project that consists of fire work packages, provide the fundamental framework for setting and controlling project contingency.

  • PDF

Development of Reliability for Conceptual Cost Estimates in Construction Projects (건축프로젝트 개산견적 신뢰도 향상 방안)

  • An, Sung-Hoon;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.175-180
    • /
    • 2006
  • Total conceptual cost estimates and the assessment of the reliability of these estimates are critical in the early stages of a building construction project. The purpose of this study is to propose the method to clients or estimators for improving the reliability of conceptual cost estimates by evaluating the reliability of conceptual cost estimates. The data from 83 building construction projects were collected for this study. The results showed that the proposed method can propose alternatives to clients or estimators for improving the reliability of conceptual cost estimates with the process of evaluation, review and feedback. This process can assist clients in their evaluation of the reliability of the estimated cost and the probability of exceeding the target cost, and in their re-estimation after dealing with the elements that influence the conceptual cost estimate badly.

  • PDF

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

Estimation of Contingency for Highway Construction Project Using Regression Analysis (회귀분석을 이용한 고속도로 건설공사 예비비의 산정)

  • Yoon, Yoo Jung;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.617-626
    • /
    • 2006
  • The purpose of contingency estimate is to manage the increase in construction cost and the extension of the term of works due to the inevitable occurrence of uncertain situations. The aim of contingency strategies have two intentions. One thing, can be called a passive strategy, gets ready for construction cost increase due to uncertainty factors, the other thing, can be called a active strategy, gets rid of the obstruction factors of work prior to construction performance. Therefore, from the view point of medium and long term, there is necessary to accumulate data in conjunction with design modification cases and carefully analyze uncertainty factors from construction types and characters. Therefore, this thesis will analyze design modification case at a special work such as highway and select factors that affect construction cost and present contingency estimate process using regression analysis.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Proposed Sustainability Risk Framework through the Analysis of Advanced Donor Countries' International Development Cases (선진 공여국의 국제개발 사례 분석 기반 지속가능성 리스크 프레임워크 제안)

  • Lee, Kyung-Tae;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.12-23
    • /
    • 2023
  • The goal of international development projects is to assist sustainable development in recipient countries through foreign aid from donor countries. However, despite the need for both countries to negotiate and work together from the initial stages to maintain sustainability after the project, clear guidelines or standards have not been established. Additionally, despite the need for donor countries, which are relatively advanced, to understand the situation of recipient countries, many projects are donor-centric and fail to prioritize the value of sustainability. Therefore, this study extracted economic, social, and environmental risks that threaten sustainability through literature review and proposed a sustainability framework based on these criteria. To validate framework, actual international development cases conducted by advanced donor countries such as Australia, the United States, and Japan, in collaboration with South Korea, were analyzed by applying content analysis with the reports, which covers the overall contents from the planning stage to the operation stage. Analysis of sustainability perspectives focused on economy, society and the environment, advanced donor countries emphasized (1) the importance of pre-assessment, (2) the need for coordination with the local population and communities despite the existence of donor-specific values, and (3) addressing economic considerations such as pre-operational and maintenance costs, social communication with the local population, and environmental considerations starting from the initial stages of construction regarding the treatment of pollutants as values to be improved. Compared to other advanced donor countries, the Republic of Korea should also focus on consultation with local residents to achieve social integration, and improve sustainability by deployment the managers in local sites for better negotiation.The proposed framework in this study will serve as a tool to enhance communication among the countries and the locals, with the expectation of increasing project efficiency and sustainability.