Risk assessment for development of consecutive shield TBM technology (연속굴착형 쉴드 TBM 기술 개발을 위한 리스크 평가)

  • Kibeom Kwon;Hangseok Choi;Chaemin Hwang;Sangyeong Park;Byeonghyun Hwang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.4
    • /
    • pp.303-314
    • /
    • 2024
  • Recently, the consecutive shield tunnel boring machine (TBM) has gained attention for its potential to enhance TBM penetration rates. However, its development requires a thorough risk assessment due to the unconventional nature of its equipment and hydraulic systems, coupled with the absence of design or construction precedents. This study investigated the causal relationships between four accidents and eight relevant sources associated with the consecutive shield TBM. Subsequently, risk levels were determined based on expert surveys and a risk matrix technique. The findings highlighted significant impacts associated with collapses or surface settlements and the likelihood of causal combinations leading to misalignment. Specifically, this study emphasized the importance of proactive mitigation measures to address collapses or surface settlements caused by inadequate continuous tail void backfill or damaged thrust jacks. Furthermore, it is recommended to develop advanced non-destructive testing technology capable of comprehensive range detection across helical segments, to design a sequential thrust jack propulsion system, and to determine an optimal pedestal angle.

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process (리스크 평가절차 도입을 통한 VE 대안 평가방법 개선)

  • Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.32-42
    • /
    • 2018
  • Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.

산업재해와 리스크

  • 엄기형
    • 월간 기계설비
    • /
    • s.85
    • /
    • pp.102-105
    • /
    • 1997
  • 안전관리의 중요성은 오늘날 산업의 각 분야에서 중대한 문제로 등장하고 있다. 안전사고는 인명과 재산을 해치고 기업가에게 막대한 경제적 손실을 가져다 줄 뿐만 아니라 기업재산 손실과 노동력 희생을 경제 발전을 저해하고 기업 활동에 악영향을 미치기 때문이다. 따라서 경영자는 ${\ulcorner}$안전을 생산에 우선시켜야 한다${\lrcorner}$는 안전관리의 기본이념에 대한 확고한 인식을 지녀야 한다.

  • PDF

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.

Establishment of Analysis Process and Risk Management Model of Planning Phase in Private Development Project (민간 개발 프로젝트 기획단계의 분석절차 및 리스크 관리 모델 구축)

  • Heo Yeol;Kim Soo-Yong;Yang Jin-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.408-413
    • /
    • 2004
  • Early planning phase of private development project is an important part in mercy of failure and success of all project. Hut reliability of analysis result existing planning phase in not high to the importance. So we analyzed a basic problem point through case study and research data analysis of planning phase in private development project. After this, there is a cause in no establishment of systemic model about work processing and method of planning phase. We would like to suggest the solution through establishment of planning phase analysis processing and risk management model. We think that suggested analysis method increase the credibility of analysis result. With this, we anticipate we suggest the guideline in project process phase and that assist the effective accomplishment of project.

  • PDF

Cost.Benefit Risk Based Purchase Pricing Process Model for Feed in Tariffs of Photovoltaic Power Projects (비용.수익 리스크 기반 태양광사업 발전차액지원 기준가격 산정 프로세스 모델)

  • Kim, Se-Jong;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.113-121
    • /
    • 2010
  • Since the cut-down of the purchasing price of the feed in tariff(FIT) in 2008, the numbers of photovoltaic projects get decreased, contrary to investment expansion policy of government on renewable energy. The root cause of the decrease is the irrationality of the current purchasing price structure of FIT as well as the adversity of fund raising due to the global financial crisis. This study proposes the FIT calculating model (Cost & Benefit Risk Based Purchase Price Process : CBRP3) reflecting the fluctuation of cost and benefit risks. The first step is to establish the photovoltaic generation alternatives, and to calculate each distribution data of the investment and the power generation quantity. The FIT for each alternative is, then, assessed through simulations. Finally the proposed FIT scheme is compared to the present FIT scheme and future study subjects are derived.

Development of Competency Evaluation Model for Public Private Partnership to Establish Strategies for Overseas Expansion (해외진출 전략 수립을 위한 민관합작투자사업의 역량평가모델 개발)

  • Park, Hwan Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.391-402
    • /
    • 2022
  • With the number of social overhead capital(SOC) projects that introduce private capital on the rise, overseas construction global companies today need to establish and advance their overseas order strategies. In this context, the purpose of this study is to develop the public private partnership(PPP) capacity evaluation model for developing countries and use it for domestic overseas construction companies to establish strategies for overseas expansion. The PPP competency evaluation model analyzes the importance of PPP competency evaluation items and infrastructure environment competency evaluation items through a review of previous studies and an interview survey with overseas construction experts. Through the above analysis results and expert surveys, problems that may occur when overseas construction companies enter the PPP market were derived, and improvement measures were proposed. Countries with a high probability of overseas construction companies entering the PPP market were determined to be those that have a mature PPP system, low risk in construction, and a good entry environment with a high infrastructure market size and growth rate. In addition, a lack of PPP investment experience, the absence of information on the infrastructure environment, and a shortage of PPP experts were identified as problems when entering the overseas construction PPP market. As an improvement measure, it was suggested to enter in cooperation with domestic and foreign companies. In addition, a plan was proposed to develop a curriculum to secure experts in areas such as PPP finance and contracts and to provide PPP information for each country. These findings are expected to contribute to overseas construction companies proposing strategies for entering the overseas construction market and using them for overseas expansion strategies and policy establishment.

A Study on the Development of Construction Dispute Predictive Analytics Model - Based on Decision Tree - (PA기법을 활용한 건설분쟁 예측모델 개발에 관한 연구 - 의사결정나무를 중심으로 -)

  • Jang, Se Rim;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.76-86
    • /
    • 2021
  • Construction projects have high potentials of claims and disputes due to inherent risks where a variety of stakeholders are involved. Since disputes could cause losses in terms of cost and time, it is a critical issue for contractors to forecast and pro-actively manage disputes in advance in order to secure project efficiency and higher profits. The objective of the study is to develop a decision tree-based predictive analytics model for forecasting dispute types and their probabilities according to construction project conditions. It can be a useful tool to forecast potential disputes and thus provide opportunities for proactive management.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.